My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1528 GRAND AVE 2022-04-01
>
Address Records
>
GRAND AVE
>
1528
>
1528 GRAND AVE 2022-04-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2022 2:15:29 PM
Creation date
4/1/2022 2:14:15 PM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
1528
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Construction Stormwater Plan: <br /> All new development and redevelopment projects are responsible for preventing erosion and <br /> sedimentation during construction. Each of the 13 requirements below contains a list of BMPs that are <br /> accepted by the Department of Ecology for satisfying each requirement. (For more information on each <br /> BMP, please go to Chapter 4 in Volume II of Ecology's Stormwater Management Manual for Western <br /> Washington: https://fortress.wa.gov/ecy/publications/parts/1410055part4.pdf). <br /> Please select all BMPs that you will be using to satisfy each requirement,and where applicable,show <br /> these items on a map of your project.All requirements must have at least one item selected: <br /> 1. Preserve Vegetation/Mark Clearing Limits: <br /> ❑BMP C101: Preserving Natural Vegetation <br /> ❑BMP C102: Buffer Zones <br /> ►_�BMP C103: High Visibility Plastic or Metal Fence <br /> 2. Establish Construction Access: <br /> El BMP C105: Stabilized Construction Entrance/Exit <br /> ®BMP C106: Wheel Wash <br /> ❑BMP C107: Construction Road/Parking Area Stabilization <br /> 3. Control Flow Rates: <br /> ❑BMP C203: Water Bars <br /> ®BMP C240: Sediment Trap <br /> ❑BMP C241:Temporary Sediment Pond <br /> ❑Not Applicable To My Proposed Project <br /> 4. Install Sediment Controls: <br /> EBMP C231: Brush Barrier <br /> ❑BMP C232:Gravel Filter Berm <br /> ®BMP C233: Silt Fence <br /> ❑BMP C234:Vegetated Strip <br /> ❑BMP C235:Wattles <br /> ►Z1 BMP C240: Sediment Trap <br /> ❑BMP C241:Temporary Sediment Pond <br /> 5. Stabilize Soils: <br /> E1 BMP C120:Temporary and Permanent Seeding <br /> ►Z1 BMP C121: Mulching <br /> ❑BMP C122: Nets and Blankets <br /> ®BMP C123: Plastic Covering <br /> ❑BMP C124:Sodding <br /> ❑BMP C125:Topsoiling/Composing <br /> ❑BMP C126: Polyacrylamide for Soil Erosion Protection <br /> ❑BMP C130: Surface Roughening <br /> ❑BMP C131:Gradient Terraces <br /> ❑BMP C140: Dust Control <br /> --Rage 6 of 7_.� <br />
The URL can be used to link to this page
Your browser does not support the video tag.