My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 3/30/2022
>
Contracts
>
Capital Contract
>
American Process Group 3/30/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2022 10:38:27 AM
Creation date
4/15/2022 10:25:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
3/30/2022
Council Approval Date
2/16/2022
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2022 Biosolids Removal and Disposal
Public Works WO Number
UT3752-30
Tracking Number
0003285
Total Compensation
$1,462,035.31
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
American Process Group LLC 6/30/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 01 3216 - 2 <br /> 2022 Biosolids Removal and Disposal UT 3752-30 <br /> B. Schedule shall be submitted electronically. Acceptable format .xls, .mpp and pdf. <br /> C. Review by the City or City's Representative shall not constitute approval or <br /> acceptance of the Contractor's construction means, methods, sequencing, logic, <br /> order, precedence and succession of activities or Contractor's ability to complete <br /> the Work in a timely manner. I <br /> D. The review/approval of any schedule shall not transfer any of the Contractor's <br /> responsibilities to the City. I <br /> E. Subcontractors shall review all schedules prior to submittal. At the City's option <br /> and sole discretion, City may require Contractor to obtain written acceptance of <br /> each schedule by subcontractors as practical and feasible, as the schedule <br /> relates to subcontractors' work. <br /> 1.4 UPDATES <br /> A. The Project Construction Schedule will be reviewed and updated at each <br /> progress meeting. All changes to the project schedule of more than three (3) <br /> working days shall be documented. The Schedule shall be updated to show <br /> measures required to bring project back on schedule. The Contractor alone shall <br /> remain responsible for adjusting forces, equipment, and work schedules to <br /> ensure completion of the work within the Contract Time. Any mistakes or errors <br /> in any schedule, including, but not limited to, mistakes or errors of logic, order, <br /> precedence, and duration, are and remain the Contractor's. <br /> B. Should any activity not be completed by the stated scheduled date, the City will ' <br /> have the right to require the Contractor to expedite completion of the activity by <br /> whatever means appropriate and necessary, without additional compensation to <br /> the Contractor. <br /> C. The Schedule shall be used to justify time extension days requested by the <br /> Contractor. For additional days requested, the Schedule shall be detailed <br /> enough to identify the work item(s) affected and the relationship to the changed <br /> or added work. I <br /> D. Schedule shall be provided during the construction meetings. Schedule shall be <br /> on 11x17 papers and shall show current work progress. <br /> END OF SECTION 01 3216 <br /> 1 <br /> t <br /> 01 3216 - 2 CONSTRUCTION PROGRESS SCHEDULE <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.