My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 3/30/2022
>
Contracts
>
Capital Contract
>
American Process Group 3/30/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2022 10:38:27 AM
Creation date
4/15/2022 10:25:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
3/30/2022
Council Approval Date
2/16/2022
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2022 Biosolids Removal and Disposal
Public Works WO Number
UT3752-30
Tracking Number
0003285
Total Compensation
$1,462,035.31
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
American Process Group LLC 6/30/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> City of Everett 01 2213 - 4 <br /> 2022 Biosolids Removal and Disposal UT 3752-30 , <br /> f. Owner reserves the right to reject applications for payment if: <br /> 1) Submittal of scale tickets and sample data are not submitted in <br /> a timely manner. <br /> 2) Total Solids of any mass of biosolids fails to meet the minimum <br /> specifications. , <br /> D. Item #4 — DRY TONS BIOSOLIDS TRANSPORTED AND DISPOSED OF AT <br /> AN APPROVED SITE (Unit Price) , <br /> 1. For the purposes of this Contract, the Contractor shall be paid the unit <br /> price bid for Dry Tons per the amount (by weight) of solids material that is <br /> 111 <br /> weighted and transported from the designated location on the City's <br /> Biosolids Pad to an approved disposal site. <br /> 2. For this contract, the measurement of a Dry Ton includes the weight of I <br /> only solid material contained in each ton of material that crosses the City <br /> owned scale — the weight of the water will not be included. ' <br /> 3. Contractor shall weight each truck prior to and after picking up solids on <br /> the Pad, using the certified scale provided by Owner. I <br /> 4. The calculation of a Dry Ton for payment shall be as per the following <br /> equation and examples: <br /> (Tons of material loaded into a truck) x(Percent TS) <br /> 100 = Dry Tons <br /> Example 1 (Material at 28% TS): <br /> (2 tons of material loaded into a truck) x (28%) 1 <br /> 100 = 0.56 tons of Dry Ton <br /> material for payment. <br /> Example 2 (Material at 31% TS): , <br /> (10 tons of material loaded into a truck) x (31%) <br /> 100 = 3.1 tons of Dry Ton <br /> material for payment. <br /> 5. Payment I <br /> a. All labor, equipment, tools, materials, disposal costs and fees, and <br /> necessary appurtenances required to transport dewatered biosolids <br /> from the Biosolids Pad to a site approved to take biosolids. <br /> 01 2213 - 4 UNIT PRICE MEASUREMENT <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.