|
A I B I C I D I E I F I G A H
<br /> AERIAL VIEW ELECTRICAL NOTES GENERAL NOTES
<br /> ' , , 1. WHERE ALL TERMINALS OF THE 1. PRIOR TO THE COMMENCEMENT OF ANY
<br /> itit !' , ' '• - a _ _ � DISCONNECTING MEANS MAY BE WORK, THE CONTRACTOR SHALL NOTIFY
<br /> �' x --� ENERGIZED IN THE OPEN POSITION, A -�
<br /> ;t-,,; THE DESIGNER OF ANY DISCREPANCIES
<br /> - ,� SIGN WILL BE PROVIDED WARNING OF WITH THE DESIGN IN ANY CAPACITY.
<br /> r '.i` THE HAZARDS. (PER ART.
<br /> � ,�� '" �.-. 690.17) ESPECIALLY RECOMMENDATIONS, CODES,
<br /> . . ' 2. EACH UNGROUNDED CONDUCTOR OF OR REGULATIONS & RULES OF THE
<br /> '4,4' '.-. THE MULTIWIRE BRANCH CIRCUIT WILL AUTHORITY HAVING JURISDICTION,WHICH
<br /> ; , BE IDENTIFIED BY PHASE AND SYSTEM. SUPERSEDED THE NEC. —
<br /> 1, _,- _ I'u,, (PER ART. 210.5) 2. ALL DIMENSIONS TO BE VERIFIED BY
<br /> 44 t fin 3. A NATIONALLY RECOGNIZED TESTING CONTRACTOR PRIOR TO COMMENCEMENT
<br /> :* LABORATORY SHALL LIST ALL OF WORK.
<br /> `j!.,:,' ,,,:11.,,,: EQUIPMENT IN COMPLIANCE WITH 3. CONTRACTOR IS RESPONSIBLE FOR ALL
<br /> .0- ARTICLE 110.3. SAFETY PRECAUTIONS, OSHA
<br /> N 4. ALL WIRES SHALL BE PROVIDED WITH REQUIREMENTS ETC. FOR THE SITE, N
<br /> i 3` ,. STRAIN RELIEF AT ALL ENTRY POINTS INCLUDING EXISTING SITE HAZARDS.
<br /> :: INTO BOXES AS REQUIRED BY UL LISTING 4. SYSTEM IS GRID INTERACTIVE/INTERTIED
<br /> e 5. MODULE FRAMES SHALL BE GROUNDED VIA A UL LISTED POWER-CONDITIONING
<br /> I'' AT THE UL-LISTED LOCATION PROVIDED INVERTER.
<br /> _ ' _ t BY THE MANUFACTURER USING 5. SYSTEM HAS NO ENERGY STORAGE OF
<br /> 1 OIL J x r*ii UL-LISTED GROUNDING HARDWARE. ANY KIND, OR UPS. —
<br /> ' 6. MODULE FRAMES, RAIL, AND POSTS
<br /> :. ? .: _11 1s 6. ALL SOLAR MOUNTING FRAMEWORK TO
<br /> `. SHALL BE BONDED WITH EQUIPMENT BE GROUNDED.
<br /> ---- .__.. _.h__ �,. GROUND CONDUCTORS AND GROUNDED 7. FOLLOW MANUFACTURERS SUGGESTED
<br /> ,f j 3--', .e AT THE MAIN ELECTRICAL PANEL. INSTALLATION PRACTICES AND WIRING
<br /> ., ",, - " _ . ` ,.„ 7. THE DC GROUNDING ELECTRODE SPECIFICATIONS.
<br /> w
<br /> CONDUCTOR SHALL BE SIZED 8. ALL WORK TO BE IN COMPLIANCE WITH
<br /> RESIDENCE PHOTO
<br /> ACCORDING TO ARTICLE 250.166B & THE INTERNATIONAL BUILDING CODES.
<br /> 690.47. (IBC)
<br /> t" - 9. ALL ELECTRICAL WORK TO BE IN
<br /> t,"? ����10R sONFS COMPLIANCE WITH THE NATIONAL
<br /> ' •� ��oF\NAy%� ELECTRIC CODE (NEC). —
<br /> J , -
<br /> 'a 201148.8 Q
<br /> •
<br /> ASS/ONALE �
<br /> 11/11/2020
<br /> STRUCTURAL ONLY
<br /> a SHEET INDEX_
<br /> it i ' 1.l :- PV 1 COVER PAGE PV 5 MOUNTING DIAGRAM
<br /> �, PV 2 SITE PLAN PV 6 PLACARD
<br /> '"' `° Y _.._-- PV 3 ELECTRICAL DIAGRAM CUT SHEETS ATTACHED
<br /> - PV 4 CHIKO MOUNTING
<br /> DRAWN BY: DRAWING SCALE:
<br /> CONFIDENTIAL-THE INFORMATION CONTAINED KAM CUSTOM
<br /> IN THIS PACKET AND SUBSEQUENT CUTSHEETS Georgia Hallett DATE:
<br /> DESIGN
<br /> SHALL NOT BE USED FOR THE BENEFIT OF SOLGEN POWER
<br /> Arl SOLGEN ANYONE OUTSIDE SOLGEN POWER. NEITHER 5100 ELM RD, 11/10/2020 SHALL IT BE DISCLOSED TO OTHERS OUTSIDE PASCO, WA 993011
<br /> THE RECIPIENT'S ORGANIZATION, EXCEPT IN
<br /> POWER CONNECTION WITH THE SALE AND USE OF THE P: 509-931-1663 211 Barbara LN. , Everett, WA 98203 PAGE#
<br /> RESPECTIVE EQUIPMENT, WITHOUT WRITTEN P\/ 1
<br /> CONSENT FROM SOLGEN POWER.
<br />
|