Laserfiche WebLink
3/8/2022 r City of Everett Page 1 I <br /> 8:47':26AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E1907-192 Site Address 2605 VIEWCREST AVE <br /> Applied 7/29/2019 Applicant Lot <br /> Approved 7/29/2019 Owner HAUSMANN KARL&THERESA Block <br /> Issued 7/29/2019 Contractor OWNER Tract <br /> Parent Permit No. B1912-030 Description INSTALL 2 NEW CIRCUITS,3 NEW SWITCHES,19 CANS <br /> Notes (12/7/2020 7:18 AM TAH) <br /> ADDED TO SCOPE:5 MORE CIRCUITS AND 9 MORE CAN LIGHTS <br /> Scheduled Completed Tune Inspector Result Remarks Inspector's Comments <br /> 1/28/2020 1/28/2020 PERMIT WRL APPROVAL OWNER EXPANDED SCOPE WITH <br /> EXTENSION NEW PERMIT B1912-030 <br /> PER PHONE CALL WITH:KARL <br /> HAUSMANN <br /> 425-345-3155 <br /> 7/23/2020 7/23/2020 PERMIT PTEC APPROVAL COVID SEE (7/23/2020 3:03 PM CRB) <br /> EXTENSION ATTACHED Thank you Ms.Bergsma, <br /> The other permit I would like to have <br /> extended is an electrical permit: <br /> E1907-192. I typed it wrong in my first <br /> attempt. May I also have the electrical <br /> permit extended? Thank you. <br /> Karl Hausmann <br /> 12/29/2020 12/29/2020 ELEC 06-ROUGH SKB CORRECTION eTRAKiT Inspection 12/28/2020 10:00 AM Karl Hausmann <br /> IN Request <br /> Contact Name:Karl Hausmann <br /> Site Address:2605 VIEWCREST AVE <br /> Phone:4253453155 <br /> e-Mail:karlh@millcreeklaw.com <br /> (12/29/2020 3:32 PM SKB) <br /> Provide physical protection where NM <br /> cable is ran below the joists in the <br /> basement.NM cable cannot be run in a wet <br /> location.inside of a conduit ran outside is <br /> considered a wet location. <br /> 1/19/2021 1/19/2021 PERMIT TAH APPROVAL COVID (1/19/2021 1:25 PM TAH) <br /> EXTENSION EXTENSION From:Karl Hausmann <br /> <karlh@mill creeklaw.com> <br /> Sent:Tuesday,January 19,2021 1:08 PM <br /> To:E Trakit(PW) <br /> <ETrakit@everettwa.gov> <br /> Subject:RE:B1904-041 RE:City of <br /> Everett eTRAKiT Contact Form <br /> Ms.Bergsma, <br /> I am afraid I need to ask for one more <br /> extension of my building and electrical <br /> permits(B-1904-041 and E1907-192). <br /> Materials were delayed significantly and my <br /> contractor had shoulder surgery,which <br /> caused large delays. But we are getting <br /> back on track and we should be done in 4-6 <br /> months. Please let me know if I need to pay <br /> an extension fee. Thank you. <br /> Karl Hausmann <br /> 425-345-3155 <br /> INSP12 CRIllfsYSTEMS <br />