My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 3/30/2022
>
Contracts
>
Capital Contract
>
American Process Group 3/30/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2022 10:38:27 AM
Creation date
4/15/2022 10:25:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
3/30/2022
Council Approval Date
2/16/2022
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2022 Biosolids Removal and Disposal
Public Works WO Number
UT3752-30
Tracking Number
0003285
Total Compensation
$1,462,035.31
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
American Process Group LLC 6/30/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> City of Everett 00 7200 - 9 <br /> ' 2022 Biosolids Removal and Disposal UT 3752-30 <br /> 2.5. CONTRACTOR'S COPIES OF CONTRACT DOCUMENTS <br /> The Contractor shall keep at the construction site at least one set of Contract Documents and one set of <br /> full-size Drawings that shall be available to the Owner's Representative and Owner. <br /> 3. OWNER <br /> 3.1. GENERAL <br /> The Owner, and the Owner's Representative,shall have the authority to act as the sole judge of the Work, <br /> Equipment and materials with respect to both quantity and quality as set forth in the Contract. It is <br /> expressly stipulated that the Drawings, Specifications and other Contract Documents set forth the <br /> ' requirements as to the nature of the completed Work and do not purport to control the method of <br /> performing Work except in those instances where the nature of the completed Work is dependent on the <br /> method of performance. <br /> The Owner has the authority to act, do,perform, and make any all decisions and actions authorized by the <br /> Contract Documents, including,but not limited to, Change Orders,progress payments, Contract <br /> decisions, acceptability of the Contractor's Work, and early possession. The Owner has the authority to <br /> accept or reject requests for progress payments that have been submitted by the Contractor and <br /> recommended by the Owner's Representative. The Owner has the authority to make determinations of <br /> the acceptability of the Work. The Owner also has the authority to accept or reject the Owner's <br /> Representative's recommendations regarding retention of defective Work. <br /> 3.2. OWNER'S REPRESENTATIVE <br /> ' The Owner's Representative shall be satisfied that all the Work is being done in accordance with the <br /> requirements of the Contract. The Contract and Specifications give the Owner's Representative authority <br /> over the administration of the Contract. Whenever it is so provided in this Contract,the decision of the <br /> ' Owner's Representative shall be final. <br /> The Owner's Representative's decisions will be final on all questions including but not limited to,unless <br /> specifically assigned to an Architect or Engineer,the following: <br /> 1. Measurement of Work,whether lump sum,Force Account, or unit price; <br /> 2. Acceptability of rates of progress on the Work; <br /> ' 3. Interpretation of Drawings and Specifications with regard to administrative matters; <br /> 4. Determination as to the existence of changed or differing site conditions; <br /> ' 5. Fulfillment of the Contract by the Contractor; <br /> 6. Payments under the Contract including adjustment and; <br /> 7. Suspension(s) of Work. <br /> If the Contractor fails to respond promptly to the requirements of the Contract or orders from the Owner's <br /> Representative: <br /> 1. The Owner's Representative may use the Owner's resources, other contractors,or other means to <br /> accomplish the Work, and <br /> 2. The Owner will not be obligated to pay the Contractor, and will deduct from the Contractor's <br /> ' payments, any costs that result when any other means are used to carry out the Contract <br /> requirements or Owner's Representative's orders. <br /> At the Contractor's risk,the Owner's Representative may suspend all or part of the Work if: <br /> 1. The Contractor fails to fulfill Contract terms,to carry out the Owner's Representative's orders,or <br /> to correct unsafe conditions of any nature; or <br /> 00 7200 - 9 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.