<br />SUMMARY OF WORK
<br />Project consists of new construction as shown on these Contract Documents used in coordination with the
<br />Architectural and other discipline's documents.
<br />DEFINITIONS
<br />The following acronyms are used throughout these structural notes:
<br />IBC - Governing code, including local amendments
<br />SER - Structural Engineer of Record per these Contract Documents
<br />UNO - unless noted otherwise
<br />ASTM - American Society for Testing and Materials
<br />GOVERNING CODE
<br />All design and construction shall conform to the 2015 International Building Code and local jurisdiction
<br />amendments.
<br />Reference to ASTM and other standards shall refer to the latest edition designated by IBC Chapter 35.
<br />Refer to the specifications for information in addition to that covered by these structural notes and
<br />drawings.
<br />DOCUMENTS
<br />Structural Documents shall be used in conjunction with Architectural Documents for all bidding and
<br />construction.
<br />Drawings indicate general and typical details of construction. Typical details and general notes shall apply
<br />even if not specifically denoted on plans, UNO. Where conditions are not specifically indicated similar
<br />details of construction shall be used, subject to review and approval by the Architect and the SER.
<br />These Contract Documents and any materials used in preparation of them, including calculations, are the
<br />exclusive property of the SER and can be reproduced only with the permission of the SER.
<br />WARRANTY
<br />The SER has used that degree of care and skill ordinarily exercised under similar circumstances by
<br />members of the profession in this locale and no other warranty, either expressed or implied, is made in
<br />connection with rendering professional services.
<br />OWNER RESPONSIBILITY
<br />The owner shall retain a Special inspector to perform the special inspection requirements required by the
<br />building official and as outlined in the Special Inspection section below.
<br />'l \
<br />BUILDING CATEGORY
<br />Structural Risk Category II
<br />Importance factors for snow and seismic are listed with the loading criteria.
<br />LIVE LOADS - ROOF
<br />Live loads indicated with * are reducible per IBC
<br />Partition loading has been added per IBC
<br />Roof:
<br />Typical 20 psf
<br />Concentrated loads 300 Ibs
<br />Miscellaneous:
<br />Mechanical equipment weights furnished by manufacturer
<br />LIVE LOADS - SNOW
<br />Minimum uniform roof snow load = 25 psf
<br />LATERAL LOADS - WIND
<br />Numbering below is per IBC Section 1603.1.4:
<br />1. Ultimate Design Wind Speed (3-second gust): V,,it = 110 mph
<br />Nominal Design Wind Speed: Vasd = 85 mph
<br />2. Risk Category: it
<br />3. Wind Exposure: B
<br />4. Internal Pressure Coefficient = +/- 0.18
<br />Additional Info:
<br />5. Topographic factor: Kn = 1.0
<br />6. Directionality factor: Kd = 0.85
<br />7. Enclosure classifcation: (partially enclosed)
<br />& Gust Effect Factor: G = 0.85
<br />9. Design Base shear:
<br />Retail Building
<br />V = 39.1 kips (E-W direction); 32.5 kips (N-S direction)
<br />Dumpster Enclosure
<br />V = 3.6 kips (E-W direction); 3.6 kips (N-S direction)
<br />10. Analysis procedure: (directional)
<br />LATERAL LOADS - EARTHQUAKE
<br />Numbering below is per IBC Section 1603.1.5:
<br />1. Risk Category: it
<br />2. Seismic Importance Factor: le = 1.0
<br />3. Mapped Spectral Response Acceleration Parameters: S, = 1.434 g; S1 = 0.550 g
<br />4. Site Class: D; FA = 1.0; Fv = 1.5
<br />5. Design Spectral Response Acceleration Parameters: SDs = 0.956 g; SDI = 0.550 g
<br />6. Seismic Design Category: D
<br />7. Basic Seismic Force -Resisting Systems:
<br />Retail Building
<br />Vertical Elements: Light -framed wood structural panels;
<br />Diaphragms: Light -framed wood structural panels;
<br />Dumpster Enclosure
<br />Vertical Elements Masonry cantilevered shear walls, -
