My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6110 COLBY AVE 2022-04-04
>
Address Records
>
COLBY AVE
>
6110
>
6110 COLBY AVE 2022-04-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2022 3:43:01 PM
Creation date
4/4/2022 3:41:42 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
6110
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ _____ __,i FOR OFFICE USE ONLY ill PERMIT# blsoli .--6t-it <br /> __ <br /> BUILDING PLANNING <br /> Bldg/TI/Addn/Rem Size Zoning Classification �` <br /> Garage Size Overlay/Agreement <br /> VALUATION Nonresidential Use CtikA('C\N <br /> Number of Stories Residential Use <br /> Occupancy Group Proposed No. of Dwelling Units: <br /> 7 <br /> Total No. of Dwelling Load Units: <br /> Basement No-_ Yes_ Fin / Unfin Landscape or Planning Inspection <br /> Type of Construction needed before final? Yes No— <br /> Existing Sprinkler System? Yes No_Unk_ Planning Inspector: <br /> Fire Sprinkler Required Yes No_ Phone#: <br /> Reason Approved by:C Date: 4 _ kV I to\I( <br /> Existing Fire Alarm Yes_ No—Unk_ Historic Approved by: Date: <br /> Fire Alarm Required Yes_ No_ School Mitigation Reqd? Yes No_ <br /> Reason Everett School Dist Mukilteo School Dist---�--'J <br /> RCW 64.55 MF worksheet req'd for permit? Yes_ No_ #of Net New Units: <br /> Add'I RCW 64.55 docs required prior to final?Yes_ No Calculated School Impact Fee: <br /> Architectural Approved By/Date: / �' t,3 School Impact Fee Credit: <br /> Structural Approved By/Date: Total School Impact Fee Owed: <br /> Comments: Comments: <br /> Intake OK by: �� 4/ka/0 Intake OK by: Ok to route _ Hold <br /> Make this a"W'^PermitJ.. Yes No <br /> PUBLIC WORKS <br /> FEES INTAKE: Checked By: Date: <br /> Plan Check Fee Comments: • <br /> �� <br /> Building Permit r�Dk fN (lA <br /> A /�i p`W/" <br /> Surcharge High Hazard Sites(Dental/Medical,Animals,Mortuary,etc-Review for RPBA) <br /> Additional Plan Check ❑ Public Works/Sys Dev/Traffic Mit./RPBA-NOT REQUIRED <br /> Plumbing Fee ❑ Route for Public Works Review(bldg folder, PW Worksheet) <br /> Mechanical Fee 0 Public Works Permit-Concurrent Review(separate green folder) <br /> Ping Bldg Review Fee PW REVIEW: PW Reviewer: Date: <br /> Water Fee ❑ PW Permit Approved-PW <br /> Sewer Fee ❑ See PW Review Worksheet <br /> Systems Dev. Fee 0 PW Permit Not Required <br /> Traffic Mitigation Fee <br /> Public Works Fee FIRE DEPARTMENT <br /> School Mitigation Fee Update/New Sprinklers Yes No_ Existing Bldg. <br /> Update/New Detection Yes No_ Existing Bldg. <br /> Update/New Chemical Yes No_ Existing Bldg. <br /> Update/New Fire Service Yes No Existing Bldg. <br /> Approved by: Date: <br /> Comments: - <br /> 'n^ <br /> -42_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.