Laserfiche WebLink
ir_________Thio <br /> bLso - 02---, <br /> 2019 System Development Fee Calculations <br /> Permit It: B1801-032/PW1801-046 Additional Notes: <br /> Project Address: 1400 W Marine View Dr Note:Stormwater System Development Fee is being added to the public works permit since the quantity of new plus replaced hard surface area was provided for the site as a whole rather than per building breakout.Water and Sewer <br /> Project Name: Waterfront Place Apartments-South Building system development fees will be added to the Utility permit associated with the domestic and irrigation meters being purchased. <br /> Answer the Following Questions(Required):All Yellow Inputs <br /> Water District: Everett <br /> Sewer District: Everett Prepared By: Sabrina Fandler .72"' Date: 1/18/2019 <br /> Outside City Limits? No *Adds a 25%Surcharge <br /> Supportive Housing Credit? No *Reduces by 80% Reviewed By: Date: <br /> Fee Calculations: <br /> Water&Sewer System Development Fees: <br /> Domestic Meter: Fee Calculation(Before Credit): Credit Calculations(Up to 3 meters for Meter-Based Calculation or 3 previous building uses for Administrative Guidelines-Based Calculation): <br /> *subject to Administrative Guidelines Proposed Building Use: Muiltifamily unit Previous Bldg Use#1: Vacant/Undeveloped Previous Bldg Use#2: Vacant/Undeveloped Previous Bldg Use#3: Vacant/Undeveloped <br /> - <br /> ProposedUnit Measure: 131 unit Unit Measure for Use#1: - Sq.Ft. Unit Measure for Use#2: Sq.Ft. Unit Measure for Use#3: - Sq.Ft. <br /> Note:Administrative Guidelines Proposed Meter Size: 4" Credited Meter#1 Size: None Credited Meter#2 Size: None Credited Meter#3 Size: None <br /> Used for Calculation Water Fee: $233,265.15 Water Credit#1: $0.00 Water Credit#2: $0.00 Water Credit#3: $0.00 <br /> 1 Sewer Fee: $301,882.95 Sewer Credit#1: $C. Sewer Credit#2: $0.00 Sewer Credit#3: $0.00 <br /> I.J a Tot. "is D e:Add to Utility Permit for Domestic Meter <br /> Permit#: ,v<<+ipt'- 03 �4 ate Sys Dev Fee Total: $233,265.15 This fee reflects credit for existing water meter <br /> A .,31 Se er Sys Dev Fee Total: $301,882.95 This fee reflects credit for existing water meter <br /> Total: $535,148.10 <br /> Irrigation Meter: Fee Calculation(Before Credit): Credit Calculations: <br /> Proposed Meter Size: 1" Credited Meter Size: None <br /> Water Fee: $6,608.00 Water Credit: SO 00 <br /> j No Sewer Fee: $0.00 No Sewer Credit: $O-oo <br /> gal Fees Due:Add to Utility Permit for Irrigation Meter <br /> + Water Sys Dev Fee Total: $6,608.00 This fee reflects credit for existing water meter <br /> Per t#:U1811-013 _it_4, 7' <br /> No Sewer Sys Dev Fee: $0.00 Irrigation meters are only subject to the water portion of system development fees <br /> atia_y Total: $6,608.00 <br /> Fire Meter: /� . �y/ Proposed Meter Size:6" For informational purposes only <br /> Permit#:U1811-014 YJ(JI'V No Sys Dev Fees: $0.00 Fire meters are not subject to system development fees <br /> Stormwater System D9�/elopment Fees: <br /> Permit#:PW1801-046 ✓ VtleS6,, Type of Construction: New Construction/Redevelopment <br /> Square Feet of New Plus Replaced Hard Surfaces: 206,355 SF <br /> Stormwater System Dev Fee: $51,320.74 Add this fee to the Building Permit(or Public Works Permit if there is no building permit for the project) <br />