My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10632 ROSEWOOD AVE 2022-04-06
>
Address Records
>
ROSEWOOD AVE
>
10632
>
10632 ROSEWOOD AVE 2022-04-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2022 8:15:16 AM
Creation date
4/6/2022 7:50:54 AM
Metadata
Fields
Template:
Address Document
Street Name
ROSEWOOD AVE
Street Number
10632
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> 10: Control DeWatering <br /> DeWatering is not expected for this project. <br /> 11: Maintain BMPs <br /> The construction supervisor will be responsible for maintaining all BMPs during construction <br /> and working with the City to relocate or add BMPs as necessary as site conditions change. <br /> BMPs should be inspected and maintained as needed after every rain event producing more <br /> than '/" of rain in a 24-hour period. Also, BMPs shall be inspected on a weekly basis even <br /> if site work is not occurring. <br /> 12:. Manage the Project <br /> It will be the responsibility of the Contractor and Developer to manage this project and <br /> coordinate with the City Inspector and Engineer. <br /> Inspection and Monitoring: <br /> Site inspections shall be done by a person who is knowledgeable in the principles and <br /> practices of erosion and sediment control. The person must have skills to first assess the <br /> site conditions and construction activities that could impact the quality of stormwater, and <br /> second assess the effectiveness of erosion and sediment control measures used to control <br /> the quality of stormwater discharges. Whenever inspection and/or monitoring reveals that <br /> the BMPs identified in the Construction SWPPP are inadequate, due to the actual discharge <br /> of or potential to discharge a significant amount of any,.pollutant, appropriate BMPs or design <br /> changes shall be implemented as soon as possible. <br /> Maintaining an Updated Construction SWPPP: <br /> The construction SWPPP shall be retained on-site or within reasonable access to the site. <br /> The SWPPP shall be modified whenever there is a change in the design, construction, <br /> operation, or maintenance at the construction site that has, or could have, a significant effect <br /> on the discharge of pollutants to waters of the state. <br /> The SWPPP shall be modified if, during inspections or investigations conducted by the <br /> owner/operator, or the applicable local or state regulatory authority, it is determined that the <br /> SWPPP is ineffective in eliminating or significantly minimizing pollutants in stormwater <br /> discharges from the site. The SWPPP shall be modified as necessary to include additional <br /> or modified BMPs designed to correct problems identified. Revisions to the SWPPP shall <br /> be completed within seven days following inspection. <br /> 13: Protect On-Site Stormwater Management BMPs for Runoff from Hard Surfaces <br /> The use'of'on-site'management BMP's for this project will allow for the installation of the <br /> splash blocks at the end of the project. That will protect those areas from disturbance or <br /> compaction. In addition, the organic content of the amended soils will be tested and verified <br /> prior to final project acceptance. <br /> Lucas MFH 20-0715 <br /> March 2021 Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.