My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snohomish County PUD 3/30/2022
>
Contracts
>
Agreement
>
Lease
>
Snohomish County PUD 3/30/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2022 1:53:44 PM
Creation date
4/15/2022 1:52:54 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snohomish County PUD
Approval Date
3/30/2022
Council Approval Date
3/30/2022
End Date
6/30/2037
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Community Solar Property Lease
Tracking Number
0003294
Total Compensation
$3,500.00
Contract Type
Agreement
Contract Subtype
Lease
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C - PROJECT DESCRIPTION <br /> Snohomish PUD (PUD) will install a 450-kW DC/375-kW AC community solar project in South Everett <br /> adjacent to Walter E Hall park to: <br /> 1. Reduce energy burden for PUD's most vulnerable customers by directing solar generation <br /> benefits to Project PRIDE (Providing Relief for Individuals Dependent on Energy), a fund administered by <br /> St.Vincent de Paul (SvDP) that provides emergency utility assistance to PUD electric customers. <br /> 2. Utilize the solar array to reduce summer peak demand on PUD summer peaking circuits in the <br /> Casino Road area. <br /> The work plan for this project involves the following several activities. <br /> Lease Agreement <br /> The PUD and Everett will establish a lease agreement, allowing PUD access to Everett's property to <br /> construct the solar array. <br /> Procurement,Site Preparation and System Installation <br /> The PUD will utilize its public bid process to solicit,evaluate and select contractors for the solar array <br /> design and engineering plans, site preparation and civil work and solar array equipment procurement <br /> and installation. <br /> Site Preparation and System Installation <br /> The plan to design and install the solar array will include the following activities: <br /> • Conducting a PUD System Impact Study <br /> • Securing approvals from Everett as required by the Lease Agreement <br /> • Securing required permits with Everett and other entities as appropriate. <br /> • Preparing the site for system installation including site clearing and electrical upgrades. <br /> • Hiring a consultant to develop system specifications, design and engineering plans. <br /> • Selecting an installer to procure necessary equipment and install the solar array. <br /> • Coordinating required interconnection agreements with Bonneville Power Administration <br /> • Connecting system to the electrical grid and commissioning. <br /> Community Engagement and Education <br /> PUD will collaborate with Everett and SVdP on a Community Engagement Plan that takes into account <br /> the following: <br /> • Opportunities for community input from the Casino Road neighborhood. <br /> • Community engagement and education after the installation that highlights the value of the <br /> project to the electrical grid, and the support it will provide to community members in need through <br />