My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 3/30/2022
>
Contracts
>
Capital Contract
>
American Process Group 3/30/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2022 10:38:27 AM
Creation date
4/15/2022 10:25:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
3/30/2022
Council Approval Date
2/16/2022
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2022 Biosolids Removal and Disposal
Public Works WO Number
UT3752-30
Tracking Number
0003285
Total Compensation
$1,462,035.31
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
American Process Group LLC 6/30/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Benefit Code Key—Effective 9/1/2021 thru 3/2/2022 <br /> Note Codes Continued <br /> 9. B. The highest pressure registered on the gauge for an accumulated time of more than fifteen(15)minutes during the <br /> shift shall be used in determining the scale paid. <br /> Tide Work:When employees are called out between the hours of 6:00 p.m.and 6:00 a.m.to work on tide work(work <br /> located in the tide plane) all time worked shall be at one and one-half times the hourly rate of pay. Swinging <br /> Stage/Boatswains Chair:Employees working on a swinging stage or boatswains chair or under conditions that require <br /> them to be tied off to allow their hands to be free shall receive seventy-five cents ($0.75) per hour above the <br /> classification rate. <br /> C. Tide Work:When employees are called out between the hours of 6:00 p.m.and 6:00 a.m.to work on tide work(work <br /> located in the tide plane) all time worked shall be at one and one-half times the hourly rate of pay. Swinging <br /> Stage/Boatswains Chair:Employees working on a swinging stage or boatswains chair or under conditions that require <br /> them to be tied off to allow their hands to be free shall receive seventy-five cents ($0.75) per hour above the <br /> classification rate. <br /> Effective August 31,2012—A Traffic Control Supervisor shall be present on the project whenever flagging or spotting <br /> or other traffic control labor is being utilized.A Traffic Control Laborer performs the setup,maintenance and removal <br /> of all temporary traffic control devices and construction signs necessary to control vehicular,bicycle,and pedestrian <br /> traffic during construction operations.Flaggers and Spotters shall be posted where shown on approved Traffic Control <br /> Plans or where directed by the Engineer. All flaggers and spotters shall possess a current flagging card issued by the <br /> State of Washington,Oregon,Montana,or Idaho.These classifications are only effective on or after August 31,2012. <br /> D. Industrial Painter wages are required for painting within industrial facilities such as treatment plants,pipelines, <br /> towers,dams,bridges,power generation facilities and manufacturing facilities such as chemical plants,etc.,or <br /> anywhere abrasive blasting is necessary to prepare surfaces,or hazardous materials encapsulation is required. <br /> E. Heavy Construction includes construction,repair,alteration or additions to the production,fabrication or <br /> manufacturing portions of industrial or manufacturing plants,hydroelectric or nuclear power plants and atomic <br /> reactor construction.Workers on hazmat projects receive additional hourly premiums as follows-Level A:$1.00, <br /> Level B:$0.75,Level C:$0.50,And Level D:$0.25. <br /> F. Industrial Painter wages are required for painting within industrial facilities such as treatment plants,pipelines, <br /> towers,dams,power generation facilities and manufacturing facilities such as chemical plants,etc.,or anywhere <br /> abrasive blasting is necessary to prepare surfaces,or hazardous materials encapsulation is required. <br /> 1 <br /> i <br /> 1 <br /> 14 of 14 , <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.