My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1329 MADRONA AVE 2022-04-01
>
Address Records
>
MADRONA AVE
>
1329
>
1329 MADRONA AVE 2022-04-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2022 3:56:23 PM
Creation date
4/1/2022 3:08:19 PM
Metadata
Fields
Template:
Address Document
Street Name
MADRONA AVE
Street Number
1329
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11: Maintain BMPs <br />The construction supervisor will be responsible for maintaining all BMPs during construction <br />and working with the City to relocate or add BMPs as necessary as site conditions change. <br />BMPs should be inspected and maintained as needed after every rain event producing more <br />than %" of rain in a 24-hour period. Also, BMPs shall be inspected on a weekly basis even <br />if site work is not occurring. <br />12: Manage the Project <br />It will be the responsibility of the Contractor and Developer to manage this project and <br />coordinate with the City Inspector and Engineer. <br />Inspection and Monitoring: <br />Site inspections shall be done by a person who is knowledgeable in the principles and <br />practices of erosion and sediment control. The person must have skills to first assess the <br />site conditions and construction activities that could impact the quality of stormwater, and <br />second assess the effectiveness of erosion and sediment control measures used to control <br />the quality of stormwater discharges. Whenever inspection and/or monitoring reveals that <br />the BMPs identified in the Construction SWPPP are inadequate, due to the actual discharge <br />of or potential to discharge a significant amount of any pollutant, appropriate BMPs or design <br />changes shall be implemented as soon as possible. <br />Maintaining an Updated Construction SWPPP: <br />The construction SWPPP shall be retained on -site or within reasonable access to the site. <br />The SWPPP shall be modified whenever there is a change in the design, construction, <br />operation, or maintenance at the construction site that has, or could have, a significant effect <br />on the discharge of pollutants to waters of the state. <br />The SWPPP shall be modified if, during inspections or investigations conducted by the <br />owner/operator, or the applicable local or state regulatory authority, it is determined that the <br />SWPPP is ineffective in eliminating'or significantly minimizing pollutants in stormwater <br />discharges from the site. The SWPPP shall be modified as necessary to include additional <br />or modified BMPs designed to correct problems identified. Revisions to the SWPPP shall <br />be completed within seven days following 'inspection. <br />13: Protect On -Site Stormwater Management BMPs for Runoff from Hard Surfaces <br />No infiltration or dispersion BMPs are proposed for this project. <br />Mazza SFR 19-1014 <br />November 2019 <br />Revised: Apn7 2020 Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.