Laserfiche WebLink
I <br /> City of Everett 01 2973 - 3 <br /> I <br /> 2022 Biosolids Removal and Disposal UT 3752-30 <br /> 2. Costs associated with ongoing mobilization activities can be listed <br /> I separately or distributed evenly among allocated cost for each work <br /> activity. <br /> 3. Assign overhead costs corresponding to start and finish dates for each <br /> I work related activity. <br /> 4. Pro-rate associated work expenses related to work activities, including <br /> supervision, temporary utilities, and small tools, over total Contract Time. <br /> I 5. Assign directly related costs, including bonds, insurance, and schedules, <br /> to appropriate work activities. <br /> 6. Claims for additional cost for storage of materials off-site are not accepted <br /> I as a basis for monetary claims, except where need for off-site storage <br /> arose after the Bid and at request of the City. <br /> I C. Overhead and Administrative Costs: Show the distribution of major cost items <br /> which are not a direct cost of actual work-in-place as a line item in schedule of <br /> values or provide a description of the distribution of these items as general <br /> Ioverhead expense. <br /> I1.6 LINE ITEM CATEGORIES <br /> A. Arrange Schedule of Values in tabular form with separate columns. Break out <br /> Ifollowing for each work activity listing. <br /> 1. Section Number from Project Specifications Table of Contents. <br /> I 2. Description of Work. <br /> 3. Name of subcontractor. <br /> 4. Scheduled Value for each Item of Work. <br /> 5. Pervious Work Complete, including Cost Value and Percent Complete. <br /> I6. Present Work Complete, including Cost Value and Percent Complete. <br /> 7. Change Orders (numbers) that affect value. <br /> I 8. Total Billing, including Billing to Date, Percent of Contract Sum, and <br /> Balance to Finish. Show dollar value as percentage of Contract Sum to <br /> nearest one-hundredth percent, adjusted to total 100 percent. <br /> I 9. Retainage. <br /> 10. Stored Material. <br /> 1.7 COST CATEGORIES <br /> I A. Assign following, making sum equal to total cost for each line item activity to <br /> show initial costs of work activity and total installed cost. <br /> Labor. <br /> Ii. <br /> 2. Equipment. <br /> 3. Material. <br /> 111 4. Subcontractor. <br /> 01 2973 - 3 SCHEDULE OF VALUES <br />