My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 3/30/2022
>
Contracts
>
Capital Contract
>
American Process Group 3/30/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2022 10:38:27 AM
Creation date
4/15/2022 10:25:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
3/30/2022
Council Approval Date
2/16/2022
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2022 Biosolids Removal and Disposal
Public Works WO Number
UT3752-30
Tracking Number
0003285
Total Compensation
$1,462,035.31
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
American Process Group LLC 6/30/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200 - 12 <br /> 2022 Biosolids Removal and Disposal UT 3752-30 <br /> of its Subcontractors to include substantially the same language of this section in each of their <br /> subcontracts, adjusting only as necessary the terms used for the contracting parties. The requirements of <br /> this section apply to all Subcontractors regardless of tier. <br /> At the time of subcontract execution,the Contractor must verify that each of its first tier subcontracts <br /> meets the following bidder responsibility criteria: <br /> 1. At the time of subcontract Bid Submittal,have a certificate of registration in compliance with <br /> Chapter 18.27 RCW; <br /> 2. Have a current state unified business identifier number; ' <br /> 3. If applicable,have: <br /> a. Industrial insurance coverage for the Subcontractor's employees working in Washington as <br /> required in Title 51 RCW; <br /> b. An employment security department number as required in Title 50 RCW; <br /> c. A state excise tax registration number as required in Title 82 RCW; , <br /> d. An electrical contractor license, if required by Chapter 19.28 RCW; <br /> e. An elevator contractor license, if required by Chapter 70.87 RCW. <br /> 4. Not be disqualified from bidding on any public works contract under RCW 39.06.010 or <br /> 39.12.065(3). <br /> 5. If bidding on a public works project subject to the apprenticeship utilization requirements in <br /> RCW 39.04.320,not have been found out of compliance by the Washington state apprenticeship <br /> and training council for working apprentices out of ratio,without appropriate supervision, or <br /> outside their approved work processes as outlined in their standards of apprenticeship under <br /> chapter 49.04 RCW for the one-year period immediately preceding the date of the bid <br /> solicitation; <br /> 6. Within the three-yearperiod immediatelyprecedingthedateof the y bid solicitation, not have been <br /> determined by a final and binding citation and notice of assessment issued by the department of <br /> labor and industries or through a civil judgment entered by a court of limited or general <br /> jurisdiction to have willfully violated, as defined in RCW 49.48.082, any provision of chapter <br /> 49.46, 49.48, or 49.52 RCW; and <br /> 7. Have received training on the requirements related to public works and prevailing wage under in <br /> accordance with the requirements of RCW 39.04.350(f), or demonstrate exemption from such <br /> requirements. <br /> The Contract Documents shall apply to Subcontractors and Suppliers as if each had signed the Contract <br /> with the Owner. Contractor shall include the provisions of these Contract Documents or a"flow down" <br /> clause in each contract with Subcontractors and Suppliers. <br /> 4.4. RESPONSIBILITIES <br /> 4.4.1. Subcontractors,Manufacturers and Suppliers <br /> The Contractor shall be responsible for the adequacy,efficiency and sufficiency of Subcontractors, <br /> manufacturers, Suppliers and their employees. <br /> 4.4.2. Contractor's Employees I <br /> The Contractor shall be responsible for the adequacy,efficiency and sufficiency of its employees. <br /> Workers shall have sufficient knowledge, skill and experience to perform properly the Work assigned to <br /> them. I <br /> 00 7200 - 12 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.