Laserfiche WebLink
0 <br />c <br />s t r z <br />s = I Bid a <br />14 <br />SUMMARY OF WORK <br />Project consists of new construction as shown on these Contract Documents used in coordination with the <br />Architectural and other discipline's documents. <br />DEFINITIONS <br />The following acronyms are used throughout these structural notes: <br />IBC - Governing code, including local amendments <br />SER - Structural Engineer of Record per these Contract Documents <br />UNO - unless noted otherwise <br />ASTM - American Society for Testing and Materials <br />GOVERNING CODE <br />All design and construction shall conform to the 2015 International Building Code and local jurisdiction <br />amendments. <br />Reference to ASTM and other standards shall refer to the latest edition designated by IBC Chapter 35. <br />Refer to the specifications for information in addition to that covered by these structural notes and <br />drawings. <br />DOCUMENTS <br />Structural Documents shall be used in conjunction with Architectural Documents for all bidding and <br />construction. <br />Drawings indicate general and typical details of construction. Typical details and general notes shall apply <br />even if not specifically denoted on plans, UNO. Where conditions are not specifically indicated similar <br />details of construction shall be used, subject to review and approval by the Architect and the SER. <br />These Contract Documents and any materials used in preparation of them, including calculations, are the <br />exclusive property of the SER and can be reproduced only with the permission of the SER. <br />WARRANTY <br />The SER has used that degree of care and skill ordinarily exercised under similar circumstances by <br />members of the profession in this locale and no other warranty, either expressed or implied, is made in <br />connection with rendering professional services. <br />OWNER RESPONSIBILITY <br />The owner shall retain a Special inspector to perform the special inspection requirements required by the <br />building official and as outlined in the Special Inspection section below. <br />'l \ <br />BUILDING CATEGORY <br />Structural Risk Category II <br />Importance factors for snow and seismic are listed with the loading criteria. <br />LIVE LOADS - ROOF <br />Live loads indicated with * are reducible per IBC <br />Partition loading has been added per IBC <br />Roof: <br />Typical 20 psf <br />Concentrated loads 300 Ibs <br />Miscellaneous: <br />Mechanical equipment weights furnished by manufacturer <br />LIVE LOADS - SNOW <br />Minimum uniform roof snow load = 25 psf <br />LATERAL LOADS - WIND <br />Numbering below is per IBC Section 1603.1.4: <br />1. Ultimate Design Wind Speed (3-second gust): V,,it = 110 mph <br />Nominal Design Wind Speed: Vasd = 85 mph <br />2. Risk Category: it <br />3. Wind Exposure: B <br />4. Internal Pressure Coefficient = +/- 0.18 <br />Additional Info: <br />5. Topographic factor: Kn = 1.0 <br />6. Directionality factor: Kd = 0.85 <br />7. Enclosure classifcation: (partially enclosed) <br />& Gust Effect Factor: G = 0.85 <br />9. Design Base shear: <br />Retail Building <br />V = 39.1 kips (E-W direction); 32.5 kips (N-S direction) <br />Dumpster Enclosure <br />V = 3.6 kips (E-W direction); 3.6 kips (N-S direction) <br />10. Analysis procedure: (directional) <br />LATERAL LOADS - EARTHQUAKE <br />Numbering below is per IBC Section 1603.1.5: <br />1. Risk Category: it <br />2. Seismic Importance Factor: le = 1.0 <br />3. Mapped Spectral Response Acceleration Parameters: S, = 1.434 g; S1 = 0.550 g <br />4. Site Class: D; FA = 1.0; Fv = 1.5 <br />5. Design Spectral Response Acceleration Parameters: SDs = 0.956 g; SDI = 0.550 g <br />6. Seismic Design Category: D <br />7. Basic Seismic Force -Resisting Systems: <br />Retail Building <br />Vertical Elements: Light -framed wood structural panels; <br />Diaphragms: Light -framed wood structural panels; <br />Dumpster Enclosure <br />Vertical Elements Masonry cantilevered shear walls, - <br />Diaphragms: Metal deck, <br />8. Design Base Shear: <br />Retail Building <br />V = 21.3 kips (E-W direction); 21.3 kips (N-S direction) <br />Dumpster Enclosure <br />V = 7.9 kips (E-W direction); 7.9 kips (N-S direction) <br />9. Seismic Response Coefficient: <br />RetailBuilding <br />Cs = 0.147 <br />Dumpster Enclosure <br />Cs = 0.756 <br />10. Response Modification Coefficient: <br />RetailBuilding <br />R = 6.5 <br />Dumpster Enclosure <br />R = 1.25 <br />11. Analysis Procedure: Equivalent Lateral Force Procedure <br />t <br />DESIGN DOCUMENTS <br />Contractor shall verify all dimensions and all conditions at the job site, including building and site <br />conditions before commencing work, and be responsible for same. All discrepancies shall be reported <br />to the Architect before proceeding with work. Any errors, ambiguities and/or omissions in the contract <br />documents shall be reported to the Architect immediately, in writing. No work is to be started before <br />correction is made. <br />Contractor shall verify and/or coordinate all dimensioned openings and slab edges shown on the <br />contract documents. Some dimensions, openings and embedded items are shown on the structural <br />drawings. Others may be required. Refer to architectural drawings for size and location of curbs, <br />equipment pads, wall and floor openings, architectural treatment, embeds required for architectural <br />items and dimensions. Refer to mechanical, plumbing, electrical and fire protection drawings for size <br />and location of all openings for ducts, piping, conduits, etc. Submit openings to Architect for review. <br />Do not scale drawings. Use only field verified dimensions. When electronic plan files are provided for <br />the Contractor's detailing convenience, it shall be noted that the electronic files are not guaranteed to <br />be dimensionally accurate. The Contractor uses them at their own risk. The published paper documents <br />are the controlling Contract Documents. Electronic files of detail sheets and notes will not be provided. <br />CONTRACTOR- INITIATED CHANGES <br />Contractor -initiated changes shall be submitted in writing to the Architect for review and acceptance <br />prior to fabrication or construction. Changes shown on shop drawings only will not satisfy this <br />requirement. <br />INSPECTIONS <br />The Contractor shall coordinate with the building department for all building department required <br />inspections. <br />TEMPORARY SHORING AND BRACING <br />The Contractor shall provide temporary bracing as required until all permanent connections and <br />stiffening have been installed. The Contractor is responsible for the strength and stability of all partially <br />completed structures including but not limited to concrete or masonry walls, steel framing and erection <br />aids. The Contractor shall, at their discretion, employ the aid of a licensed Structural Engineer to design <br />all temporary bracing and shoring necessary to complete the work described in these contract <br />documents. The Contractor shall be responsible for all required safety standards, safety precautions and <br />the methods, techniques, sequences or procedures required in performing their work. For concrete <br />construction refer to ACI 318 - Section 26.11.2 "Removal of Formwork". <br />SAFETY PROCEDURES <br />Contractor shall be responsible for all safety precautions and the methods, techniques, sequences or <br />procedures required to perform the contractor's work. The Structural Engineer has no overall <br />supervisory authority or actual and/or direct responsibility for the specific working conditions at the site <br />and/or for any hazards resulting from the actions of any trade contractor. The Structural Engineer has <br />no duty to inspect, supervise, note, correct, or report any health or safety deficiencies to the Owner, <br />Contractors, or other entities or persons at the project site. <br />SHOP DRAWINGS AND SUBMITTALS <br />SHOP DRAWING & SUBMITTAL REVIEW (including Deferred Structural Components) <br />The contractor must review and stamp the shop drawings & submittals for review. SER will