<br />Diaphragms: Metal deck,
<br />8. Design Base Shear:
<br />Retail Building
<br />V = 21.3 kips (E-W direction); 21.3 kips (N-S direction)
<br />Dumpster Enclosure
<br />V = 7.9 kips (E-W direction); 7.9 kips (N-S direction)
<br />9. Seismic Response Coefficient:
<br />RetailBuilding
<br />Cs = 0.147
<br />Dumpster Enclosure
<br />Cs = 0.756
<br />10. Response Modification Coefficient:
<br />RetailBuilding
<br />R = 6.5
<br />Dumpster Enclosure
<br />R = 1.25
<br />11. Analysis Procedure: Equivalent Lateral Force Procedure
<br />t
<br />DESIGN DOCUMENTS
<br />Contractor shall verify all dimensions and all conditions at the job site, including building and site
<br />conditions before commencing work, and be responsible for same. All discrepancies shall be reported
<br />to the Architect before proceeding with work. Any errors, ambiguities and/or omissions in the contract
<br />documents shall be reported to the Architect immediately, in writing. No work is to be started before
<br />correction is made.
<br />Contractor shall verify and/or coordinate all dimensioned openings and slab edges shown on the
<br />contract documents. Some dimensions, openings and embedded items are shown on the structural
<br />drawings. Others may be required. Refer to architectural drawings for size and location of curbs,
<br />equipment pads, wall and floor openings, architectural treatment, embeds required for architectural
<br />items and dimensions. Refer to mechanical, plumbing, electrical and fire protection drawings for size
<br />and location of all openings for ducts, piping, conduits, etc. Submit openings to Architect for review.
<br />Do not scale drawings. Use only field verified dimensions. When electronic plan files are provided for
<br />the Contractor's detailing convenience, it shall be noted that the electronic files are not guaranteed to
<br />be dimensionally accurate. The Contractor uses them at their own risk. The published paper documents
<br />are the controlling Contract Documents. Electronic files of detail sheets and notes will not be provided.
<br />CONTRACTOR- INITIATED CHANGES
<br />Contractor -initiated changes shall be submitted in writing to the Architect for review and acceptance
<br />prior to fabrication or construction. Changes shown on shop drawings only will not satisfy this
<br />requirement.
<br />INSPECTIONS
<br />The Contractor shall coordinate with the building department for all building department required
<br />inspections.
<br />TEMPORARY SHORING AND BRACING
<br />The Contractor shall provide temporary bracing as required until all permanent connections and
<br />stiffening have been installed. The Contractor is responsible for the strength and stability of all partially
<br />completed structures including but not limited to concrete or masonry walls, steel framing and erection
<br />aids. The Contractor shall, at their discretion, employ the aid of a licensed Structural Engineer to design
<br />all temporary bracing and shoring necessary to complete the work described in these contract
<br />documents. The Contractor shall be responsible for all required safety standards, safety precautions and
<br />the methods, techniques, sequences or procedures required in performing their work. For concrete
<br />construction refer to ACI 318 - Section 26.11.2 "Removal of Formwork".
<br />SAFETY PROCEDURES
<br />Contractor shall be responsible for all safety precautions and the methods, techniques, sequences or
<br />procedures required to perform the contractor's work. The Structural Engineer has no overall
<br />supervisory authority or actual and/or direct responsibility for the specific working conditions at the site
<br />and/or for any hazards resulting from the actions of any trade contractor. The Structural Engineer has
<br />no duty to inspect, supervise, note, correct, or report any health or safety deficiencies to the Owner,
<br />Contractors, or other entities or persons at the project site.
