My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
302 BRIDGEWAY 2022-04-04
>
Address Records
>
BRIDGEWAY
>
302
>
302 BRIDGEWAY 2022-04-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2022 10:46:51 AM
Creation date
4/4/2022 10:46:07 AM
Metadata
Fields
Template:
Address Document
Street Name
BRIDGEWAY
Street Number
302
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9/14/2021 . City of Everett Page L <br /> 8:51:41AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. P2105-022 Site Address 302 BRIDGEWAY <br /> Applied 5/19/2021 Applicant Kayleigh McNiel Lot <br /> Approved 5/20/2021 Owner Kayleigh McNiel Block <br /> Issued 5/20/2021 Contractor OWNER Tract <br /> Parent Permit No. B2104-070 Description plumb and install toilet,sink,and shower-convert closet t <br /> Notes convert closet to bathroom <br /> (8/12/2021 3:29 PM TAH) <br /> reed and approved revision that eliminates the shower being installed in the new bathroom <br /> Scheduled Completed Tune Inspector Result Remarks Inspector's Comments <br /> 6/18/2021 6/18/2021 PLUMB TAHU CORRECTION eTRAKiT Inspection 6/17/2021 8:29 AM Kayleigh McNiel <br /> 03-ROUGH IN Request morning inspection preferred <br /> Contact Name:Kayleigh McNiel <br /> Site Address:302 BRIDGEWAY <br /> Phone:3604304742 <br /> e-Mail:kay.mcniel@gmail.com <br /> (6/18/2021 3:35 PM TAHU) <br /> Methods and materials used incorrectly,I <br /> advise you to hire a Washington state <br /> licensed plumber <br /> 1)UPC 901.2 vent required, .You have the <br /> 3x2 combo installed backwards and is <br /> reduced down to 1 1/2 for the vent going <br /> out of the roof, <br /> 2)shower drain is not vented correctly and <br /> is 1 1/2.UPC chapter 7 sanitary drains, <br /> table 702.1. <br /> 3)install shower valve in wall with shower <br /> head. <br /> 4)701.3 Drainage fitting„&706.0 <br /> Changes of Direction of drainage flow.You <br /> can not use a heel out fora vertical <br /> drainage fitting <br /> 6/25/2021 6/25/2021 PLUMB SDP CORRECTION eTRAKiT Inspection 6/24/2021 9:56 AM Kayleigh McNiel <br /> 03-ROUGH IN Request <br /> Contact Name:Kayleigh McNiel <br /> Site Address:302 BRIDGEWAY <br /> Phone:3604304742 <br /> e-Mail:kay.mcniel@gmail.com <br /> (6/25/2021 2:32 PM SDP) <br /> 1)As noted on your approved set of plans, <br /> the shower does not have 30"X 30"at a <br /> height of 6'-8". <br /> 2)The location of the toilet must have 21" <br /> clear in front of the bowl and be capable of <br /> being used for its intended purpose.see IRC <br /> section 305 <br /> 3)Waste and vents are still not to code.The <br /> vent for the toilet is backwards and on the <br /> main line,not the trap arm.I would suggest <br /> you look into horizontal wet venting as a <br /> possible solution for this bathroom. <br /> 4)The air admittance valve at the lavatory <br /> must be accessible for service and <br /> replacement.It must be exposed to air in <br /> order to work properly.You must install it <br /> outside of the wall or provide some sort of <br /> box with louver.(Oatey makes them). <br /> INSP12 CI?WSYSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.