|
-Herat Notes
<br /> a
<br /> GENERAL NOTE INDEX
<br /> ARCHITECTURAL SHT, i CONTENTS
<br /> 1. CONTRACTOR SHALL VERIFY ALL DIMERSIONS IN FIELD AND SHALL COORDINATE 31. ALL INERTFETAL DETAILS ARE GENERAL IN NATURE SHOWING ONLY THE.APPEARANCE
<br /> INSTALLATION OF ALL MATERIALS AND/OR EQUIPMENT WHOSE DIMENSIONS ARE. AND GOIJPIGIARAnal DESIRED. SHEET METAL WKIP.K SHALL BE AOO GENERAL INFORMATION 4 GENERAL NOTES
<br /> FIXED. :. - FABRICATED IN STRICT ACCORDANCE KM THE SHEET METAL AND AIR
<br /> 2. DRAWINGS 5N1ALL.NOT se SCALED. CONDITIONING CONTRACTORS NATIONAL ASSOCIATION(SMACNA)"ARCHITECTURAL SLEET CIVIL ENGINEERING
<br /> METAL MANUAL°,LATEST EDITION. ALL REQUIRED ACCESSORIES C.01 SITE PLAN
<br /> 3. CONTRACTOR SHALL COORDINATE THE WORK OF ALL TRADES REQUIRED TO (I.E.,EXPNISION JOINTS,FASTENERS,ETC.)SHALL BE FURAIISHED IN ACCORDANCE
<br /> PERFORM THE WORK. WHERE INSTALLATION AND/OR CONNECTION OP EQUIPMENT WITH SMACNA AND/OR A5-REQUIRED BY STANDARD CONSTRUCTION PRACTICE.
<br /> IS NOT SPECIFIED AND WHERE SUCH CONNECTION AND/OR INSTALLATION.IS 5. GOTAGOIR SHALL TAKE ALL NECESSARY 1PRFS,AUTION5 TO ENSURE THE SAFETY OF
<br /> REQUIRED FOR A COMPLETE AND OPERABLE FACILITY,THE CONTRACTOR SHALL 2 NRTARCHITECTURAL:DRAWINGS
<br /> BE HELD RESPONSIBLE FOR SUCH INSTALLATION AND/OR CONNECTION. THE OCCUPANTS AND WORKERS AT ALL TIMES.
<br /> A01 EXISTING FLOOR PLAN
<br /> 4. CONTRACTOR TO VERIFY ALL ELEVATIONS PRIOR TO STARTING WORK. 33. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING PROTECTION FOR
<br /> A02 NEW 1ST FLOOR PLAN.
<br /> 5. MECHANICAL CONTRACTOR TO VERIFY SIZE,LOCATION AND MATERIAL RETIRED PEDESTRIANS DURING CONSTRUCTION AND DEMOLITION..
<br /> FOR SA7•IITARY SEWER,STORM AND WATER LINES.
<br /> AD3 NEW 2ND FLOOR PLAN
<br /> 6. ALL DISCREPANCIES FOUND AMONG DRAWNGS5 GT''CGIPICATIONS AND NOTES 54. IF REQUt ,A CONSTRUCTION BARRICADE SHALL BE INSTALLED BY THE A04 EXISTING ELEVATIONS
<br /> SHALL BE REPORTED TO-THE ARCHITECT FOR CLARIFICATION. IN CASE OF CONTRACTOR,PAINTED,DETAILED AND ILLUMINATED AS REGU RED. NO SIGNS OTHER A05 NEW ELEVATIONS
<br /> CONFLICT,CONTRACTOR SHALL SASE HIS BID PRICE ON MOST EXPENSIVE.SYSTEM THAN THOSE AUTHORI,CtI BY THE ARCHITECT WILL BY FERMI I LELU ON THIS AOO NEW ELEVATIONS/STAIR DETAILS
<br /> UNTIL CLARIFIED IN WHITING. ' BARRICADE. : A01 DETAILS
<br /> T. CONTRACTOR RESPONSIBLE FOR THE DESIGN AND ERECTION OF ALL BRACING 35. .TDB SITE SAFETY:THE ARCHIT'SGT/ENGINEER HAS NOT BEEN RETAINED OR
<br /> AND SHORING DURING CONSTRUCTION. COMPENSATED TO PROVIDE DESIGN AND/OR CONSTRICTION REVIEW SERVICES SZR.UGTUf2A4.DRAWINGS.
