Cityof Everett - , <br /> 00 7200 40 <br /> 2022 Biosolids Removal and Disposal UT 3752-30 <br /> Any costs experienced during mobilization activities for labor, equipment,materials or services shall be <br /> listed in that section of the Force Account summary and paid accordingly. <br /> 9.6.6. For Contractor Markup on Subcontractor's Work. <br /> When Work is performed on a Force Account basis by one or more approved Subcontractors,by lower- <br /> tier Subcontractors or Suppliers, or through invoice by firm(s) acting in the manner of a Subcontractor, ' <br /> the Contractor will be allowed an additional markup,from the table below, applied to the costs computed <br /> for Work done by each Subcontractor through 9.6.1, 9.6.2, 9.6.3,and 9.6.4,to compensate for all <br /> administrative costs,including project Overhead, general company Overhead,profit,bonding, insurance, <br /> Business& Occupation tax, and any other costs incurred. <br /> A firm may be considered to be acting as a Subcontractor when the Owner's Representative observes one <br /> or more of the following characteristics: 1 <br /> 1. The person in charge of the firm's activities takes an active role in managing the overall project, <br /> including extensive coordination, interpretation of Drawings,interaction with the Owner or <br /> management of a complex and interrelated operation. <br /> 2. Rented equipment is provided fueled, operated and maintained by the firm. Operators of rented <br /> equipment are supervised directly by the firm's representative. There is a little interaction <br /> between the Contractor and the employees of the firm. <br /> 3. The firm appears to be holding the risk of performance and quality of the Work. <br /> 4. The firm appears to be responsible for liability arising from the Work. <br /> Markups on Work Performed by Subcontractor(s): <br /> On amounts paid for Work performed <br /> by each Subcontractor on each <br /> Force Account and calculated Up to $25,0000 12% <br /> through 9.6.1-4 <br /> On amounts greater than $25,000 up to $100,000 10% <br /> On amounts greater than $100,000 7% <br /> The amounts and markup rates shall be calculated separately for each Subcontractor on each Force <br /> Account item established. <br /> The payments provided above shall be full payment for all Work done on a Force Account basis. The <br /> calculated payment shall cover all expenses of every nature,kind and description, including those listed <br /> above and any others incurred on the Work being paid through Force Account. Nothing in this provision <br /> shall preclude the Contractor from seeking an extension of time or time-related damages to unchanged <br /> Work arising as a result of Force Account Work. The amount and costs of any work to be paid by Force <br /> Account shall be computed by the Owner's Representative and the result shall be final as provided in 3.2 <br /> OWNER'S REPRESENTATIVE. <br /> An item that has been bid at a unit price or lump sum in the Bid will not be paid as Force Account unless 1 <br /> a change, as defined in ARTICLE 6. CHANGES,has occurred and the provisions require a payment <br /> adjustment. Items which are included in the Bid as Force Account or which are added by change order as <br /> Force Account may, by agreement of the parties at any time, be converted to agreed unit prices or lump <br /> sums applicable to the remaining Work. <br /> 9.7. RETAINAGE <br /> Pursuant to RCW Chap. 60.28, a sum of five percent(5%)of the monies earned by the Contractor will be <br /> retained from progress estimates. In addition to protecting the interests of those identified in RCW Chap. <br /> 60.28, such retainage shall be used as a trust fund for the protection of the Owner. I <br /> At the option of the Contractor; monies retained under the provisions of RCW 60.28 shall be: <br /> 00 7200 - 40 GENERAL CONDITIONS <br />