<br />SHOP DRAWINGS AND SUBMITTALS
<br />SHOP DRAWING & SUBMITTAL REVIEW (including Deferred Structural Components)
<br />The contractor must review and stamp the shop drawings & submittals for review. SER will only review
<br />submittals for items shown on SER documents. Submittals for Deferred Structural Components will receive
<br />cursory review by SER for loads imposed on primary structure. SER will review shop drawings for general
<br />conformance with design concept of the project and general compliance with the information given in the
<br />Structural Contract Documents. Review of submittals does not constitute approval or acceptance of
<br />unauthorized deviation from Contract Documents.
<br />Corrections or comments made on shop drawings during this review do not relieve Contractor from
<br />compliance with the requirements of the plans and specifications.
<br />Contractor responsible for:
<br />• Reviewing, approving, stamping and signing submittals prior to submittal to Architect and SER
<br />• Timing submittals to allow two weeks of review time for the SER and time for corrections and/or
<br />resubmittal
<br />® Conformance to requirements of the Contract Documents
<br />• Dimensions and quantities
<br />• Verifying information to be confirmed or coordinated
<br />Information solely for fabrication, safety, means, methods, techniques and sequences of construction
<br />Coordination of all trades
<br />Resubmittals shall be clouded and dated for all changes to the submittal. Only clouded portions of
<br />resubmittal will be reviewed and SER's review stamp applies to only these areas.
<br />SUBSTITUTIONS
<br />Substitutions shall be submitted in writing prior to submittal of shop drawings. Shop drawings bearing
<br />substitutions will be rejected. Submit engineering data to substantiate the equivalence of the proposed
<br />items. The SER's basic services contract does not include review of substitutions that require re -
<br />engineering of the item or adjacent structure. Nor does the SER's contract cover excessive review of
<br />proposed substitutions. The fees for making these reviews and/or redesign shall be paid by the
<br />Contractor. Reviews and approvals shall not be made until authorization is received.
<br />SUBMITTALS
<br />Shop drawings and material submittals shall be submitted to the Architect and SER prior to any fabrication
<br />or construction for the following structural items. Submittals shall include one reproducible and one copy,
<br />reproducible will be marked and returned. If deviations, discrepancies, or conflicts between shop drawings
<br />submittals and the contract documents are discovered either prior to or after shop drawing submittals are
<br />processed by the SER, the Contract Documents control and shall be followed.
<br />• Concrete mix designs
<br />Reinforcing bar shop drawings and placing plans
<br />• Reinforcing bar mill certificates shall be available upon request
<br />• Non -shrink grout material specifications and manufacturer's installation recommendations
<br />• Structural steel registration/certification or quality control inspection records
<br />• Structural steel shop and erection drawings
<br />• Welding Procedure Specifications
<br />Glued laminated members (certificates shall be on site and be available upon request)
<br />• Deferred Structural Components listed below
<br />DEFERRED STRUCTURAL COMPONENTS
<br />Components referred to as Deferred Structural Components shall comply with these notes. These
<br />elements have not been permitted under the base building application. The Contractor will be required to
<br />submit the component system documents to the building official for approval. The documents shall be
<br />stamped and signed by an engineer licensed by the state where the project is located. The deferred
<br />structural components shall not be installed until the design and submittal documents have been
<br />approved by the building official.
<br />Prior to building department submittal, the deferred structural components submittals shall receive
<br />cursory review by SER for loads imposed on primary structure and general conformance with design
<br />concept of the project and general compliance with the information given in the Structural Contract
<br />Documents. Review of submittals does not constitute approval or acceptance of unauthorized deviation
<br />from Contract Documents. Submittals of contractor -designed components shall include the designing
<br />professional engineer's stamp and signature, as noted above. The submittal shall be approved by the
<br />component vendor prior to review by the SER. The designing professional is responsible for code
<br />conformance and all necessary connections not specifically called out on architectural or structural
<br />contract documents.
<br />Submittals shall include details of connections to primary structure that indicate magnitude and direction
<br />of all loads imposed at point of connection. Design criteria shall be provided with submittal and
<br />calculations shall be made available upon request.
