Laserfiche WebLink
PUBLIGIVORKS PERMIT •Date Applied: 10/23/2019 <br /> City of Everett Permit Services Public Works Permit#: PW1910-054 <br /> E V E R E T T 3200 Cedar Street, 2nd Floor Associated Bldg Permit#: <br /> Everett, WA 98201 Planning Reference#: <br /> WASHINGTON 425-257-8810 Public Works Feet Via 2(90 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> MCCANN JOSEPH F&SALLI L JOSEPH MCCANN <br /> 7716 73RD PL NE <br /> MARYSVILLE,WA,98270 , , <br /> PHONE: PHONE:2067792000 <br /> TAX PARCEL ID#:00734800000400 SITE ADDRESS:2610 VIEWCREST AVE <br /> DESCRIPTION: NEW SFR <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans,SWPPP,and drainage report approved by the City of Everett Public Works Department dated 02/04/2020.Approved plans must <br /> remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally request all required inspections.Flyers <br /> are provided at permit issuance with instructions on how to request an inspection online. <br /> 6.City of Everett Water Department crews shall make all connections to City water main at owner/contractor's expense.This work to be under a separate Utility Permit <br /> to be purchased at the Permit Services Counter per a cost estimate by the Water Department.Work shall be scheduled 3-4 weeks in advance. <br /> 7.As-builts of storm,sanitary sewer,and water systems will be required to be submitted to the PW Inspector per City Design and Construction Standards and <br /> Specifications for Development prior to final approval/close out of the permit. <br /> 8.On-site water main will be staked within an easement to the City. The easement documentation will be submitted to the City prior to issuance of permits and must be <br /> recorded by the project team with a copy of the recorded document submitted to the City prior to final approval/close out of the permit. <br /> 9. A 1-year Warranty Bond in the amount of 10%of the construction costs for all public improvements shall be submitted to the City prior to final approval/close out of <br /> the permit. <br /> 10.A 2-year Warranty Bond in the amount of 10%of the construction costs for all Stormwater Infrastructure shall be submitted to the City prior to final approval/close <br /> out of the permit. <br /> 11.A Landscape Inspection is required by the Planning Department prior to final by the Public Works Inspector.Schedule the existing Planning Landscape inspection <br /> under"My Active Inspections"in your dashboard on the Online Permitting Portal: <br /> 12.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy.Request a final inspection online by selecting PW 24-Site Final within <br /> the Online Permitting Portal Inspection Requests when all items have been completed for this permit. <br /> Public Works Permit Fee Breakdown: <br /> Paving(2,207SF) $45.00 88111 <br /> Erosion Control $50.00 <br /> Grade/Fill/Excavate(320CY) $110.00 <br /> 5 <br /> PW Plan Review $152.33 MAR 0 <br /> PW Site Inspection $304.65 20z( <br /> Stormwater System Development Fee7,943 S.F.) $2,032.86 CI PY OFEVERETT <br /> mitServrces <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless <br /> the City of Everett from any and all claims for damages,costs,expenses,or <br /> J causes_of action that may arise because of in allation and maintenance of <br /> `pad for Constr►_ 'an blic Wor 5) D te<. e Impro ement or other right-of-way use ere to applied for and further <br /> agrees to r ove_same upon notice fr the City and to replace public <br /> property da ged the7by. <br /> FINAL INSPECTION Date � 0c Z vO <br /> Approved as Constructed(PW Inspector) Signature of pplicant Date / <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILI NTLY PURSUED TO COMPLETION.THIS PERMIT MAY BE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 0 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br />