My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 3/30/2022
>
Contracts
>
Capital Contract
>
American Process Group 3/30/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2022 10:38:27 AM
Creation date
4/15/2022 10:25:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
3/30/2022
Council Approval Date
2/16/2022
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2022 Biosolids Removal and Disposal
Public Works WO Number
UT3752-30
Tracking Number
0003285
Total Compensation
$1,462,035.31
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
American Process Group LLC 6/30/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(3) All travel time that relates to the work covered under subsection (2) of this section <br /> requires the payment of prevailing wages. Travel time includes time spent waiting to load, <br /> loading, transporting, waiting to unload, and delivering materials. Travel time would <br /> include all time spent in travel in support of a public works project whether the vehicle is <br /> ' empty or full. For example, travel time spent returning to a supply source to obtain another <br /> load of material for use on a public works site or returning to the public works site to obtain <br /> another load of excavated material is time spent in travel that is subject to prevailing wage. <br /> Travel to a supply source, including travel from a public works site, to obtain materials for <br /> use on a private project would not be travel subject to the prevailing wage. <br /> (4) Workers are not subject to the provisions of chapter 39.12 RCW when they deliver <br /> ' materials to a stockpile. <br /> (a) A "stockpile" is defined as materials delivered to a pile located away from the site <br /> of incorporation such that the stockpiled materials must be physically moved from the <br /> stockpile and transported to another location on the project site in order to be incorporated <br /> into the project. <br /> (b) A stockpile does not include any of the functions described in subsection (2)(a) <br /> through (f) of this section; nor does a stockpile include materials delivered or distributed <br /> to multiple locations upon the project site; nor does a stockpile include materials dumped <br /> ' at the place of incorporation, or adjacent to the location and coordinated with the <br /> incorporation. <br /> ' (5)The applicable prevailing wage rate shall be determined by the locality in which the <br /> work is performed.Workers subject to subsection (2)(d) of this section, who produce such <br /> materials at an off-site facility shall be paid the applicable prevailing wage rates for the <br /> county in which the off-site facility is located. Workers subject to subsection (2) of this <br /> ' section, who deliver such materials to a public works project site shall be paid the <br /> applicable prevailing wage rates for the county in which the public works project is located. <br /> I <br /> [Statutory Authority: Chapter 39.12 RCW, RCW 43.22.051 and 43.22.270. 08-24-101, § <br /> 296-127-018,filed 12/2/08,effective 1/2/09.Statutory Authority: Chapters 39.04 and 39.12 <br /> RCW and RCW 43.22.270. 92-01-104 and 92-08-101, § 296-127-018, filed 12/18/91 and <br /> 4/1/92, effective 8/31/92.] <br /> I <br /> 111 <br /> Supplemental to Wage Rates 11 <br /> 01/05/2022 Edition, Published January 5, 2022 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.