My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snohomish County PUD 3/30/2022
>
Contracts
>
Agreement
>
Lease
>
Snohomish County PUD 3/30/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2022 1:53:44 PM
Creation date
4/15/2022 1:52:54 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snohomish County PUD
Approval Date
3/30/2022
Council Approval Date
3/30/2022
End Date
6/30/2037
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Community Solar Property Lease
Tracking Number
0003294
Total Compensation
$3,500.00
Contract Type
Agreement
Contract Subtype
Lease
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Permitted Uses—Community Solar Project. <br /> a. The Lessee may use and occupy the Premises for all reasonable purposes and <br /> activities necessary and/or appropriate for the operation of the Community Solar Project at <br /> Lessee's sole cost and expense, including but not limited to installing, erecting, operating, <br /> maintaining, and repairing the Community Solar Project, so long as such purposes and activities <br /> do not interfere with the Lessor's use of the Property ("Permitted Use"). Lessee shall not use or <br /> permit the use of the Premises for any other use without the prior written consent of Lessor,which <br /> may be withheld at Lessor's sole discretion. The Community Solar Project is generally described <br /> on attached and incorporated Exhibit "C." In the event of any conflict or inconsistency between <br /> Exhibit "C" and any other part of the Lease, such other part of the Lease governs. Lessee shall <br /> keep the Lessor's gates to the Property secure, and Lessee shall not allow the public to access the <br /> Property or the Premises through the gates. <br /> b. Unless otherwise directed by Lessor,Lessee shall remove,at Lessee's sole cost and <br /> expense, the Community Solar Project and any other Lessee-installed Premises improvements <br /> within ninety (90) days following the termination of the Lease and shall surrender the Premises to <br /> the Lessor in the same or better condition as existed at the Commencement Date of this Lease,less <br /> ordinary wear and tear. Lessee shall also so remove within such time any conduit or other <br /> improvements on the Property installed by Lessee, if so requested by the Lessor. <br /> c. Lessee may access Premises twenty-four (24) hours per day, seven (7) days per <br /> week using the Lessor's access roads on the Property depicted on Exhibit B, so long as such access <br /> does not interfere with the Lessor's use of the Property. To extent parking is not used by Lessor's <br /> employees and contractors, Lessee's employees and contractors may use parking on the Property. <br /> Subject to the requirements of Section 6 below, Lessee may construct access road improvements <br /> within the Premises to connect existing access roads. The location of such improvements will <br /> be determined by Lessor at Lessor's sole discretion. Lessee will be responsible for all costs to <br /> maintain such Lessee-constructed access road improvements for the duration of the Lease. <br /> d. Subject to the requirements of Section 6, Lessee may install utility or electrical <br /> conduits and any other improvements on the Property for the purpose of connection to the <br /> Premises. The location of such conduits or improvements will be determined by Lessor at <br /> Lessor's sole discretion. If the Lessor determines that such improvements after installation <br /> interfere with the Lessor's use of the Property, Lessor shall give written notice thereof to the <br /> Lessee, and then Lessee shall then promptly relocate such improvements to a new location as <br /> determined by Lessor. <br /> 4. Right to Require Removal. The Property contains Lessor's water utility <br /> infrastructure, including Reservoir #6 (North and South), the Casino Elevated Tank, and other <br /> above ground and underground improvements. In the event that Lessor reasonably determines <br /> that some or all or the Lessee's improvements on the Property (including without limitation the <br /> Community Solar Project) must be temporarily removed or relocated so that Lessor can operate, <br /> maintain,and repair Lessor's utility improvements,and upon ninety(90)days' written notice from <br /> Lessor, Lessee shall promptly complete such removal or relocation at no cost to Lessor. In the <br /> event of emergency affecting Lessor's water utility infrastructure, Lessor may remove or relocate <br /> without any liability whatsoever to Lessee some or all of Lessee's improvements as Lessor <br /> Page 2 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.