<br />The following list includes the items that are defined as Deferred Structural Components. Refer to other
<br />discipline's contract documents for additional deferred components that may require structural design
<br />and details. Connections of these elements shall not induce torsion on structural members. Deferred
<br />Structural Components shall be manufactured, delivered, handled, stored, and field erected in
<br />conformance with instructions prepared by the component vendor.
<br />Deferred structural components:
<br />® Open web trusses
<br />Canopies, unless detailed on Contract Documents
<br />INSPECTIONS BY BUILDING OFFICIAL
<br />The building official, upon notification, shall make structural inspections as required by local ordinance
<br />The inspection by the building official per IBC Section 110 will be separate from and in addition to the
<br />special inspection and structural observation mentioned subsequently.
<br />SPECIAL INSPECTIONS
<br />A Special Inspector shall be hired by the owner to perform the following special inspections per IBC
<br />Section 1704. See the specifications for additional requirements for special inspection and testing. The
<br />architect, structural engineer, and building department shall be furnished with copies of all inspection
<br />reports and test results.
<br />See IBC Chapter 17: "Special Inspections and Tests" for more detailed requirements.
<br />SPECIAL INSPECTIONS AND TESTS OF SOILS (PER IBC •)
<br />Frequency
<br />Continuous
<br />Periodic
<br />1. VERIFY MATERIALS BELOW SHALLOW FOUNDATIONS ARE
<br />X
<br />ADEQUATE TO ACHIEVE THE DESIGN BEARING CAPACITY
<br />2. VERIFY THAT EXCAVATIONS ARE EXTENDED TO PROPER
<br />X
<br />DEPTH AND HAVE REACHED PROPER MATERIAL
<br />3. PERFORM CLASSIFICATION AND TESTING OF COMPACTED
<br />X
<br />FILL MATERIALS
<br />4. VERIFY USE OF PROPER MATERIALS, DENSITIES AND LIFT
<br />X
<br />THICKNESSES DURING PLACEMENT AND COMPACTION OF
<br />COMPACTED FILL
<br />5. PRIOR TO PLACEMENT OF COMPACTED FILL, OBSERVE
<br />X
<br />SUBGRADE AND VERIFY THAT SITE HAS BEEN PREPARED
<br />PROPERLY
<br />Frequency
<br />Verification and Inspection
<br />Reference
<br />Continuous
<br />Periodic
<br />1. INSPECT REINFORCEMENT AND VERIFY PLACEMENT
<br />X
<br />IBC 1908.4
<br />ACI 318:
<br />20, 25.2, 25.3,
<br />26.6.1-3
<br />2. INSPECTION OF ANCHORS CAST IN CONCRETE
<br />X
<br />ACI 318: 17.82
<br />3. INSPECTION OF ANCHORS POST -INSTALLED IN HARDENED
<br />CONCRETE MEMBERS:
<br />a. ADHESIVE ANCHORS INSTALLED IN HORIZONTALLY OR
<br />X
<br />ACI 318: 17.8.2.4
<br />UPWARDLY INCLINED ORIENTATIONS TO RESIST
<br />SUSTAINED TENSION LOADS
<br />b. MECHANICAL ANCHORS AND ADHESIVE ANCHORS
<br />X
<br />ACI 318: 17.8.2
<br />NOT DEFINED IN 4a
<br />4. VERIFYING USE OF REQUIRED DESIGN MIX
<br />X
<br />IBC 1904.1,
<br />1904.2, 1908.2,
<br />1908.3,
<br />ACI 318: CH. 19,
<br />26.4.3, 26.4.4
<br />5. PRIOR TO CONCRETE PLACEMENT, FABRICATE SPECIMENS
<br />X
<br />IBC 1908.10
<br />FOR STRENGTH TESTS, PERFORM SLUMP AND AIR
<br />ACI 318: 26.4,
<br />CONTENT TESTS, AND DETERMINE THE TEMPERATURE OF
<br />26.12
<br />THE CONCRETE
<br />ASTM C172, C31
<br />SEATTLE DCI
<br />DR 14-2014
<br />w�
<br />z z
<br />p
<br />>k
<br />r'
<br />i e
<br />-r
<br />_ as u
<br />` 11 OR
<br />A
<br />Verification and Inspection
<br />Reference
<br />Continuous Periodic
<br />INSPECTION OF FABRICATOR'S QUALITY CONTROL X IBC 17042-S
<br />PROCEDURES AISC 360-N2
