My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2610 VIEWCREST AVE 2022-04-13
>
Address Records
>
VIEWCREST AVE
>
2610
>
2610 VIEWCREST AVE 2022-04-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2022 10:13:52 AM
Creation date
4/6/2022 9:08:08 AM
Metadata
Fields
Template:
Address Document
Street Name
VIEWCREST AVE
Street Number
2610
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. PROJECT OVERVIEW <br /> This document is intended to provide the engineering information necessary to support the <br /> building permit application for a new SFR and paved driveway in the City of Everett. The <br /> site covers 0.29 acres. The existing site is currently undeveloped with pasture ground cover. <br /> The proposed disturbance area will cover the,entire site (0.29 acres). The proposed SFR <br /> will be set approximately 5 feet from the western property line and 47 feet from the northern <br /> property line. Access to the new SFR will be from the proposed paved driveway which will <br /> take access from the existing roadway to the north (Viewcrest Ave) <br /> The parcel is currently undeveloped and is surrounded by developed parcels. The slope of <br /> the site in the area of the proposed duplex and driveway is moderate and averages <br /> approximately 8 percent down to the north toward Viewcrest Ave. <br /> This development proposes to construct a new SFR and driveway taking access from <br /> Viewcrest Ave. The total new plus replaced impervious surfaces equals 7,943 sf (0.18 <br /> acres). The total effective hard surfaces for this project totals 2,207 sf, as all roof runoff and <br /> a portion of the driveway runoff will be infiltrated. <br /> Roof runoff from.the SFR roof will be infiltrated via an infiltration trench. Runoff from the <br /> concrete pad in front of the garage will be tightlined into the conveyance system within <br /> Viewcrest Ave, and runoff from the length of driveway along the eastern property line will be <br /> infiltrated by utilizing permeable pavement. All drainage improvements have been designed <br /> to meet or exceed the 2014 DOE Stormwater Management Manual. <br /> The project location is 26XX Viewcrest Ave, in the City of Everett, and in Section 2, <br /> Township 28N, Range 4E. See Figure 1 -Vicinity Map. <br /> McCann SFR 19-0913 <br /> September 2019 <br /> Revised:January 2020 Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.