Laserfiche WebLink
t 1 <br /> Element 3.Control flow rates: <br /> ❑ BMP C203:Water Bars <br /> ❑ BMP C240:Sediment Trap <br /> ❑ BMP C24I:Temporary Sediment Pond <br /> ❑ Other Per the SWMMWW: <br /> II Not applicable to my proposed project <br /> Explain: <br /> Element 4. Install sediment controls: <br /> ❑ BMP C23 I:Brush Barrier <br /> ❑ BMP C232:Gravel Filter Berm <br /> ❑� BMP C233:Silt Fence <br /> ❑ BMP C234:Vegetated Strip <br /> ❑ BMP C235:Wattles <br /> ❑ BMP C240:Sediment Trap <br /> ❑ BMP C24I:Temporary Sediment Pond <br /> ❑ Other Per the SWMMWW: <br /> ❑ Not applicable to my proposed project <br /> Explain: <br /> Element 5. Stabilize soils: <br /> ❑ BMP C 120:Temporary and Permanent Seeding <br /> ❑ BMP C 121:Mulching <br /> ❑ BMP C 122: Nets and Blankets <br /> • BMP C 123: Plastic Covering <br /> ❑ BMP C 124:Sodding <br /> ❑ BMP C 125:Topsoiling/Composting <br /> ❑ BMP C 126:Polyacrylamide for Soil Erosion Protection <br /> ❑ BMP C 130:Surface Roughening <br /> ❑ BMP C 13 I:Gradient Terraces <br /> ❑ Other Per theSWMMWW: <br /> ❑ Not applicable to my proposed project <br /> Explain: <br /> City of Everett Public Works <br /> Small Project Storm water Site Plan Report for Projects in �17' <br /> the Combined Sewer Area-April 2021 671) <br />