Laserfiche WebLink
PLANS PREPARED FOR: <br /> MODIFICATION INSPECTION CHECKLIST <br /> CROWN <br /> BEFORE CONSTRUCTION DURING CONSTRUCTION AFTER CONSTRUCTION �„�I/ CASTLE <br /> CONSTRUCTION/INSTALLATION INSPECTION i CONSTRUCTION/INSTALLATION INSPECTION CONSTRUCTION/INSTALLATION INSPECTION PLANS PREPARED BY: <br /> AND TESTING REQUIRED(COMPLETED BY ' REPORT ITEM AND TESTING REQUIRED(COMPLETED BY REPORT ITEM AND TESTING REQUIRED(COMPLETED BY REPORT ITEM <br /> ENGINEER OF RECORD) ENGINEER OF RECORD) ENGINEER OF RECORD) 1POD <br /> X MODIFICATION INSPECTION CHECKLIST DWG X CONSTRUCTION INSPECTION(AS REQUIRED MODIFICATION INSPECTOR REDLINE OR <br /> BY CROWN) X RECORD DRAWING(S) POWER OF DESIGN <br /> - <br /> ENGINEER OF RECORD APPROVED SHOP POST INSTALLED ANCHOR ROD PULL-OUT 1033 E.TURKEYFOOT LAKE RD. <br /> DRAWINGS FOUNDATION INSPECTION TESTING SUITE 206 A0K9RO N,O HIIO 44312 <br /> 332 <br /> - FABRICATION INSPECTION - CONCRETE COMP.STRENGTH AND SLUMP X PHOTOGRAPHS <br /> TEST CARRIER: <br /> X MATERIAL TEST REPORT POST INSTALLED ANCHOR ROD VERIFICATION T • •Mobile• <br /> ADDITIONAL TESTING AND INSPECTION <br /> - FABRICATOR NDE INSPECTION - BASE PLATE GROUT VERIFICATION <br /> DRAWING NOTICE: <br /> NDE REPORT OF MONOPOLE BASEPLATE(AS THESE DOCUMENTS ARE CONFIDENTIAL AND ARE <br /> - <br /> REQUIRED) - THIRD PARTY CERTIFIED WELD INSPECTION THE SOLE PROPERTY OF CROWN CASTLE AND MAY <br /> NOT BE REPRODUCED,DISSEMINATED OR <br /> REDISTRIBUTED WITHOUT THE EXPRESS WRITTEN <br /> X ; PACKING SLIP - EARTHWORK LIFT AND DENSITY (REPORT CONSENT OF CROWN CASTLE. <br /> REQUIRED) <br /> MODIFICATION DRAWING <br /> ADDITIONAL TESTING AND INSPECTION X ON SITE COLD GALVANIZING VERIFICATION <br /> 6/75/2027 <br /> - GUY WIRE TENSION REPORT <br /> 4,ORGE C. <br /> X GC AS-BUILT DOCUMENTS ,07'�0Fg1,S �tA, <br /> t <br /> ADDITIONAL TESTING AND INSPECTION(AS REQUIRED BY CROWN) ,s <br /> MODIFICATION INSPECTION NOTES: INSPECTION("FAILED MODIFICATION INSPECTION"),THE GC SHALL WORK WITH �"P0 R�579E <br /> • REVIEW THE REQUIREMENT OF THE MODIFICATION INSPECTION CHECKLIST MODIFICATION INSPECTOR TO COORDINATE A REMEDIATION PLAN IN ONE OF r'ISTK" <br /> GENERAL: TWO WAYS: �SSIONAL'$' • WORK WITH THE MI INSPECTOR TO DEVELOP A SCHEDULE TO CONDUCT <br /> 1. THE MODIFICATION INSPECTION IS A VISUAL INSPECTION OF TOWER ON-SITE MODIFICATION INSPECTIONS,INCLUDING FOUNDATION INSPECTIONS • CORRECT FAILING ISSUES TO COMPLY WITH THE SPECIFICATIONS CONTAINED IN <br /> MODIFICATION AND A REVIEW OF CONSTRUCTION INSPECTION AND OTHER THE ORIGINAL CONTRACT DOCUMENTS AND COORDINATE A SUPPLEMENT , J a <br /> REPORTS TO ENSURE THE INSTALLATION WAS CONSTRUCTED IN ACCORDANCE • BETTER UNDERSTAND ALL INSPECTION AND TESTING REQUIREMENTS MODIFICATION INSPECTION.OR,WITH TOWER OWNER'S APPROVAL,THE GC <br /> WITH THE CONTRACT DOCUMENTS.NAMELY THE MODIFICATION DRAWINGS.,AS MAY WORK WITH THE ENGINEER OF RECORD TO REXANALYZE THE EV. DATE D •IPTION <br /> DESIGNED BY THE ENGINEER OF RECORD. 