My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 3/30/2022
>
Contracts
>
Capital Contract
>
American Process Group 3/30/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2022 10:38:27 AM
Creation date
4/15/2022 10:25:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
3/30/2022
Council Approval Date
2/16/2022
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2022 Biosolids Removal and Disposal
Public Works WO Number
UT3752-30
Tracking Number
0003285
Total Compensation
$1,462,035.31
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
American Process Group LLC 6/30/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> I <br /> I <br /> ITEM DESCRIPTION YES NO <br /> 27. Precast Railroad Crossings- Concrete Crossing Structure <br /> I Slabs. <br /> 28. 12, 18 and 26 inch Standard Precast Prestressed Girder— <br /> Standard Precast Prestressed Girder for use in structures. <br /> I Fabricator plant has annual approval of methods and materials <br /> to X <br /> be used. Shop Drawing to be provided for approval prior to <br /> casting girders. <br /> ISee Std. Spec. Section 6-02.3(25)A <br /> 29. Prestressed Concrete Girder Series 4-14 - Prestressed Concrete <br /> I Girders for use in structures. Fabricator plant has annual <br /> approval <br /> of methods and materials to be used. Shop Drawing to be X <br /> provided for approval prior to casting girders. <br /> I <br /> See Std. Spec. Section 6-02.3(25)A <br /> 30. Prestressed Tri-Beam Girder- Prestressed Tri-Beam Girders for <br /> I use in structures. Fabricator plant has annual approval of <br /> methods and materials to be used. Shop Drawing to be <br /> provided X <br /> I for approval prior to casting girders. <br /> See Std. Spec. Section 6-02.3(25)A <br /> 31. Prestressed Precast Hollow-Core Slab—Precast Prestressed <br /> I Hollow-core slab for use in structures. Fabricator plant has <br /> annual <br /> approval of methods and materials to be used. Shop Drawing to X <br /> be provided for approval prior to casting girders. <br /> I See Std. Spec. Section 6-02.3(25)A. <br /> 32. Prestressed-Bulb Tee Girder- Bulb Tee Prestressed Girder for <br /> I <br /> use in structures. Fabricator plant has annual approval of <br /> methods and materials to be used. Shop Drawing to be <br /> provided X <br /> I for approval prior to casting girders. <br /> See Std. Spec. Section 6-02.3(25)A <br /> 33. Monument Case and Cover X <br /> ISee Std. Plan. <br /> I <br /> Supplemental to Wage Rates 5 <br /> 01/05/2022 Edition, Published January 5, 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.