Laserfiche WebLink
I <br /> I <br /> I <br /> IITEM DESCRIPTION YES NO <br /> 42. Traffic Signs - Prior to approval of a Fabricator of Traffic Signs, <br /> I the sources of the following materials must be submitted and <br /> approved for reflective sheeting, legend material, and <br /> aluminum <br /> I sheeting. <br /> NOTE: *** Fabrication inspection required. Only signs tagged <br /> "Fabrication Approved" by WSDOT Sign Fabrication Inspector <br /> to be installed <br /> I <br /> Custom Std <br /> Message Signing <br /> Message <br /> 43. Cutting & bending reinforcing steel X <br /> I44. Guardrail components X X <br /> Custom Standard <br /> End Sec Sec <br /> 45. Aggregates/Concrete mixes Covered by <br /> WAC 296-127-018 <br /> 46. Asphalt Covered by <br /> I <br /> WAC 296-127-018 <br /> 47. Fiber fabrics X <br /> I <br /> 48. Electrical wiring/components X <br /> 49. treated or untreated timber pile X <br /> I50. Girder pads (elastomeric bearing) xr <br /> I51. Standard Dimension lumber X <br /> 52. Irrigation components X <br /> I <br /> I <br /> I <br /> I <br /> ISupplemental to Wage Rates 7 <br /> 01/05/2022 Edition, Published January 5, 2022 <br />