2. THE GC SHALL PERFORM AND RECORD THE TEST AND INSPECTION RESULTS IN MODIFCATION/REINFORCEMENT USING AS-BUILT CONDITION. <br /> ACCORDANCE WITH THE REQUIREMENTS OF THE MODIFICATION INSPECTION <br /> 2. THE MODIFICATION INSPECTION IS TO CONFIRM INSTALLATION CONFIGURATION CHECKLIST. VERIFICATION INSPECTIONS: <br /> AND WORKMANSHIP ONLY AN IS NOT A REVIEW OF THE MODIFICATION DESIGN <br /> ITSELF.NOR DOES THE MODIFICATION INSPECTOR TAKE OWNERSHIP OF THE RECOMMENDATIONS: 1. TOWER OWNER RESERVES THE RIGHT TO CONDUCT A VERIFICATION INSPECTION <br /> MODIFICATION DESIGN.OWNERSHIP OF THE STRUCTURAL MODIFICATION DESIGN TO VERIFY THE ACCURACY AND COMPLETENESS OF PREVIOUSLY COMPLETED <br /> EFFECTIVENESS AND INTENT RESIDES WITH THE ENGINEER OF RECORD AT ALL 1. IT IS SUGGESTED THAT THE GC PROVIDE A MINIMUM OF 5 BUSINESS DAYS MODIFICATION AND INSPECTION(S)ON TOWER MODIFICATION PRODUCTS. <br /> TIMES. NOTICE,TO THE MODIFICATION INSPECTOR AS TO WHEN THE SITE WILL BE <br /> READY FOR HE MODIFICATION INSPECTION TO BE CONDUCTED. 2. VERIFICATION INSPECTION MAY BE CONDUCTED BY AN INDEPENDENT FIRM AFTER SITE INFORMATION: <br /> 3. TO ENSURE THAT THE REQUIREMENT OF THE MODIFICATION INSPECTION ARE A MODIFICATION PROJECT IS COMPLETED,AS MARKED BY THE DATE OF AN <br /> MET,IT IS VITAL THAT THE GENERAL CONTRACTOR(GC)AND THE MODIFICATION • THE GC AND MODIFICATION INSPECTION COORDINATE CLOSELY THROUGHOUT ACCEPTED"PASSING MODIFICATION INSPECTION MODIFICATION INSPECTION" <br /> INSPECTOR BEGIN COMMUNICATION AND COORDINATING AS SOON AS A POOR THE ENTIRE PROJECT. REPORT FOR THE ORIGINAL PROJECT. FEE LY(SEO169OA) <br /> PAYMENT IS RECEIVED.IT IS EXPECTED THAT EACH PARTY WILL BE PROACTIVE IN <br /> REACHING OUT TO THE OTHER PARTY. • WHEN POSSIBLE IT IS PREFERRED TO HAVE THE MODIFICATION INSPECTOR AND REQUIRED PHOTOS: <br /> GC ON-SITE SIMULTANEOUSLY FOR ANY GUY WIRE TENSIONING OR 8215 BROADWAY <br /> MODIFICATION INSPECTOR: REXTENSIONING OPERATIONS. 1. BETWEEN THE GC AND THE MI INSPECTOR THE FOLLOWING PHOTOGRAPHS ARE EVERETT,WA 98203 <br /> 1. THE MODIFICATION INSPECTOR IS REQUIRED TO CONTACT THE GC AS SOON AS • IT MAY BE BENEFICIAL TO INSTALL ALL TOWER MODIFICATIONS PRIOR TO TO BE TAKEN AND INCLUDED IN THE MODIFICATION INSPECTION REPORT: <br /> SITE NUMBER: <br /> RECEIVING A PO OR PAYMENT FOR THE MODIFICATION INSPECTION TO: CONDUCTING THE FOUNDATION INSPECTION TO ALLOW FOUNDATION AND • PREXCONSTRUCTION GENERAL SITE CONDITION <br /> MODIFICATION INSPECTION(S)DONE IN ONE SITE VISIT. 