Laserfiche WebLink
t • <br /> Project Summary PROJ-SUM <br /> 2015 WSEC Compliance Forms for Commercial Buildings including R2,R3,&R4 over 3 stories and all R1 Revised Jun 2016 <br /> General Info Project Title: Dr.Kang Roof Sweep Date 4/6/2020 <br /> This PROJ-SUM Project Street Address: 3822 Colby Ave For Buil n - F-t�s�+ <br /> form shall be Project City,County,Zip: Everett,WA 98201 WW <br /> provided as a cover <br /> sheet for all Project Owner or Rep: Dr.Kang Investments LLC JUN 2 it 2020 <br /> compliance form <br /> submittals.Project Jurisdiction: City of Everett <br /> Title matches project CITY OF EV plans title block. ERET <br /> Permit Services <br /> Project Description New Construction and Additions <br /> Select all that apply to the ❑New Building ❑ Building Addition ❑Addition+Existing <br /> scope of project. <br /> Select Addition+Existing Existing Building Retrofit <br /> or Alteration+Existing if <br /> the existing building will be 0 Alteration ❑ Alteration+Existing ❑Change in Space Conditioning <br /> combined with the addition <br /> or alteration to demonstrate <br /> compliance per Section ❑Change of Occupancy ❑ Historic Building <br /> C502.1 or C503.1. <br /> Building Elements Scope-Select all that apply <br /> ❑All ❑ Building Envelope 0 Mechanical Systems <br /> ❑Service Hot Water Systems ❑ Lighting Systems ❑Electrical Systems <br /> 0 All Commercial 0 Group R-R2,R3,&R4 C <br /> over 3 stories and all R1 <br /> Mixed Use-Building is greater than three stories above grade and it has both Commercial and Group <br /> Occupancy Type R occupancies. <br /> Mixed Occupancy-Building is three stories or less above grade and it has both Commerical and <br /> Group R2,R3 or R4 occupancies.Select All Commercial to document compliance for the commercial <br /> areas of the building.The residential spaces shall comply with the WSEC Residential Provisions. <br /> Select all that apply to the scope of project <br /> O Fully Conditioned ❑ Semi-heated2 ❑Refrigerated Warehouse, <br /> Walk-in Cooler/Freezer, <br /> ❑ Low Energy Space Category3 Refrigerated Display Case1 <br /> Space Conditioning <br /> Categories Eligible Low Energy Spaces <br /> ❑Unconditioned ❑ Low energy heating/cooling capacity <br /> ❑Wireless service ❑ Greenhouse4 ❑Equipment building <br /> equipment shelter <br /> Floors Above <br /> Floor Area and Grade Building Gross Conditioned Floor Area Project Gross Conditioned Floor Area <br /> Stories <br /> Prescriptive C Total Building Performance <br /> Prescriptive-Projects complying prescriptively shall demonstrate compliance with all applicable mandatory <br /> and prescriptve requirements of this code. Refer to C401.2,Item 1 for more information.Compliance forms <br /> General Compliance to include with a Prescriptive submittal:All applicable ENV,LTG,MECH and C406. <br /> Path Total Building Performance-Projects complying via total building performance(TBP)shall include a <br /> summary of results from a whole building energy model per Section C407 and shall demonstrate compliance <br /> with all applicable mandatory provisions in this Code.Refer to Section C401.2,Item 2 for more information. <br /> Compliance forms to include with a TPB submital:PROJ-SUM, C406-SUM&C406-DETAIL,ENV-CHK,LTG- <br /> EXT,LTG-CHK,and all MECH forms(except MECH-ECONO). <br />