My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 3/30/2022
>
Contracts
>
Capital Contract
>
American Process Group 3/30/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2022 10:38:27 AM
Creation date
4/15/2022 10:25:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
3/30/2022
Council Approval Date
2/16/2022
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2022 Biosolids Removal and Disposal
Public Works WO Number
UT3752-30
Tracking Number
0003285
Total Compensation
$1,462,035.31
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
American Process Group LLC 6/30/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ISewer ft Water <br /> Snohomish Power Equipment Operators-Underground Hard Tait End Dump Articulating Off- Road $76.77 15J 11G 8X View <br /> Sewer a Water Equipment 45 Yards. ft Over <br /> I Snohomish Power Equipment Operators-Underground Hard Tail End Dump Articulating Off-road $76.09 15J 11G 8X View <br /> Sewer a Water Equipment Under 45 Yards <br /> Snohomish Power Equipment Operators-Underground Horizontal/Directional Drill Locator $75.50 15J 11G 8X View <br /> Sewer a Water <br /> Snohomish Power Equipment Operators-Underground Horizontal/Directional Drill OperatorI $76.09 15J 11G 8X View <br /> Sewer Et Water <br /> Snohomish Power Equipment Operators-Underground Hydralifts/boom trucks: 10 tons and under $72.30 7A 11H- 8X View <br /> I <br /> Sewer ft Water <br /> Snohomish Power Equipment Operators-Underground Hydralifts/boom trucks: over 10 tons $75.60 7A 11H 8X View <br /> Sewer a Water <br /> Snohomish Power Equipment Operators-Underground Leverman $78.44 7A 11H 8X View <br /> ISewer a Water <br /> Snohomish Power Equipment Operators-Underground Loader, Overhead, 6 Yards. But Not $76.77 15J 11G 8X View <br /> Sewer a Water Including 8 Yards <br /> Snohomish Power Equipment Operators-Underground Loaders, Overhead Under 6 Yards I <br /> Sewer a Water $76.09 15J 11G 8X View <br /> Snohomish Power Equipment Operators-Underground Loaders, Plant Feed $76.09 15J 11G 8X View <br /> Sewer a Water <br /> I <br /> Snohomish Power Equipment Operators-Underground Loaders: Elevating Type Belt $75.50 15J 11G 8X View <br /> Sewer a Water <br /> Snohomish Power Equipment Operators-Underground Locomotives,All $76.09 15J 11G 8X View <br /> Sewer a Water <br /> I Snohomish Power Equipment Operators-Underground Material Transfer Device $76.09 15J 11G 8X View <br /> Sewer a Water <br /> Snohomish Power Equipment Operators-Underground Mechanics: all(Leadmen-$0.50 per hour $77.63 7A 11 ti 8X View <br /> Sewer a Water over mechanic) <br /> ISnohomish Power Equipment Operators-Underground Motor Patrol Graders $76.77 15J 11G 8X View <br /> Sewer a Water <br /> Snohomish Power Equipment Operators-Underground Mucking Machine,Mole,Tunnel Drill, $76.77 15J 11G 8X View <br /> ISewer a Water Boring, Road Header And/or Shield _ <br /> Snohomish Power Equipment Operators-Underground Oil Distributors, Blower Distribution a $72.20 15J 11G 8X View <br /> Sewer a Water Mulch Seeding Operator <br /> Snohomish Power Equipment Operators-Underground Outside Hoists(elevators and manlifts), $75.60 7A 11H 8X View <br /> I <br /> Sewer a Water Air Tuggers, Strato <br /> Snohomish Power Equipment Operators-Underground Overhead, bridge type: 100 tons and over $77.63 7A 11H 8X View <br /> Sewer a Water <br /> Snohomish Power Equipment Operators-Underground Overhead, bridge type:45 tons through 99 $76.87I <br /> 7A 11H 8X View <br /> Sewer a Water tons <br /> Snohomish Power Equipment Operators-Underground Pavement Breaker $72.20 15J 11G 8X View <br /> Sewer a Water <br /> I Snohomish Power Equipment Operators-Underground Pile Driver(other Than Crane Mount) $76.09 15J 11G 8X View <br /> Sewer a Water <br /> Snohomish Power Equipment Operators-Underground Plant Oiler-Asphalt,Crusher $75.50 15J 11G 8X View <br /> Sewer a Water <br /> ISnohomish Power Equipment Operators-Underground Posthole Digger,Mechanical $72.20 15J 11G 8X View <br /> Sewer a Water <br /> Snohomish Power Equipment Operators-Underground Power Plant $72.20 15J 11G 8X View <br /> Sewer a Water <br /> I <br /> Snohomish Power Equipment Operators-Underground Pumps-Water $72.20 15J 11G 8X View <br /> Sewer a Water <br /> Snohomish Power Equipment Operators-Underground Quad 9, Hd 41, D10 And Over $76.77 15J 11G 8X View <br /> Sewer a Water <br /> I Snohomish Power Equipment Operators-Underground Remote Control Operator On Rubber Tired $76.77 15J 11G 8X View <br /> Sewer a Water Earth Moving Equipment <br /> Snohomish Power Equipment Operators-Underground Rigger and Bellman $72.30 7A 11H 8X View <br /> Sewer a Water <br /> ISnohomish Power Equipment Operators-Underground Rigger/Signal Person, Bellman(Certified) $75.60 7A 11H 8X View <br /> Sewer a Water <br /> Snohomish Power Equipment Operators-Underground Rollagon $76.77 15J 11G 8X View <br /> ISewer a Water <br /> Snohomish Power Equipment Operators-Underground Roller, Other Than Plant Mix $72.20 15J 11G 8X View <br /> Sewer a Water <br /> Snohomish Power Equipment Operators-Underground Roller, Plant Mix Or Multi-lift Materials $75.50 15J 11G 8X View <br /> ISewer a Water <br />
The URL can be used to link to this page
Your browser does not support the video tag.