<br /> B. PRIOR TO 5UBMITT[h1G THE BID,THE CONTRACTOR SHALL VISIT THE SITE Of'THE RELATED TO THE CONTRACTORS SAFETY PRECAUTIONS OR TO MEANS,METHODS,
<br /> WORK AND BEGONE.FAMILIAR W HE ALL RACONDITIONS ORILL VISIT T SITE
<br /> of T TL GHMQEES,SEQUENCES,OR PROCEDURES FOR THE CONTRACTOR TO PERFORM FES SOT NOTES AND DETAILS
<br /> WORK. THE UNDERTAKING OF PERIODIC SITE VISITS BY THE ARCHITEGT/ENSINEEIR
<br /> OUT HIS WORK. IT HILL BE PRESUMED THAT HE HAS PROVIDED IN HIS PROPOSALSO2 NOTES AND DETAILS
<br /> FOR ANY MISCELLANEOUS ITEMS THAT MAY NOT BECOVERED IN THE PLANS AND HIM ..NOT RESPONSIBLE BL FORlPR AS SUPERVISION I LA E FOR HE IUOTTON NOR MAKE
<br /> SPECIFICATION S,BUT ARE NECESSARY TO PROVIDE A COMPLETE AND WOi2KARLE HIM BYTHE PROVIDING S A SAFE PLACE FOR E THE PERFORMANCEHEIREMPLOYEES,
<br /> O SO4 EXISTINGEMO FOUNDATIONATIONPLAN PLAN
<br /> PROJECT. WORK BY CONTRACTOR,SUB CONTRACTORS;SUPPLIERS OR THEIR ENttPLdYi3 5, SO4 NEt^i FOUNDATION
<br /> 4. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS SHOWN ON THE OR FOR.ACCESS,VISITS,USE WORK TRAVEL OR OCCUPANCY BY ANY PERSON. S05 NEW 1ST PLR FRAMING PLAN.
<br /> DRAWINGS PRIOR TO PROCEEDING*WITH.ANY WORK OR FABRICATION AND SHALL ELEGTGAL SOb NEW 1ST FLR WALL FRAMING PLAN
<br /> oE 111 RESPONSIBLE FOR E JOINING OF HIS WORK TO THE WORK OF OTHER TRADES. 1. ELECTRICAL WORK SHALL BE ON A BID/DESIGN BASIS AND SHALL BE INSTALLED 50-1 NEW 2ND FLR FRAMING PLAN
<br /> DISCREPANCIES ON DRAWINGS OR IN SF'ECIFICATTONS,IF ANY,SHOULD BE COMPLETE,IN OPERATING CONDITION. ELECTRICAL WORK SHALL COMPLY WITH S05 NEW 2ND FLOOR FRAMING PLAN
<br /> BROUGHT TO THE ATTENTION OF THE ARCHITECT IMMEDIATELY UPON THE NATIONAL ELECTRICAL CODE,LOCAL R ErTRICAL CODES AND ORDINANCES. SO'I NEW ROOF FRAMING PLAN
<br /> DISGOVEIRY. CONTRACTOR SHALL.DESIGN CIRCUITRY WHICH IS PROPERLY BALANCED. SbO SECTIONS 142
<br /> 10. THE GENERAL CONTRACTORSHALL BE RESPONSIBLE FOR THE COORDINATION OF 2. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS RELATING TO THE WORK
<br /> ALL.WORK. - IN THIS CONTRACT,AND COORDINATE-THIS INSTALLATION WITH THE PONES
<br /> COMPANY.
