My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 3/30/2022
>
Contracts
>
Capital Contract
>
American Process Group 3/30/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2022 10:38:27 AM
Creation date
4/15/2022 10:25:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
3/30/2022
Council Approval Date
2/16/2022
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2022 Biosolids Removal and Disposal
Public Works WO Number
UT3752-30
Tracking Number
0003285
Total Compensation
$1,462,035.31
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
American Process Group LLC 6/30/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> City of Everett 01 2213 - 1 <br /> 111 <br /> 2022 Biosolids Removal and Disposal UT 3752-30 <br /> I <br /> SECTION 01 2213 — MEASUREMENT AND PAYMENT <br /> 111 <br /> 1.1 SUMMARY <br /> A. Unit price bid items measured in tons must be weighed and tested for solids <br /> I <br /> content and submitted to the Project Manager prior to or concurrent with any <br /> application for payment. Solids Content will be taken by the City to verify <br /> numbers. The allowable minimum solids content of any material loaded into a <br /> I <br /> truck for weighing and transportation shall be 28% Total Solids (TS) on the <br /> Biosolids Pad. <br /> I1.2 REFERENCES <br /> 1 A. Section 00 7200 — GENERAL CONDITIONS 1.1 DEFINITIONS OF WORDS <br /> AND TERMS: <br /> 1. DRY WEIGHT <br /> 1 2. DRY TON <br /> 3. TOTAL SOLIDS <br /> IB. Section 01 4523 — MATERIAL SAMPLING <br /> 1.3 BID ITEMS <br /> IA. Item #1- MOBILIZATION AND DEMOBILIZATION (Lump Sum) <br /> I <br /> 1. The lump sum price Mobilization and Demobilization shall encompass full <br /> compensation for the Work consisting of the preparatory work and <br /> operations in mobilizing for beginning the Work in the Contract, including, <br /> I <br /> but not limited to, movement of those personnel, equipment, supplies, and <br /> incidentals to the project sites, preparation of submittals and for the <br /> establishment of temporary offices, phone service, equipment, first aid <br /> I supplies, field surveys, sanitation needs, and all other facilities for both <br /> sites as required by these specifications and State and local laws and <br /> regulations. The costs of bonds, permits, any required insurance, and any <br /> Iother preconstruction expense necessary for the start of the Work shall <br /> also be included. This Work also consists of the general project <br /> management of the Work including, but not limited to, field supervision <br /> Iand office management, as well as other incidental cost for management <br /> I <br /> 01 2213 - 1 <br /> UNIT PRICE MEASUREMENT <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.