Laserfiche WebLink
ASPHALT ROOFING - - <br />�E INSTALL PER MFG. SIDING (TO MATCH EXIST.) <br />------ SPECS. OVER <br />OVER 30# ASPHALT FELT ` <br />------- <br />ASPHALT PAPER AND <br />GRACE ICE AND WATER <br />SHEILD 3'-0" MIN. IN FROM Z - FLASHING <br />ASPHALT ROOFING; INSTALL PER FASCIA <br />MFG. SPECS. OVER 30# ASPHALT METAL DRIP EDGE — SHEET METAL PAN <br />PAPER AND GRACE ICE AND WATER FLASHING ORCHANNEL FLASHING 4" H. x 0 M <br />SHIELD 3'-0" MIN. UP FROM FASCIA, 6" W. W/3/4" RETURN 0 0 <br />PLYWD. SHEATHING PER STRUCT. 2x12 FASCIA co <br />Win <br />1-1/2" GAP FOR AIRFLOW f, j m mPLYWOOD SHEATHING ROOFING PER PLAN, <br />DRIP EDGE, TYP. ; > <br />2x BLKG. W/.915 SF SCREENED L OUT -RIGGER PER TRUSS TYP. w 1- <br />HOLES PER ROOF PLAN MANUF. SPECS. 1-6 <br />w 2 m <br />GUTTER TO MATCH EXIST. - SIDING OVER HOUSWRAP W Ix m <br />OR 30# ASPHALT FELT <br />BATTEN SYSTEM IF NEC. <br />2X12 FASCIA, PAINT, TYP. PAPER OVER ICE & W N n <br />WATERSHEILD N N d <br />NEW EXTERIOR 2x6 STUD WALL PER LEGEND PREMFD. TRUSS PLYWD. -SEE STRUCTURAL 0 W In <br />nn <br />NEW GYP. BD. FINISH (5/8" CEILING; 1/2" WALL U.N.O.) LEDGER SEE STRUCTURAL F N <br />PLYWD. OVER 2X STUDS - SEE STRUCT. W z <br />uj <br />ROOF SAVE DETAROOF�_ 60 > <br />2 RAKE DET. ROOF / WALL Q Q m <br />-0" 1 1 /2" = V-0" Q3 3" - 1'-0" W 0- v 2 <br />�� E LL—n <br />¢� v�M <br />® N <br />SOLID WALL DBL. 2x FRAMING v w a H N <br />SHEATHING @ WINDOW vi co <br />(SEE JAMB. N 0 <br />WINDOW I NEW SIDING O/HOUSE DUAL GLAZED VINYL STRUCT.) CORNER BEAD T w u n 0 Q <br />NEW EXT. WALL PER SCHED. f- CC <br />WRAP TO MATCH EXIST. 1/2" GYP. BD. ¢ <br />HEADER WINDOW SYSTEM SHIM AS REQ'D. SOUND BATT v cn r �- <br />(SEE STRUCT.) <br />SOLID WALL CORNER BEAD INSUL _ CC <br />R-10 RIGID SHEATHING WHERE OCCURS O O <br />INSUL., TYP. (SEE STRUCT.) - SHIM AS REQ'D. SILL �' WOOD STUDS O <br />SEALANT W/ _ BELOW PER 2X6 TREATED PLATE WALL LEGEND o 0 <br />2x DF STUD <br />BUTYL RUBBER FLASHING BACKER <br />W/ SELF-ADHESIVE '' ' ' `' ' • � WALL W/BATT ., E- � <br />1/2" GYP. BD. ROD INSULATION. CONC. SLAB O/ W.P. MEMBRANE 1!2" GYP. BD. w O <br />BACKING. APPLY OVER EA. O z <br />' INFILTRATION BARRIER DBL. 2x FRAMING <br />O/ AGGREGATE BASE TYP. N - <br />AS SHOWN. @ WINDOW SIDE z cc <br />JAMB. BASE EA. SIDE, TYP. 00 <br />SEALANT AS REQ'D. 0 <br />BUTYL RUBBER FLASHING W/ SELF- 0 w <br />ADHESIVE BACKING. APPLY OVER - - - - - - - - - - - - <br />INFILTRATION BARRIER AS SHOWN. o <br />26 GA. GALV. o D Q _ <br />HEAD <br />FLASHING <br />PRES. o p <br />CO PLATE TREATED 2X <br />CORNER SHIM AS NECESSARY NEW SIDING O/HOUSE <br />BEAD DUAL GLAZED 1/2" GYP. BD. WRAP TO MATCH EXIST. <br />VINYL SOLID WALL SHEATHING (SEE <br />DUAL GLAZED 8" CONC. STEMWALL 145" DIA. POWDER o <br />WINDOW SYSTEM STRUCT.) BUTYL RUBBER VINYL • • - �_� DRIVEN PINS @ 18 -� 0 <br />FLASHING STEM O.C. cr w (1"j <br />I �nnnm��n� w t./ <br />2x DF STUD WALL W/ W/ SELF-ADHESIVE SEALANT W/ - 8"X16" CONT. FOOTING <br />BATT INSULATION. BACKING. APPLY OVER BACKER <br />rr <br />INFILTRATION BARRIER ROD - 5 i- „� <br />,� CONC. SLAB, TYP. w O <br />NEW SIDING O/HOUSE AS SHOWN. <br />v� 0 <br />WRAP TO MATCH EXIST. ¢ o <br />WIN. HEAD DET, WIN.SILL DET; WIN.JAMB DET,WALL=SLAB <br />5FDN. DET. <br />LAB DET. U) 0 <br />a: <br />3" - 1'-0" 6 3" = V-0" / 3" = 1'-0" 1 1 1, 0, 1 2 3" = V-0" z = <br />Oz co <br />LU <br />STEP 1 - WCORNER STEP 2 - SAF TAB T - -;:L- SUBFLOOR SHEATHING SEE STRUCT <br />S STEP 3 SAF .SILL STEP 4 SAF JAMB STEP 5 WINDOW EXTERIOR DOOR a (r <br />SAF SILL FLASHING = o <br />GRACE "VYCORNER" SELF ADHESIVE THRESHOLD <br />OR SIMILIAR FLASHING (SAF) Fr ¢ ' <br />FLASHING. EXTEND Z _O <br />y BEHAIND WRAP 6" MIN O V J <br />P.T. SILL PLATE PER STRUCT. v w I ' ' <br />4" SIDING CUT OUT � N o cc <br />� <br />W <br />\�� ° __ PRE FORMED EXPANSION JOINT w <br />LEAVE 4" OF PAPER MATERIAL ca U <br />ON BOTTOM OF SILL D <br />NEW 2X6 RAFTERS METAL <br />FLASHING (TO BE �' w >- <br />ADHERED TO ROOF d m a_.:' ¢ O <br />BUILDILNG WRAP) <br />C] U <br />QY W G) <br />o CC N <br />, w O \„�J 00 <br />BASEMEN <br />4 T c7 z <br />E <br />a - <br />- I <br />y r Ou <br />CONC. SLAB ON GRADE REF. STRUC , v ul � W <br />a <br />Q ((,%) <br />ti Q a ANCHOR BOLTS PER STRUCT. ¢ W <br />zU W > <br />--a REBAR PER STRUCT. � z W <br />0 L <br />EXIST. WALL a �- FURRING PER PLAN 00 z > <br />STEP 6 - SECOND SAF JAMB STEP 7 METAL HEAD FLASHING STEP 8 - BUILDLNG WRAP TEP - _ wo W °` <br />S 9 SAF HEAD FLASHING �Q J Q <br />CONN. ROOF TO EXIST WALL;TYPICAL FDN, DETAIL 0 <br />IJ <br />8 1 1/2" = 1'-0" 9 1" = V-0" 0 <br />LEAVE 4" OF PAPER ON SIDE METAL HEAD FLASHING r^ <br />V J lL <br />OF JAMB FLASHING (TO BE " O cV <br />ADHERED TO BUILDING WRAP) j tco <br />tz U <br />J <br />sr, <br />Wz <br />N <br />U) 0 <br />Y z <br />Q cn rn <br />ry� <br />k W LL <br />Z 0 <br />O ¢ w v <br />s 4 s R£ <br />Ld <br />IS 00 cn <br />lco <br />ADHERE SILL & JAMB' <br />LAP ONTO SIDE FLASHING TO N 0 <br />W <br />OF WINDOW BUILDING WRAP �V) H <br />rt Lo <br />N U <br />NOTE: HOSE TEST FIRST WINDOW INSTALLED TO TEST FOR WATER INFILTRATION v � F <br />TYPICAL WINDOW FLASHING Lu 0 ) z <br />10 3 =1-0 _CD <br />CL N U <br />Q 0) <br />