My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 3/30/2022
>
Contracts
>
Capital Contract
>
American Process Group 3/30/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2022 10:38:27 AM
Creation date
4/15/2022 10:25:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
3/30/2022
Council Approval Date
2/16/2022
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2022 Biosolids Removal and Disposal
Public Works WO Number
UT3752-30
Tracking Number
0003285
Total Compensation
$1,462,035.31
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
American Process Group LLC 6/30/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 2113 - 6 <br /> 2022 Biosolids Removal and Disposal UT 3752-30 I <br /> b) Have a Washington Employment Security Department <br /> number, as required in Title 50 RCW; I <br /> c) Have a Washington Department of Revenue state excise <br /> tax registration number, as required in Title 82 RCW. <br /> 3) Disqualification. Not be disqualified from bidding on any public I <br /> works contract under RCW 39.06.010 or 39.12.065(3). <br /> 4) Apprentices. If the Project is subject to the apprenticeship <br /> utilization requirements in RCW 39.04.320, not have been found I <br /> out of compliance by the Washington state apprenticeship and <br /> training council for working apprentices out of ratio, without <br /> appropriate supervision, or outside their approved work I <br /> processes as outlined in their standards of apprenticeship under <br /> chapter 49.04 RCW for the one-year period immediately <br /> preceding the date of the bid solicitation. I <br /> 5) Within the three-year period immediately preceding the date of <br /> the bid solicitation, not have been determined by a final and <br /> binding citation and notice of assessment issued by the I <br /> department of labor and industries or through a civil judgment <br /> entered by a court of limited or general jurisdiction to have <br /> willfully violated, as defined in RCW 49.48.082, any provision of I <br /> chapter 49.46, 49.48, or 49.52 RCW. <br /> 6) Have received training on the requirements related to public <br /> works and prevailing wage under chapter 39.04 RCW and I <br /> chapter 39.12 RCW. <br /> 7) Supplemental Bidder Responsibility Criteria: RCW 39.04.350(2). <br /> If this Project is subject to supplemental bidder responsibility I <br /> criteria, then such criteria will be contained in SECTION 00 2213, <br /> SUPPLEMENTAL INSTRUCTIONS TO BIDDERS. If there is no <br /> SECTION 00 2213, SUPPLEMENTAL INSTRUCTIONS TO I <br /> BIDDERS in the bid package, then the Project is not subject to <br /> supplemental bidder responsibility criteria. <br /> d. BID PROTESTS: All protests by Bidders must be in accordance with I <br /> Everett Municipal Code 3.46, "Bid Protest Procedures." <br /> B. Pre-Award Conference I <br /> 1. After Bid opening, but prior to award, the apparent successful Bidder shall, <br /> if requested by the City, attend a pre-award conference to respond to <br /> questions by the City regarding evaluation of Bids. The City will emphasize I <br /> items such as insurance and bonding that will assist in prompt issuance of <br /> the Notice to proceed. By conducting a pre-award conference, the City has <br /> not thereby waived its right to make determinations regarding <br /> responsiveness and responsibility of the Bidder. <br /> I <br /> 00 2113 - 6 INSTRUCTIONS TO BIDDERS I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.