8of23 <br /> Friday, July 23, 2021 '' <br /> P <br /> ,_ \ <br /> czrnEDE nmnov FOUNDATION SPECIALJST <br /> a a <br /> 1 <br /> Crew will install 3"Helical Piles and lift home to maximum practical recovery. Crew will drive piles to a maximum 25'after there <br /> will be a$20 a foot charge per pile. Dingo accessible. Homeowner will remove plants. <br /> L120 is in concurrence with pile layout recommended by R&R provided that the proposed layout is followed as marked and that a <br /> maximum pile spacing of 6'-0"o.c.is achieved. Reference SSK-01. <br /> NOTES: <br /> 1. It is acceptable to install piles at the spacing shown with±0'-6"tolerance to allow for unexpected obstructions encountered <br /> during pile installation provided that no two adjacent spans exceed the spacing limitation of 6'-0"o.c. <br /> 2. End piles are to be placed as close to corners as possible and shall not exceed a maximum corner distance of 3'-0"as marked. <br /> V E . g C <br /> Access , 57 <br /> n Jlt <br /> o <br /> ® c/8 -3/4 -1/2 ?-1/2 • -5/8 • <br /> OT <br /> -LOCATE PILE <br /> o W ITHIN 2FT MAX OF.CORNER-{�3l4 - <br /> -5/8 <br /> g ' 1,/2 x -1/2• m <br /> d, <br /> E s <br /> 00 ? # <br /> 1 0 ,' ,24 ) 0 <br /> • • r _ - <br /> 12 5' N . i µ. <br /> i <br /> , <br /> s t - x <. <br /> , <br /> SVV' <br /> ( 4 <br /> Addition • 1. <br /> , <br /> - =-I" Helical Pile N <br /> t <br /> 24' 1 ` <br /> NOTE:L120's scope is limited to the perimeter support systems/continuous footings of the primary structure.All stabilization and replacement efforts of <br /> exterior decks and deck supporting elements are outside of L120's contract and scope and are not addressed in this package. -L120 <br />