My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1528 GRAND AVE Geotech Report 2022-10-25
>
Address Records
>
GRAND AVE
>
1528
>
Geotech Report
>
1528 GRAND AVE Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 2:02:41 PM
Creation date
4/1/2022 2:19:49 PM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
1528
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> GeoTest Services, Inc. Report Date 7/17/2019 <br /> Anderson Residence-Everett, Washington GTS Project No.19-0384 <br /> Floor Support <br /> Conventional slab-on-grade floor construction is feasible for the planned site <br /> improvements. Floor slabs may be supported on properly prepared native subgrade <br /> or on properly placed and compacted structural fill placed over properly prepared <br /> native soil. Prior to placement of the structural fill, the native soil should be proof- <br /> rolled as recommended in the Site Preparation and Earthworksection of this report. <br /> GTS recommends that interior concrete slab-on-grade floors be underlain with at <br /> least 6 inches of clean, compacted, free-draining gravel. The gravel should contain <br /> less than 3 percent passing the U.S. Standard No. 200 sieve (based on a wet sieve <br /> analysis of that portion passing the U.S. Standard No. 4 sieve). The purpose of this <br /> gravel layer is to provide uniform support for the slab, provide a capillary break, and <br /> act as a drainage layer. To help reduce the potential for water vapor migration <br /> through floor slabs, a continuous 10-mil minimum thick polyethylene sheet with tape- <br /> sealed joints should be installed below the slab to serve as an impermeable vapor <br /> barrier. The vapor barrier should be installed and sealed in accordance with the <br /> manufacturer's instructions. <br /> The American Concrete Institute (ACI) guidelines suggest that the slab may either be <br /> poured directly on the vapor barrier or on a granular curing layer placed over the vapor <br /> barrier depending on construction conditions. GTS recommends that the architect or <br /> structural engineer specify if a curing layer should be used. If moisture control within <br /> the building is critical, we recommend a representative of GTS observe the vapor <br /> barrier to confirm that joints and penetrations have been properly sealed. <br /> Exterior concrete slabs-on-grade, such as sidewalks, may be supported directly on <br /> undisturbed native soil or on properly placed and compacted structural fill; however, <br /> long-term performance will be enhanced if exterior slabs are placed on a layer of <br /> clean, durable, well-draining granular material. <br /> Foundation and Site Drainage <br /> Positive surface gradients should be provided adjacent to the proposed building to <br /> direct surface water away from the building and toward suitable drainage facilities. <br /> Roof drainage should not be introduced into the perimeter footing drains but should <br /> be separately discharged directly to the stormwater collection system or similar <br /> municipality-approved outlet. Pavement and sidewalk areas, if present, should be <br /> sloped and drainage gradients should be maintained to carry surface water away <br /> from the building towards an approved stormwater collection system. Surface water <br /> should not be allowed to pond and soak into the ground surface near buildings or <br /> - <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.