t - 1 <br /> City of Everett 00 72003 <br /> 2022 Biosolids Removal and Disposal UT 3752-30 <br /> 3. if the defective Work has been rejected by Owner,remove it from the Project and replace it with <br /> Work that is not defective, and <br /> 4. satisfactorily correct or repair or remove and replace any damage to other Work,to the work of <br /> others or other land or areas resulting there from. <br /> If Contractor does not promptly comply with the terms of Owner's written instructions, or in an <br /> emergency where Delay would cause serious risk of loss or damage, Owner may have the defective Work <br /> corrected or repaired or may have the rejected Work removed and replaced. All claims, costs,losses, and <br /> 1 damages (including but not limited to all fees and charges of engineers,architects, attorneys,and other <br /> professionals and all court or arbitration or other dispute resolution costs)arising out of or relating to such <br /> correction or repair or such removal and replacement(including but not limited to all costs of repair or <br /> replacement of Work of others)will be paid by Contractor. <br /> The Owner is hereby authorized to make such repairs if,ten(10)days after giving of such notice to the <br /> Contractor,the Contractor has failed to make or undertake the repairs with due diligence. In case of an <br /> emergency where, in the opinion of the Owner,Delay could cause serious loss or damage, repairs may be <br /> made prior to or concurrent with notice being sent to the Contractor. All expenses in connection with <br /> such repairs will be charged to the Contractor. <br /> In special circumstances where a particular item of equipment is placed in continuous service before <br /> Substantial Completion of all the Work,the correction period for that item may start to run from an earlier <br /> date if so provided in the Specifications. <br /> Where defective Work(and damage to other Work resulting there from)has been corrected or removed <br /> and replaced under this Paragraph 8.10,the correction period hereunder with respect to such Work will be <br /> extended for an additional period of one year after such correction or removal and replacement has been <br /> satisfactorily completed. <br /> Contractor's obligations under this Paragraph 8.10 are in addition to any other obligation, guarantee or <br /> warranty. The provisions of this Paragraph 8.10 shall not be construed as a substitute for or a waiver of <br /> the provisions of any applicable statute of limitation or repose. <br /> 9. MEASUREMENT AND PAYMENT <br /> 9.1. PAYMENTS TO CONTRACTOR <br /> 9.1.1. Schedule of Values <br /> The Contractor shall submit a Schedule of Values at least fifteen(15) days prior to submitting its first <br /> Application for Payment. If the Project contains Unit Price Work, in whole or in part,then the Schedule <br /> of Values for that portion of the Work shall also be based on unit prices. If the Bid form calls for a lump <br /> sum price, in whole or in part,then the Schedule of Values shall: reasonably allocate the Contract Sum <br /> among the various portions of the Work;be complete;be organized to include detailed breakdown of each <br /> major unit of the Work;be organized to correspond to Contractor's schedule;break down the Contract <br /> Sum showing the value assigned to each part of the Work; include an allowance for profit and Overhead; <br /> include Unit Price Work,if and to the extent indicated on the Bid form;be so organized as to facilitate <br /> assessment of work and payment of Subcontractors; and be balanced. To the greatest extent possible,the <br /> breakdown shall use the same tasks or units as the Contractor's schedule. Contractor shall provide <br /> documentation substantiating the cost allocation if asked by the Owner's Representative. Upon <br /> acceptance of the Schedule of Values by the Owner's Representative,it shall be used as a basis for all <br /> requests for payment. <br /> 9.1.2. Progress Payments <br /> 9.1.2.1 Payment Request Procedures: <br /> By the tenth day of each month, or by schedule mutually agreed upon in writing by the Contractor and <br /> Owner's Representative,the Contractor shall submit to the Owner's Representative a partial payment <br /> 00 7200 - 31 GENERAL CONDITIONS <br />