My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2619 CEDAR ST 2022-04-04
>
Address Records
>
CEDAR ST
>
2619
>
2619 CEDAR ST 2022-04-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2022 1:49:48 PM
Creation date
4/4/2022 1:49:40 PM
Metadata
Fields
Template:
Address Document
Street Name
CEDAR ST
Street Number
2619
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10/8/2020 City of Everett Page 1 / 2, <br /> 6:56t26rAM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E2007-050 Site Address 2619 CEDAR ST <br /> Applied 7/9/2020 Applicant C M HEATING INC(ELEC) Lot <br /> Approved 7/9/2020 Owner OUR LADY OF PERPETUAL HELP-EVERETT Block <br /> Issued 7/10/2020 Contractor C M HEATING INC(ELEC) Tract <br /> Parent Permit No. M2007-020 Description ELECTRICAL FOR THREE SEPARATE DUCTLESS HEAT PUM <br /> Notes **CHANGE OF SCOPE**ADD PANEL CHANGE** <br /> (7/30/2020 3:23 PM CRB) <br /> Apparently we had a panel change out included with this installation and it was not included on our <br /> invoice,therefore not added to this permit.Is there a way to add that service change out to this existing <br /> permit or do we need to pull another permit? <br /> Please let me know as soon as possible,thanks so much. <br /> Scheduled Completed Tyne Inspector Result Remarks Inspector's Comments <br /> 8/3/2020 8/3/2020 ELEC 06-ROUGH SKB NO ACCESS eTRAKiT Inspection 7/31/2020 9:46 AM C M HEATING INC <br /> IN Request (ELEC) <br /> inspection for panel change out-please call <br /> jessica at church 425-232-1539 <br /> Contact Name:C M HEATING INC <br /> (ELEC) <br /> Site Address:2619 CEDAR ST <br /> Phone:4252590550 <br /> e-Mail:kailana@cmheating.com <br /> 8/5/2020 8/5/2020 ELEC 06-ROUGH SKB NOT READY (8/5/2020 1:28 PM SKB) <br /> IN Update the scope of work.Who installed <br /> the new service.Group all service <br /> disconnects.One grounding electrode <br /> system for the building.Disconnects are <br /> required at each head. <br /> 8/18/2020 8/18/2020 ELEC 09-FINAL SKB NOT READY eTRAKiT Inspection 8/17/2020 9:22 AM C M HEATING INC <br /> Request (ELEC) <br /> PLEASE CALL JESSICA AT CHURCH SO <br /> SHE CAN COORDINATE ACCESS <br /> 435-232-1539 CORRECTIONS <br /> COMPLETED ON 08/15 <br /> Contact Name:C M HEATING INC <br /> (ELEC) <br /> Site Address:2619 CEDAR ST <br /> Phone:4252590550 <br /> e-Mail:kailana@cmheating.com <br /> (8/18/2020 4:07 PM SKB) <br /> Provide proper working space in front of <br /> electrical panel.Provide proper size service <br /> entrance and feeder conductors number four <br /> not large enough for 125 A.Mark the <br /> service with available fault current per <br /> code.Label both services as to the number <br /> of services and locations of each.Locate the <br /> service panel so that the bottom of the <br /> service enclosure is not less than 24 inches <br /> above the floor per code.Upsize the water <br /> pipe bond if it is being used to support both <br /> the 200 and 125 amp services. <br /> INSP12 CRWS'an-MS <br />
The URL can be used to link to this page
Your browser does not support the video tag.