824022 <br /> • REVIEW THE REQUIREMENT OF THE MODIFICATION INSPECTION CHECKLIST • PHOTOGRAPHS DURING THE REINFORCEMENT MODIFICATION <br /> • <br /> WHEN POSSIBLE,IT IS PREFERRED TO HAVE THE GC AND MODIFICATION CONSTRUCTION/ERECTION AND INSPECTION POD NUMBER: 21-84153 <br /> • WORK WITH THE GC TO DEVELOP A SCHEDULE TO CONDUCT ON-SITE INSPECTOR ON-SITE DURING THE MODIFICATION INSPECTION.THEREFORE,THE DESIGNED BY: LT <br /> • INSPECTIONS GC MAY CHOOSE TO COORDINATE THE MODIFICATION INSPECTION CAREFULLY ••RAW MATERIALS DRAWN BY: TAJ <br /> TO ENSURE ALL CONSTRUCTION FACILITIES AT THEIR DISPOSAL WHEN THE MI ••PHOTOS OF ALL CRITICAL DETAILS CHECKED BY: JGC <br /> • DISCUSS ANY SITE SPECIFIC INSPECTIONS OR CONCERNS INSPECTOR IS ON SITE. ••WELD PREPARATION DATE: 06/15/2021 <br /> ••FOUNDATION MODIFICATION SHEET TITLE: <br /> 2. THE MODIFICATION INSPECTOR IS RESPONSIBLE FOR COLLECTING ALL GENERAL CANCELLATION OR DELAYS IN SCHEDULED MODIFICATION INSPECTION: ••BOLT INSTALLATION AND TORQUE <br /> CONTRACTOR(GC)INSPECTION AND TEST REPORTS.REVIEWING THE DOCUMENTS •.FINAL INSTALLED CONDITION <br /> FOR ADHERENCE TO THE CONTRACT DOCUMENTS,CONDUCTING THE INXFEILD 1. IF THE GC AND MODIFICATION INSPECTOR AGREETO A DATE ON WHICH THE •.SURFACE COATING REPAIR M 0 D I F I CATI O N <br /> INSPECTIONS,AND SUBMITTING THE MODIFICATION INSPECTION REPORT. MODIFICATION INSPECTION WILL BE CONDUCTED,AND EITHER ARTY CANCELS OR <br /> DELAYS,THE TOWER OWNER SHALL NOT BE RESPONSIBLE FOR ANY COSTS,FEES, • POST CONDITION PHOTOGRAPHS CHECKLIST <br /> GENERAL CONTRACTOR: LOSS OR DEPOSITS AND/OR OTHER PENALTIES RELATE TO THE CANCELLATION OR <br /> DELAY INCURRED BY EITHER PARTY FOR ANY TIME.EXCEPTIONS MAY BE MADE IN • FINAL INFIELD CONDITION ANY OTHER PHOTOS DEEMED RELEVANT TO SHOW <br /> 1. THE GC IS REQUIRED TO CONTACT THE MODIFICATION INSPECTOR AS SOON AS THE DELAY/CANCELLATION IS CAUSED BY WEATHER OR OTHER CONDITIONS THAT COMPLETE DENTALS OF MODIFICATIONS <br /> RECEIVING A POOR PAYMENT FOR THE MODIFICATION INSTALLATION OR MAY COMPROMISE THE SAFETY OF THE PARTIES INVOLVED. <br /> TURNKEY PROJECT TO: 2. PHOTOS OF ELEVATED MODIFICATIONS TAKEN FROM THE GROUND SHALL BE w /�I_O A <br /> 1 CORRECTION OF FAILING MODIFICATION INSPECTION: CONSIDERED INADEQUATE. I\1//I <br /> 1. IF THE MODIFICATION INSTALLATION WOULD FAIL THE MODIFICATION , �•. <br />