only review <br />submittals for items shown on SER documents. Submittals for Deferred Structural Components will receive <br />cursory review by SER for loads imposed on primary structure. SER will review shop drawings for general <br />conformance with design concept of the project and general compliance with the information given in the <br />Structural Contract Documents. Review of submittals does not constitute approval or acceptance of <br />unauthorized deviation from Contract Documents. <br />Corrections or comments made on shop drawings during this review do not relieve Contractor from <br />compliance with the requirements of the plans and specifications. <br />Contractor responsible for: <br />• Reviewing, approving, stamping and signing submittals prior to submittal to Architect and SER <br />• Timing submittals to allow two weeks of review time for the SER and time for corrections and/or <br />resubmittal <br />® Conformance to requirements of the Contract Documents <br />• Dimensions and quantities <br />• Verifying information to be confirmed or coordinated <br />Information solely for fabrication, safety, means, methods, techniques and sequences of construction <br />Coordination of all trades <br />Resubmittals shall be clouded and dated for all changes to the submittal. Only clouded portions of <br />resubmittal will be reviewed and SER's review stamp applies to only these areas. <br />SUBSTITUTIONS <br />Substitutions shall be submitted in writing prior to submittal of shop drawings. Shop drawings bearing <br />substitutions will be rejected. Submit engineering data to substantiate the equivalence of the proposed <br />items. The SER's basic services contract does not include review of substitutions that require re - <br />engineering of the item or adjacent structure. Nor does the SER's contract cover excessive review of <br />proposed substitutions. The fees for making these reviews and/or redesign shall be paid by the <br />Contractor. Reviews and approvals shall not be made until authorization is received. <br />SUBMITTALS <br />Shop drawings and material submittals shall be submitted to the Architect and SER prior to any fabrication <br />or construction for the following structural items. Submittals shall include one reproducible and one copy, <br />reproducible will be marked and returned. If deviations, discrepancies, or conflicts between shop drawings <br />submittals and the contract documents are discovered either prior to or after shop drawing submittals are <br />processed by the SER, the Contract Documents control and shall be followed. <br />• Concrete mix designs <br />Reinforcing bar shop drawings and placing plans <br />• Reinforcing bar mill certificates shall be available upon request <br />• Non -shrink grout material specifications and manufacturer's installation recommendations <br />• Structural steel registration/certification or quality control inspection records <br />• Structural steel shop and erection drawings <br />• Welding Procedure Specifications <br />Glued laminated members (certificates shall be on site and be available upon request) <br />• Deferred Structural Components listed below <br />DEFERRED STRUCTURAL COMPONENTS <br />Components referred to as Deferred Structural Components shall comply with these notes. These <br />elements have not been permitted under the base building application. The Contractor will be required to <br />submit the component system documents to the building official for approval. The documents shall be <br />stamped and signed by an engineer licensed by the state where the project is located. The deferred <br />structural components shall not be installed until the design and submittal documents have been <br />approved by the building official. <br />Prior to building department submittal, the deferred structural components submittals shall receive <br />cursory review by SER for loads imposed on primary structure and general conformance with design <br />concept of the project and general compliance with the information given in the Structural Contract <br />Documents. Review of submittals does not constitute approval or acceptance of unauthorized deviation <br />from Contract Documents. Submittals of contractor -designed components shall include the designing <br />professional engineer's stamp and signature, as noted above. The submittal shall be approved by the <br />component vendor prior to review by the SER. The designing professional is responsible for code <br />conformance and all necessary connections not specifically called out on architectural or structural <br />contract documents. <br />Submittals shall include details of connections to primary structure that indicate magnitude and direction <br />of all loads imposed at point of connection. Design criteria shall be provided with submittal and <br />calculations shall be made available upon request. <br />The following list includes the items that are defined as Deferred Structural Components. Refer to other <br />discipline's contract documents for additional deferred components that may require structural design <br />and details. Connections of these elements shall not induce torsion on structural members. Deferred <br />Structural Components shall be manufactured, delivered, handled, stored, and field erected in <br />conformance with instructions prepared by the component vendor. <br />Deferred structural components: <br />® Open web trusses <br />Canopies, unless detailed on Contract Documents <br />INSPECTIONS BY BUILDING OFFICIAL <br />The building official, upon notification, shall make structural inspections as required by local ordinance <br />The inspection by the building official per IBC Section 110 will be separate from and in addition to the <br />special inspection and structural observation mentioned subsequently. <br />SPECIAL INSPECTIONS <br />A Special Inspector shall be hired by the owner to perform the following special inspections per IBC <br />Section 1704. See the specifications for additional requirements for special inspection and testing. The <br />architect, structural engineer, and building department shall be furnished with copies of all inspection <br />reports and test results. <br />See IBC Chapter 17: "Special Inspections and Tests" for more detailed requirements. <br />SPECIAL INSPECTIONS AND TESTS OF SOILS (PER IBC •) <br />Frequency <br />Continuous <br />Periodic <br />1. VERIFY MATERIALS BELOW SHALLOW FOUNDATIONS ARE <br />X <br />ADEQUATE TO ACHIEVE THE DESIGN BEARING CAPACITY <br />2. VERIFY THAT EXCAVATIONS ARE EXTENDED TO PROPER <br />X <br />DEPTH AND HAVE REACHED PROPER MATERIAL <br />3. PERFORM CLASSIFICATION AND TESTING OF COMPACTED <br />X <br />FILL MATERIALS <br />4. VERIFY USE OF PROPER MATERIALS, DENSITIES AND LIFT <br />X <br />THICKNESSES DURING PLACEMENT AND COMPACTION OF <br />COMPACTED FILL <br />5. PRIOR TO PLACEMENT OF COMPACTED FILL, OBSERVE <br />X <br />SUBGRADE AND VERIFY THAT SITE HAS BEEN PREPARED <br />PROPERLY <br />Frequency <br />Verification and Inspection <br />Reference <br />Continuous <br />Periodic <br />1. INSPECT REINFORCEMENT AND VERIFY PLACEMENT <br />X <br />IBC 1908.4 <br />ACI 318: <br />20, 25.2, 25.3, <br />26.6.1-3 <br />2. INSPECTION OF ANCHORS CAST IN CONCRETE <br />X <br />ACI 318: 17.82 <br />3. INSPECTION OF ANCHORS POST -INSTALLED IN HARDENED <br />CONCRETE MEMBERS: <br />a. ADHESIVE ANCHORS INSTALLED IN HORIZONTALLY OR <br />X <br />ACI 318: 17.8.2.4 <br />UPWARDLY INCLINED ORIENTATIONS TO RESIST <br />SUSTAINED TENSION LOADS <br />b. MECHANICAL ANCHORS AND ADHESIVE ANCHORS <br />X <br />ACI 318: 17.8.2 <br />NOT DEFINED IN 4a <br />4. VERIFYING USE OF REQUIRED DESIGN MIX <br />X <br />IBC 1904.1, <br />1904.2, 1908.2, <br />1908.3, <br />ACI 318: CH. 19, <br />26.4.3, 26.4.4 <br />5. PRIOR TO CONCRETE PLACEMENT, FABRICATE SPECIMENS <br />X <br />IBC 1908.10 <br />FOR STRENGTH TESTS, PERFORM SLUMP AND AIR <br />ACI 318: 26.4, <br />CONTENT TESTS, AND DETERMINE THE TEMPERATURE OF <br />26.12 <br />THE CONCRETE <br />ASTM C172, C31 <br />SEATTLE DCI <br />DR 14-2014 <br />w� <br />z z <br />p <br />>k <br />r' <br />i e <br />-r <br />_ as u <br />` 11 