My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 3/30/2022
>
Contracts
>
Capital Contract
>
American Process Group 3/30/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2022 10:38:27 AM
Creation date
4/15/2022 10:25:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
3/30/2022
Council Approval Date
2/16/2022
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2022 Biosolids Removal and Disposal
Public Works WO Number
UT3752-30
Tracking Number
0003285
Total Compensation
$1,462,035.31
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
American Process Group LLC 6/30/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 2113 - 1 <br /> I2022 Biosolids Removal and Disposal UT 3752-30 <br /> ISECTION 00 2113 - INSTRUCTIONS TO BIDDERS <br /> I1.1 GENERAL DESCRIPTION AND LOCATION OF PROJECT <br /> A. The Work to be performed will include furnishing all labor, materials, and <br /> I equipment necessary to perform all Work as required by the Contract in <br /> accordance with the Contract Documents. <br /> I B. The Project Site is located at 4027 4th Street Southeast, Everett WA. See <br /> Appendix A. <br /> I1.2 PROJECT MANAGER <br /> A. Questions and inquiries about the Contract Documents should be directed to the <br /> I attention of Hanna Lintukorpi, City of Everett Project Manager at (425) 257-8946 <br /> or email hlintukorpi@everettwa.gov. <br /> I1.3 STANDARD SPECIFICATIONS <br /> I A. The following other Specifications and Standard Plans shall apply to the extent <br /> to which they are called out in the Contract Documents. <br /> I 1 . WSDOT "Standard Specifications for Road, Bridge and Municipal <br /> Construction", as amended by the APWA Supplements, hereinafter referred <br /> to as the "Standard Specifications", current edition as of bid date. <br /> I 2. City of Everett "Design and Construction Standards and Specifications" <br /> current edition as of bid date, as found online on the City's Website at: <br /> httbs://everettwa.gov/1531/Design-Construction-Standards <br /> I 3. "Standard Plans for Road and Bridge Construction," current edition as of <br /> bid date prepared by WSDOT. <br /> 4. "Manual on Uniform Traffic Control Devices" (MUTCD), current edition as <br /> I of bid date. <br /> 5. APWA Standards, current edition as of bid date. <br /> 6. AWWA Standards, current edition as of bid date. <br /> I <br /> 7. American Concrete Institute (ACI), current edition as of bid date. <br /> 1.4 EXAMINATION OF SITE CONDITIONS, CONTRACT DOCUMENTS AND <br /> IREGULATIONS <br /> Bidders shall inspect the Site of the Work and carefully review the Contract <br /> IA. <br /> Documents to satisfy themselves, by personal examination, physical testing, or <br /> by such other means as they may prefer, of the location of the proposed Work, <br /> the actual physical conditions of and at the Site, surface and subsurface <br /> I <br /> 002113 - 1 INSTRUCTIONS TO BIDDERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.