My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 3/30/2022
>
Contracts
>
Capital Contract
>
American Process Group 3/30/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2022 10:38:27 AM
Creation date
4/15/2022 10:25:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
3/30/2022
Council Approval Date
2/16/2022
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2022 Biosolids Removal and Disposal
Public Works WO Number
UT3752-30
Tracking Number
0003285
Total Compensation
$1,462,035.31
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
American Process Group LLC 6/30/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200 - 28 1 <br /> 2022 Biosolids Removal and Disposal UT 3752-30 <br /> obligated to consider or review a request for substitution and may,in their sole discretion and option, <br /> consider or review such requests. <br /> If the offered substitution requires changes to or coordination with other portions of the work,the <br /> Contractor shall include with its substitution request any such drawings and details showing such <br /> changes. The Contractor agrees to perform these changes as part of the substitution of material or <br /> Equipment at no additional cost to the Owner. Approval of a substitution request shall not relieve the <br /> Contractor from responsibility for the efficiency, quality, and performance of the substitute material or <br /> Equipment, in the same manner and degree as the material and Equipment originally specified. Any cost <br /> differential associated with a substitution shall be reflected in the offer. If the Owner approves the <br /> substitution,the Contract Documents shall be modified by a Change Order modifying the Contract Sum <br /> in the amount of the cost differential. <br /> 8.6. DEMONSTRATION OF COMPLIANCE WITH CONTRACT REQUIREMENTS ' <br /> 8.6.1. Inspection <br /> The burden of proving the constructed Work complies with the Contract Documents shall be on the I <br /> Contractor at all times. To demonstrate its compliance with the Contract requirements,the Contractor <br /> shall assist the Owner's Representative in his or her inspection and observation of the Work. The <br /> Contractor shall grant the Owner's Representative access to the Work and Work Site, and to places where <br /> Work is being prepared, or where materials, Equipment, or machinery are being obtained for Work. The <br /> Contractor shall provide information requested by the Owner's Representative in connection with <br /> inspection work. I <br /> If the Contract Documents, laws, ordinances, or any public regulatory authority requires parts of the Work <br /> to be specially inspected,tested, or approved,the Contractor shall give the Owner's Representative <br /> adequate prior written Notice of the availability of the subject Work for examination,which Notice shall <br /> be not less than two (2)working days. <br /> Inspection and quality control tests performed on Work by the Contractor by the Owner's Representative <br /> shall not relieve the Contractor of its responsibility for errors or lack of quality therein and shall not be <br /> regarded as an assumption of risks or liability by the Owner's Representative for the Contractor's <br /> compliance with these Contract Documents. Contractor remains responsible and liable for all errors, <br /> defects or a lack of quality not discovered by inspection or observation. , <br /> If parts of the Work are covered prior to inspection or observation,the cost of exposing the Work for <br /> inspection and closing and re-covering shall be borne by the Contractor regardless of whether the Work is <br /> found to be in compliance with the Contract. <br /> 8.6.2. Samples of Materials <br /> The Contractor shall provide Samples or specimens of materials to be incorporated in the Work that <br /> require laboratory examination or special testing, as requested by the Owner's Representative. Such <br /> Samples or specimens shall be provided in ample time to permit making proper test analysis and <br /> examinations before the Contractor plans to incorporate the material into the Work. An independent <br /> testing laboratory will conduct tests of material in accordance with the Specifications. In the absence of a <br /> specific test requirement,the Owner's Representative will determine the appropriate standard test to be <br /> used. <br /> 8.6.3. Certification <br /> In cases where compliance of materials or Equipment to Contract requirements is not readily <br /> determinable through inspection and tests, the Contractor shall provide properly authenticated documents, I <br /> certificates, or other proof satisfactory to the Owner's Representative that the materials and Equipment <br /> comply with the Contract requirements. These documents, certifications, and proofs shall include <br /> performance characteristics, construction materials, and physical or chemical characteristics of materials. <br /> The Contractor shall pay all associated costs of such certification. <br /> 00 7200 - 28 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.