OR <br />A <br />Verification and Inspection <br />Reference <br />Continuous Periodic <br />INSPECTION OF FABRICATOR'S QUALITY CONTROL X IBC 17042-S <br />PROCEDURES AISC 360-N2 <br />INSPECTION OF WELDING STRUCTURAL STEEL: AISC 360-N.5.4 <br />PER AISC 360 TABLES <br />N5.4-1, -2, -3 <br />AISC 360-N.5.5 <br />AWS D1.1 <br />INSPECTION DURING THE PLACEMENT OF ANCHOR RODS X AISC 360-N.5.7 <br />AND OTHER EMBEDMENTS SUPPORTING STRUCTURAL <br />STEEL <br />fil <br />REPORT & GENERAL CRITERIA <br />Criteria outlined in the report listed below was used for the design of the foundations: <br />NEW 7- 7 7 STORE EVERETT; WA <br />prepared by SOUTHSOUND GEOTECHNICAL CONSULTING (SEPTEMBER 18, 2018) <br />Contractor shall be familiar with recommendations in the above -mentioned report prior to start of <br />construction. Allowable soil pressure and lateral earth pressure are assumed and therefore must be verified <br />by a Geotechnical Inspector or the building official. If soils are found to be other than assumed, notify the <br />Structural Engineer for possible foundation redesign. For wet weather work, see the Geotechnical Report. <br />Unless noted otherwise, footings shall be centered below columns or walls <br />INSPECTIONS <br />All prepared soil -bearing surfaces shall be inspected by the owners Geotechnical Inspector (or building <br />official) prior to placement of reinforcing steel and concrete. Inspections shall be made per IBC Table <br />1705.6. <br />BEARING VALUES <br />All footings shall bear on undisturbed soil and shall be lowered to firm bearing if suitable soil is not found <br />at elevations shown. Exterior footings shall bear a minimum of 18" below the finished ground surface. <br />Footing elevations shown on plans (or in details) are minimum depths and for guidance only; the actual <br />elevations of footings must be established by the Contractor in the field working with the Geotechnical <br />Inspector. <br />Allowable vertical bearing soil pressure = 2,500 psf <br />Allowable lateral passive resistance = 300 psf/ft <br />Allowable coefficient of friction = 0.35 <br />SUBGRADE PREPARATION <br />Prepare subgrade per the Geotechnical Report, summarized as follows: All footings shall be cast on <br />undisturbed firm natural soils that are free of organic materials. Footing excavation shall be free of loose <br />soils, sloughs, debris and free of water at all times. If organic silt and/or fill material is encountered at <br />subgrade elevations, overexcavate a minimum of 2'-0" below the design foundation subgrade elevation <br />prior to placing footings. The overexcavated areas shall be backfilled with structural fill compacted to 95% <br />proctor per ASTM D-1557 or a lean concrete mix. <br />EXISTING UTILITIES <br />The Contractor shall determine the location of all adjacent underground utilities prior to any excavation, <br />shoring, pile driving, or pier drilling. Any utility information shown on the plans and details are approximate <br />and not verified by the SER. Contractor is to provide protection of any utilities or underground structures <br />during construction. <br />DRAINAGE <br />Drainage systems, including foundation, roof and surface drains, shall be installed as directed by the <br />Geotechnical Report. Vapor retarder placed below slab -on -grade shall conform to ASTM E 1643 and ASTM <br />E 745. <br />S001 <br />STRUCTURAL GENERAL NOTES <br />S002 <br />STRUCTURAL GENERAL NOTES <br />S100 <br />FOUNDATION PLAN <br />Silo <br />ROOF FRAMING PLAN <br />S301 <br />STRUCTURAL CONCRETE DETAILS <br />S302 <br />STRUCTURAL CONCRETE DETAILS <br />S401 <br />TRASH ENCLOSURE DETAILS <br />S601 <br />STRUCTURAL WOOD DETAILS <br />S602 <br />STRUCTURAL WOOD DETAILS <br />S603 <br />STRUCTURAL WOOD DETAILS <br />Engineer's Stamp <br />Project Title <br />Z <br />0 <br />re <br />LJJ <br />I_ <br />Ln <br />or' <br />LU <br />Project Information <br />Project No. <br />19-027-01 <br />Checked By OB <br />Issue <br />BID SET 03/13/2020 <br />Department Approval <br />Sheet Title <br />STRUCTUML <br />Sheet Number <br />