My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 3/30/2022
>
Contracts
>
Capital Contract
>
American Process Group 3/30/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2022 10:38:27 AM
Creation date
4/15/2022 10:25:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
3/30/2022
Council Approval Date
2/16/2022
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2022 Biosolids Removal and Disposal
Public Works WO Number
UT3752-30
Tracking Number
0003285
Total Compensation
$1,462,035.31
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
American Process Group LLC 6/30/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Benefit Code Key—Effective 9/1/2021 thru 3/2/2022 <br /> Note Codes <br /> 8. D. Workers working with supplied air on hazmat projects receive an additional$1.00 per hour. <br /> L. Workers on hazmat projects receive additional hourly premiums as follows -Level A: $0.75, Level B: $0.50, And <br /> Level C: $0.25. <br /> M. Workers on hazmat projects receive additional hourly premiums as follows: Levels A& B: $1.00, Levels C &D: <br /> $0.50. <br /> N. Workers on hazmat projects receive additional hourly premiums as follows-Level A:$1.00,Level B:$0.75,Level <br /> C:$0.50,And Level D:$0.25. <br /> S. Effective August 31,2012—A Traffic Control Supervisor shall be present on the project whenever flagging or spotting <br /> or other traffic control labor is being utilized.Flaggers and Spotters shall be posted where shown on approved Traffic <br /> Control Plans or where directed by the Engineer.All flaggers and spotters shall possess a current flagging card issued <br /> by the State of Washington, Oregon,Montana, or Idaho. This classification is only effective on or after August 31, <br /> 2012. <br /> T. Effective August 31,2012—A Traffic Control Laborer performs the setup,maintenance and removal of all temporary <br /> traffic control devices and construction signs necessary to control vehicular, bicycle, and pedestrian traffic during <br /> construction operations. Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or <br /> where directed by the Engineer.All flaggers and spotters shall possess a current flagging card issued by the State of <br /> Washington,Oregon,Montana,or Idaho.This classification is only effective on or after August 31,2012. <br /> U. Workers on hazmat projects receive additional hourly premiums as follows—Class A Suit:$2.00,Class B Suit:$1.50, <br /> And Class C Suit: $1.00.Workers performing underground work receive an additional$0.40 per hour for any and all <br /> work performed underground, including operating, servicing and repairing of equipment. The premium for <br /> underground work shall be paid for the entire shift worked.Workers who work suspended by a rope or cable receive <br /> an additional$0.50 per hour.The premium for work suspended shall be paid for the entire shift worked.Workers who <br /> do"pioneer"work(break open a cut,build road,etc.)more than one hundred fifty(150) feet above grade elevation <br /> receive an additional$0.50 per hour. <br /> V. In addition to the hourly wage and fringe benefits, the following depth and enclosure premiums shall be paid. The <br /> premiums are to be calculated for the maximum depth and distance into an enclosure that a diver reaches in a day. <br /> The premiums are to be paid one time for the day and are not used in calculating overtime pay. <br /> Depth premiums apply to depths of fifty feet or more.Over 50'to 100'-$2.00 per foot for each foot over 50 feet.Over <br /> 101'to 150'-$3.00 per foot for each foot over 101 feet.Over 151'to 220'-$4.00 per foot for each foot over 220 feet. <br /> Over 221'-$5.00 per foot for each foot over 221 feet. <br /> Enclosure premiums apply when divers enter enclosures(such as pipes or tunnels)where there is no vertical ascent <br /> and is measured by the distance travelled from the entrance. 25'to 300'-$1.00 per foot from entrance. 300'to 600' <br /> -$1.50 per foot beginning at 300'.Over 600'-$2.00 per foot beginning at 600'. <br /> W. Meter Installers work on single phase 120/240V self-contained residential meters.The Lineman/Groundmen rates <br /> would apply to meters not fitting this description. <br /> 1 <br /> 12 of 14 I <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.