Laserfiche WebLink
2/8/2022 City of Everett Page %' <br /> 7:09:17AM <br /> INSPECTION ACTIVITY REPORT <br /> 9/10/2020 9/11/2020 BLDG KMK CORRECTION See notes DO NOT Jon 206-850-8542 <br /> 08-FRAMING INSULATE <br /> (9/11/2020 7:11 AM KMK) <br /> 1.Hangar timber strand beams to GLB at <br /> entry area <br /> 2.Post up in walls to provide full bearing <br /> under beams(various locations) <br /> 3.Fire block at top of wall cavities and <br /> mechanical chases in basement.(various <br /> locations) <br /> 4.Add anchor bolts at cut bottom plate in <br /> garage(West side) <br /> DO NOT INSULATE <br /> 9/15/2020 9/15/2020 BLDG KMK APPROVAL <br /> 08-FRAMING <br /> 9/17/2020 9/17/2020 BLDG KMK APPROVAL Ok to sheet rock, <br /> 11-INSULATION mud,and tape <br /> 10/22/2020 10/22/2020 PLUMB 05-OTHER SDP APPROVAL shower pan test 10/21/2020 8:40 AM WESTROCK <br /> CONSTRUCTION LLC <br /> Shower pan inspection <br /> AM inspection if possible <br /> Contact Name:WESTROCK <br /> CONSTRUCTION LLC <br /> Site Address:1528 GRAND AVE <br /> Phone:2067785898 <br /> e-Mail:jon@westrockcon.com <br /> 12/29/2020 12/29/2020 MECH 06-FINAL SDP APPROVAL eTRAKiT Inspection 12/23/2020 2:27 PM WESTROCK <br /> Request CONSTRUCTION LLC <br /> Contact Name:WESTROCK <br /> CONSTRUCTION LLC <br /> Site Address: 1528 GRAND AVE <br /> Phone:2067785898 <br /> e-Mail:jon@westrockcon.com <br /> 12/29/2020 12/29/2020 GAS 03-FINAL SDP APPROVAL <br /> 12/29/2020 12/29/2020 PLUMB 06-FINAL SDP APPROVAL <br /> 1/5/2021 1/5/2021 TEMP KMK APPROVAL complete PW final 12/29/2020 2:21 PM WESTROCK <br /> CERTIFICATE OF CONSTRUCTION LLC <br /> Contact Name:WESTROCK <br /> CONSTRUCTION LLC <br /> Site Address: 1528 GRAND AVE <br /> Phone:2067785898 <br /> e-Mail:jon@westrockcon.com <br /> 6/22/2021 6/22/2021 PERMIT KLC EXTENSION A COVID <br /> EXTENSION EXTENSION <br /> 2/7/2022 2/7/2022 BLDG 16-FINAL KMK APPRVD-PERN <br /> INSP12 Gies STeMS <br />