<br /> 11. GENERAL CONTRACTOR SHALL PROVIDE CUTOUTS AND REQUIRED BLOCKING FOR _f
<br /> FIXTURES AS REQUIRED BY NEGHANICAL OR ELECTRICAL CONTRACTOR, 3, CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORKMANSHIP FOR A -
<br /> PERIOD OF ONE YEAR FROM DATE OF WE FINAL CERTIFICATE OF PAYMENT. n„ iie,txMss"e pace
<br /> 12. GENERAL CONTRACTOR TO PROVIDE CURES FOR MECHANICAL AND ELECTRICAL -
<br /> BOUM-ENT,VERIFY LOCATION AND SIZE OF OPENINGS REQUIRED BY OTHER 4. ALL EXTERIOR LIGHTING SHALL BE CONTROLLED BY PHOTO CELLSTRADES,FURNISH SAME COMPLETE WITH BUCKS AND REQUIRED LINTELS,AND
<br /> VERIFY LOCATION AND SIZE OF ACCESS DOORS,DUCT AND PIPE FURRING;CURBS, '. .
<br /> ANCHORS,AND INSERTSWITH THE APPROPRIATE SUBCONTRACTORS AND/OR 5, PROVIDE ENERGY GAI COS AXON AS REQUIRED BY BUILDING OFFICIALS.
<br /> CONTRACTORS: 6. . PROVIDE POPES AND CONNECTION TO MECHANICAL EQIPMENT,
<br /> 13. REPETITIVE FEATURES NOT NOTED ON THE DRAWINGS SHALL BE COMPLETELY 1. PROVIDE ELECTRICAL WORK IN R.O.W.INCLUDING STREET LIGHTING
<br /> PROVIDED AS IF DRAI4I IN RILL.. -
<br /> 14. IF CERTAIN FEATURES ARE NOT FULLY SHOWN OR CALLED FOR ON THE MECHANICAL
<br /> DRAWINGS OR IN THE SPECIFICATIONS,THEIR CONSTRUCTION SHALL BE OF THE t. F .CHANICALWOORK SHALL BE ON A BID/DESIGN BASIS AND SHALL BE INSTALLED
<br /> SAID CHARACTER.AS FOR SIMILAR CONDITIONS THAT ARE SHOWN OR GALLED COMPLETE IN OPERATING CONDITION.
<br /> 75. THE CONTRACTOR SHALL DO ALL CUTTING,FITTING,OR PATGHINI6 OF HIS WORK 2, THE CONITRACTOR.SHALL OBTAIN AND PAY FOR ALL PERMITS:AND INSPECTIONS
<br /> ION
<br /> THAT MAY BE REQUIRED TO MAKE ITS SEVERAL PARTS FIT TOGETHER PROPERLY REQUIRED DURING A CONSTRUCTION TURS ISB LOCAL EVIDENCE CE
<br /> HAT ONL WOW
<br /> OF THE WORK SHALL FURNISH NCE 111TH TORT EVIDENCE PROVIDEANYINSTALLEDCODES. ENERGY 'Z
<br /> ALTERING THE TOTAL MORK OR ANY PART OF IT. ALL PATCHING,REPAIRING CALCULATIONS AS REQUIRED BY BUILDING OFFICES. r-3
<br /> AND REPLACING OF MATERIALS AND SURFACES,CUT OR DAMAGED IN EXECUTION - - 0
<br /> ` OF WORK,SHALL BE DONE PITH APPLICABLE MATERIALS SO THAT SURFACES 3, THE CONTRACTOR SHALL CORRELATE THE DUCT LOCATIONS AND RELATED
<br /> REPLACED WILL.,UPON COMPLETION,MATCH SURROUNDING SIMILAR SURFACES. EQUIPMENT WITH ALL STRUCTURAL FEATURES OF THE YORK,ELECTRIC tt-�,,,,
<br /> 16, ALL WORK REQUIRED SHALL BE FURNISHED,INSTALLED COMPLETE AND IN FIXTURES AND CONDUITS,PIPING SYSTEMS AND CABINETS AND OTHER FIXTURES r�i m
<br /> OF'RA,T1N5 CONDITION. HAVING FIXED LOCATIONSS TO AVOID CONFLICTS /��� 4.F F
<br /> 1T, ALA.MATERIAL STORED ON;THE SITE SHALL BE PROTECTED FROM WEATHER.TO 4. ALL WORK WILL CONFORM WITH STANDARDS OF THE SHEET METAL AIR CONDI w L-a :5
