Laserfiche WebLink
Subsurface Exploration,Geologic Hazard,and <br /> lanowicz Property Geotechnical Engineering Report <br /> Everett,Washington Preliminary Design Recommendations <br /> accurately recorded throughout the test. The test anchors should be capable of holding the <br /> ultimate load without excessive yield or creep so that a factor of safety of at least 2.0 is <br /> achieved. A linear or near-linear relationship between the unit anchor stresses and related <br /> movement would indicate a successful anchor test. The other component of the anchor tests <br /> for the project would be proof-loading each of the production anchors to 130 percent of the <br /> design load. Each anchor should withstand this load for at least 5 minutes. If the creep in the <br /> first 10 minutes is less than 0.04 inches, then the anchor is considered acceptable. If the <br /> • <br /> elongation is greater than 0.04 inches, the load is held for an additional 50 minutes, and the <br /> movement readings are recorded at 10-minute intervals. If the creep rate in this additional <br /> period does not exceed 0.08 inches and is decreasing, the anchor is acceptable. The anchor <br /> should then be locked-off at the design load. The anchors should also be provided with <br /> secondary grout tubes in the event that anchor failure occurs during pullout proof-testing. <br /> After secondary grouting,the anchor can then be re-tested. <br /> • <br /> Subsequent to locking-off the tiebacks at the design load, all of the tieback holes should be <br /> backfilled to prevent possible collapse of the holes and any related consequences. Typically, <br /> CDF is used as backfill material; however, most non-cohesive mixtures are suitable (subject to <br /> approval by the geotechnical engineer)provided there is no bonding to the tierods. <br /> Since completion of the piling takes place below ground, the judgment and experience of the <br /> geotechnical engineer or their field representative must be used for determining the <br /> acceptability of each pile. Consequently,the use of the presented design information requires <br /> that all piles be inspected by a qualified geotechnical engineer or engineering geologist from <br /> our firm who can interpret and collect the installation data and observe the contractor's <br /> operations. AESI, acting as the owner's field representative, would keep records of pertinent <br /> installation data. A final summary report would then be distributed following completion of <br /> pile installation. <br /> 12.0 FOUNDATIONS <br /> We recommend that areas of proposed new foundations are supported by the native <br /> non-glacial sediments underlying the existing colluvium and landslide deposits. Based on the <br /> explorations performed for this study, we anticipate that suitable soils for foundation support <br /> are present below a depth of approximately 20 to 28 feet below the existing ground surface at <br /> the locations of our explorations,and must be capable of resisting a lateral load. Therefore,we <br /> recommend the use of a drilled pier or augercast pile foundation system for the proposed new <br /> foundations. <br /> 12.1 Augercast Piles <br /> We recommend cast-in-place concrete piles (augercast) be used for foundation support. <br /> The depth to the bearing stratum is in excess of 20 feet and therefore will preclude the use of <br /> May 10,2018 ASSOCIATED EARTH SCIENCES,INC. <br /> NSfta-170649E002-2-Projects}201706491KEIWP Page 17 <br />