My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 3/30/2022
>
Contracts
>
Capital Contract
>
American Process Group 3/30/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2022 10:38:27 AM
Creation date
4/15/2022 10:25:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
3/30/2022
Council Approval Date
2/16/2022
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2022 Biosolids Removal and Disposal
Public Works WO Number
UT3752-30
Tracking Number
0003285
Total Compensation
$1,462,035.31
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
American Process Group LLC 6/30/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> I <br /> IITEM DESCRIPTION YES NO <br /> 42. Traffic Signs - Prior to approval of a Fabricator of Traffic Signs, <br /> I the sources of the following materials must be submitted and <br /> approved for reflective sheeting, legend material, and <br /> aluminum <br /> I sheeting. <br /> NOTE: *** Fabrication inspection required. Only signs tagged <br /> "Fabrication Approved" by WSDOT Sign Fabrication Inspector <br /> to be installed <br /> I <br /> Custom Std <br /> Message Signing <br /> Message <br /> 43. Cutting & bending reinforcing steel X <br /> I44. Guardrail components X X <br /> Custom Standard <br /> End Sec Sec <br /> 45. Aggregates/Concrete mixes Covered by <br /> WAC 296-127-018 <br /> 46. Asphalt Covered by <br /> I <br /> WAC 296-127-018 <br /> 47. Fiber fabrics X <br /> I <br /> 48. Electrical wiring/components X <br /> 49. treated or untreated timber pile X <br /> I50. Girder pads (elastomeric bearing) xr <br /> I51. Standard Dimension lumber X <br /> 52. Irrigation components X <br /> I <br /> I <br /> I <br /> I <br /> ISupplemental to Wage Rates 7 <br /> 01/05/2022 Edition, Published January 5, 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.