Laserfiche WebLink
� � • l . . t r ,i ,n . � � <br />At tfie completion of each job, this sheet records the total costs of the job. Once i[ is completely <br />(il;ed out placc it into the job folder. <br />Job tt 1832 Job Lead Tomnty Date <br />Total lob Sold S5,000.00 Total Labor Costs $1,800.00 <br />Total Material Costs $430.00 <br />Itemimd I ist of Material Purchases <br />Vendors <br />Warden Cotisl. <br />Total Job Costs $5,000.00 <br />Amaunt Note <br />$ 1,100.0� Excavation <br />$ 250.00 BWV <br />$ 180.00 Pipe/parts <br />11/21/2014 <br />Line Preperation <br />Overhead <br />Lead Generation <br />Commision <br />Consumables <br />Provide all lobor and matc:nals to perforin thc following ta;l<s <br />1) Preparc/clear lateral side sewer pipe with Hydrojetter <br />2) Fxcavate up to 1D' deep to expose the latcral side se�ver pipe. <br />3) Install shoring or Aluminum trench box as required to ensure safcry <br />4) Install lhe city of [verelt approved back watervalve per the city's requirements. <br />5) Replumb laterial side sewer pipr as required. <br />6) Inspection, backfill and site clean up. <br />Total Hours 30 <br />$ 300.00 <br />$ 400.00 <br />$ - <br />$ - <br />$ 500.00 <br />$ �10.00 <br />Prepared by SewerTechs.com 12/1/2014 Page 1 <br />