My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1528 GRAND AVE 2022-04-01
>
Address Records
>
GRAND AVE
>
1528
>
1528 GRAND AVE 2022-04-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2022 2:15:29 PM
Creation date
4/1/2022 2:14:15 PM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
1528
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GeoTest Services, Inc. Report Date 7/17/2019 <br /> Anderson Residence- Everett, Washington GTS Project No.19-0384 <br /> " ;."'?° <br /> Wet Weather Earthwork <br /> Fine grained native soils are particularly susceptible to degradation during wet <br /> weather. As a result, it may be difficult to control the moisture content of site soils <br /> during the wet season. If construction takes place during wet weather, GTS <br /> recommends that structural fill consist of imported, clean, well-graded sand or sand <br /> and gravel as described above. If fill is to be placed or earthwork is to be performed in <br /> wet conditions, the contractor may reduce soil disturbance by: <br /> • Limiting the size of areas that are stripped of topsoil and left exposed <br /> • Accomplishing earthwork in small sections <br /> • Limiting construction traffic over unprotected soil <br /> • Sloping excavated surfaces to promote runoff <br /> • Limiting the size and type of construction equipment used <br /> • Providing gravel 'working mats' over areas of prepared subgrade <br /> • Removing wet surficial soil prior to commencing fill placement each day <br /> • Sealing the exposed ground surface by rolling with a smooth drum compactor <br /> or rubber-tired roller at the end of each working day <br /> • Providing up-gradient perimeter ditches or low earthen berms and using <br /> temporary sumps to collect runoff and prevent water from ponding and <br /> damaging exposed subgrades <br /> Foundation Support <br /> Based on limited sawcuts performed by others through the existing basement floor, <br /> we understand that the existing residence was originally constructed on shallow <br /> conventional footings. Any time new construction abuts existing construction, there <br /> is a risk of differential settlement between the two phases of construction that must <br /> be considered. GTS generally recommends that the foundations for new construction <br /> be extended below existing foundations so that the existing foundations are not <br /> surcharged. If new foundations are not able to be extended below existing <br /> foundations, GTS recommends that the structural loads immediately adjacent to the <br /> existing foundations be kept relatively low to mitigate the risk of differential <br /> settlement. <br /> Based on the subsurface conditions encountered in our explorations, shallow <br /> conventional foundations constructed upon firm and unyielding native soils or <br /> properly compacted structural fill overlying firm and unyielding soils are suitable for <br /> the proposed construction. The presence of loose, previously placed fill soils and <br /> generally loose Recessional Outwash suggests that foundation subgrades should <br /> be remedially compacted to a firm and unyielding condition prior to the <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.