<br /> MATERIALS MAY DAMAGE AND A)ST FOR RA.DETERIORATION
<br /> UNTIL USE,
<br /> TO PROTECT APPLL RACTTORS NATIONAL ASSOCIATION,INC.,(SMACNA)AND W1114 ALL: fCoDES. .< (Z Lam"+F
<br /> O 0 N vl
<br /> 16. NO PORTION OF THE WORK RETIRING A SHOP DRAWING OR SAMPLE SUBMISSION 5. DUCT 1FQ4K SHALL.BE CONSTRUCTED OF GALVANIZED STEEL IN ACCORDANCE - Z W c'.psi
<br /> SHALL BE COMMENCED UNTIL THE SIA3MISSION HAS BEEN APPROVED BY THE PITH TABLE 1:AND PLATE 45 THROUGH 15A OF THE LOW VELOCITY DUCT MANUAL: (/) >
<br /> CONTRACTING OFFICE. ALL SUCH PORTIONS OF THE WORK SHALL IBE IN
<br /> ACCORDANCE WITH APPROVED SHOP DRAWINGS AND SAMPLE$, 6, DUCT LINER SHALL BE FLEXIBLE FIBERGLASS,SIMILAR TO MANVILLE
<br /> LINAGOUSTIG.HP,I-INCH THICK. INSTALL IN ACCORDANCE WITH SMACNA 1415 O "'
<br /> 14. PLANS.WHICH APPEAR AS BACKGROUND ON CEILING,PLUMBING,HVAG,AND EDITION DUCT LINER APPLICATION STANDARD MANUAL. =
<br /> F1 PtTRICAL DRAWINGS ARE FOR THE PURPOSE.ONLY OF ILLUSTRATING GENERAL
<br /> PLAN CONFIGURATIONS. SIGH BACKGROUNDS SHALL NOT BE USED FOR PORTIONS T. WTE.RE FLEXIBLE 17UC.TS ARE USED PROVIDE]DUCTS CONSISTING OF FACTORY
<br /> OF THE WORT OTHER THAN THAT PERTAINING TO THE TITLE OF EACH:A ICLT, ASSEMBLED MERE sYRING STEEL.HELIX BLOTS S II ATED IN A CON IMk�5
<br /> SEVER.TO THE APPROPRIATE SHEET FOR EACH PORTION OF THE WORK. DOUBLE LAYER OF DURABLE POLYESTER FILM FORMING AND AIRTIGHT INNER
<br /> CORE,I-INCH-THICK LAYER OF GLASS FIBRE INSTALLATION,SUPPORT GROMMETS
<br /> 20. ALL DIMENSIONS FOR INTERIOR PARTITIONS ARE TO FACE OF STUDS UNLESS SPACED.16-INCHES O.G.,AND SHEATHED WITH A REINFORCED METALIZED:MYL"AR
<br /> NOTED OTHERWISE. VAPOR BARRIER JACKET. ASSEMBLY SHALL PERT CLASS 1 REQUIRENEHTS OF IL..
<br /> 21. A71.WORK AND MATERIAL SHALL MEET THE STANDARDS AND.'C<'CGIF[CATlONS OF STANDARD 181. INSTALL THE FULLY EXTENDED CONDITION AND AVOID SAGS AND
<br /> THE LOCAL ND AIJTH ALIT'IME. BENDS,EXCEPT WHERE NECESSARY TO AVOID OBSTRUCTIONS AND TO MAKE
<br /> CONNECTIONS. CLECON FLEX 25,RP SERIES,OR APPROVED.
<br /> 22. CONTRACTOR SHALL OBTAIN ALL PERMITS OTHER.THAN THE BUILDING PERMIT. PLUMBING
<br /> 23. BUILDING CODE APPLICAIR F - 1. CONTRACTOR TO OBTAIN'ALL PERMITS.
<br /> 2015IBG (INTERNATEONAL BUILDING CODE) - 2. CONTRACTOR TO OBTAIN ALL REQUIRED GOVERNMENTAL INSPECTIONS
<br /> UPC: (UNIFORM PLUMBING CODE)LATEST EDITION
<br /> INC-(UNIFORM MECHANICAL CODE)LATEST EDITION INCLUDING FINAL APPROVAL.
<br /> NEC LATEST EDITION 3. PROVIDE PLUMBING FIXTURES AND CONSECT TO SEWER SYSTEM IN COMPLETE
<br /> 20151458E WASHINGTON STATE BUILDING CODE AND OPERATING CONDITION.
