My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 3/30/2022
>
Contracts
>
Capital Contract
>
American Process Group 3/30/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2022 10:38:27 AM
Creation date
4/15/2022 10:25:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
3/30/2022
Council Approval Date
2/16/2022
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2022 Biosolids Removal and Disposal
Public Works WO Number
UT3752-30
Tracking Number
0003285
Total Compensation
$1,462,035.31
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
American Process Group LLC 6/30/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> City of Everett 01 1100 - 8 <br /> 2022 Biosolids Removal and Disposal UT 3752-30 ' <br /> 1.14 CITY OF EVERETT BUSSINESS LICENSE <br /> A. Contractor must obtain a City of Everett business license prior to performing any ' <br /> Work pursuant to this Contract. <br /> I <br /> 1.15 PERMITS <br /> A. The Contractor shall be responsible to obtain and pay the cost of any applicable <br /> permits and connection fees required to do the Work, and such costs shall be <br /> included in the Bid. <br /> 1.16 CODES AND STANDARD SPECIFICATIONS <br /> A. All construction shall be in accordance with the International Building Code, <br /> Current Adopted Edition. <br /> B. All construction shall be in accordance with the Uniform Mechanical Code, and <br /> the Uniform Plumbing Code, latest editions. <br /> 1 <br /> C. All construction shall be in conformance with the WSDOT/APWA Standard <br /> Specifications and Standard Plans, latest edition. <br /> D. All construction shall be in conformance with the City of Everett Design and <br /> Construction Standards and Specifications, latest edition. <br /> E. All work shall comply with applicable requirements of Snohomish County. ' <br /> F. Any material specified by reference to the number, symbol, or title of a specified ' <br /> standards, such as Commercial Standard Federal Specifications, a trade <br /> association standard, or other similar standard, shall comply with the <br /> requirements of the latest revision thereof, and any amendment or supplement I <br /> thereto in effect on the date of Invitation for Bids, except as limited to type, class <br /> or grade, or modified in such references. All work shall conform to the standard <br /> referred to, except as modified in these specifications and the drawings. ' <br /> I <br /> i <br /> 01 1100 - 8 SUMMARY OF WORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.