<br /> 2015WSEG WASHINGTON STATE ENERGY CODE DESIGN
<br /> 24. SITE PLAN BASED UPON TOPOGRAPHIC SURVEY BY HPLMAN 6 ASSOCIATES DEC,2002. 4. HATER PIPING ABOVE GROUND IN BUILDING SHALLGSALL TYPE"S"COPPER TUBING
<br /> 24.
<br /> COUNTY RECORD AFt11786401.- - HARD TEMPER,FORPITH WROUGHT COPPER FITTIN65, OF PRESSURE RATINGS
<br /> SUITABLE FOR APPLI AR1 P FORKING PRESSURE. TING
<br /> 25. `'-.AIL REPORT BY EARTH-NO NECESSARY FOR:PROJECT. 5. PROVIDE SHOCK ARRESTORS WERE REQUIRED TO PREVENT WATER HAI+ER �r"41111 gpNlllln�'
<br /> P v_alfs'U�
<br /> 6. BELOW GRADE SANITARY SOIL,WASTE AND DRAINAGE PIPINGG.SHALL SE ABS R
<br /> 26. ALL WATER LINES,SANITARY LEPERS,STORM SEVERS,DRIVEWAYS AND WHEELCHAIR (SCHEDULE 40)FIFE ANC,FITTINGS..PIPE AND FITTINGS SHALL BE FIRST QUALITY, y'
<br /> RAMPS-SHALL.MEET THE STANDARDS AND SPECIFICATIONS OF LOCAL GOVERNING SMOOTH INSIDE AND CUT,OF STANDARD DIMENSIONS,AND FREE FROM CRACKS.PIPE a,.
<br /> AUTHORITIES. - - OUT OF GROUND SHALL BE SAME AS BELOW GRADE.FALL SHALL BE 1/4°PER FOOT.". ire
<br /> "UL"LY w,,NBYIi
<br /> 2'T, PROVIDE SLEEVES-FOR DUCT AND PIPE OPENINGS IN CONCRETE WALLS..GROUT 1. VENTS SHALL BE STANDARD WEIGHT ABS PIPE AND DRAINAGE SYSTEMS. .. a "
<br /> HOLES SMOOTH AND PAINT TO MATCH ADJACENT SURFACE... 8. DOMESTIC NOT AND COLD WATER PIPING SHALL BE INSULATED IN ACCORDANCE
<br /> 28. ALL DUCT OPENINGS IN STUD WALLS SHALL BE FRAMED NCH DRYWALL STUDB,SO
<br /> VITH LOCALGODES. -
<br /> THAT THE OPENING SHALL ALLOW NOT MORE THAN 1/2-INCH CLEARANCE:. AUTOMATIC FIRE-EXTINGUISHING SYSTEM sr
<br /> BETWEEN FRAME ANto DUCT. G\VOLEKILL
<br /> I. AUTOMATIC FIRE-EXTINSUI5HMG SYSTEM WORK SHALL SE ON A BID/DESIGN BASIS @,r
<br /> 24. ALL GYPSUM WALLBOARD IN TOILET/SI-10MR ROOMS SHALL BE WATER RESISTANT. AND SHALL BE.INSTAU I COMPLETE IN OPERATION CONTROL.: 19 APRIL 2018
<br /> ON.R.SF55. : 2. THE SYSTEM SHALL BE"WET°MOD/OR"DRY"1TYt AS DICTATED BY ACTUAL - 0""dW
<br /> 50, ALL WOOD SHIMS,ROII514 BUCKS,N HAILERS AND BLOCKING IN ENCLOSED SPACES, CONDITIONS OF INSTALLATION.
<br /> 0...
<br /> BELOW GRAPE,OR OTFIERW85E SUBJECT TO"DRY ROT"SHALL BEPRESSURE
<br /> . TREATED WITH WOOD PRESERVATIVE.- 3. THE SYSTEM SHALL HAVE"QUICK RESPONSE"SPRINKLER HEADS,INSTALLED PER
<br /> UBC STANDARD 38-1.
<br /> - - _ - - 201 "8-06
<br /> 2018-06 AO
<br /> �.'.�`
<br /> I/4" 1'0'
<br />
|