<br />INSPECTION OF WELDING STRUCTURAL STEEL: AISC 360-N.5.4
<br />PER AISC 360 TABLES
<br />N5.4-1, -2, -3
<br />AISC 360-N.5.5
<br />AWS D1.1
<br />INSPECTION DURING THE PLACEMENT OF ANCHOR RODS X AISC 360-N.5.7
<br />AND OTHER EMBEDMENTS SUPPORTING STRUCTURAL
<br />STEEL
<br />fil
<br />REPORT & GENERAL CRITERIA
<br />Criteria outlined in the report listed below was used for the design of the foundations:
<br />NEW 7- 7 7 STORE EVERETT; WA
<br />prepared by SOUTHSOUND GEOTECHNICAL CONSULTING (SEPTEMBER 18, 2018)
<br />Contractor shall be familiar with recommendations in the above -mentioned report prior to start of
<br />construction. Allowable soil pressure and lateral earth pressure are assumed and therefore must be verified
<br />by a Geotechnical Inspector or the building official. If soils are found to be other than assumed, notify the
<br />Structural Engineer for possible foundation redesign. For wet weather work, see the Geotechnical Report.
<br />Unless noted otherwise, footings shall be centered below columns or walls
<br />INSPECTIONS
<br />All prepared soil -bearing surfaces shall be inspected by the owners Geotechnical Inspector (or building
<br />official) prior to placement of reinforcing steel and concrete. Inspections shall be made per IBC Table
<br />1705.6.
<br />BEARING VALUES
<br />All footings shall bear on undisturbed soil and shall be lowered to firm bearing if suitable soil is not found
<br />at elevations shown. Exterior footings shall bear a minimum of 18" below the finished ground surface.
<br />Footing elevations shown on plans (or in details) are minimum depths and for guidance only; the actual
<br />elevations of footings must be established by the Contractor in the field working with the Geotechnical
<br />Inspector.
<br />Allowable vertical bearing soil pressure = 2,500 psf
<br />Allowable lateral passive resistance = 300 psf/ft
<br />Allowable coefficient of friction = 0.35
<br />SUBGRADE PREPARATION
<br />Prepare subgrade per the Geotechnical Report, summarized as follows: All footings shall be cast on
<br />undisturbed firm natural soils that are free of organic materials. Footing excavation shall be free of loose
<br />soils, sloughs, debris and free of water at all times. If organic silt and/or fill material is encountered at
<br />subgrade elevations, overexcavate a minimum of 2'-0" below the design foundation subgrade elevation
<br />prior to placing footings. The overexcavated areas shall be backfilled with structural fill compacted to 95%
<br />proctor per ASTM D-1557 or a lean concrete mix.
<br />EXISTING UTILITIES
<br />The Contractor shall determine the location of all adjacent underground utilities prior to any excavation,
<br />shoring, pile driving, or pier drilling. Any utility information shown on the plans and details are approximate
<br />and not verified by the SER. Contractor is to provide protection of any utilities or underground structures
<br />during construction.
<br />DRAINAGE
<br />Drainage systems, including foundation, roof and surface drains, shall be installed as directed by the
<br />Geotechnical Report. Vapor retarder placed below slab -on -grade shall conform to ASTM E 1643 and ASTM
<br />E 745.
<br />S001
<br />STRUCTURAL GENERAL NOTES
<br />S002
<br />STRUCTURAL GENERAL NOTES
<br />S100
<br />FOUNDATION PLAN
<br />Silo
<br />ROOF FRAMING PLAN
<br />S301
<br />STRUCTURAL CONCRETE DETAILS
<br />S302
<br />STRUCTURAL CONCRETE DETAILS
<br />S401
<br />TRASH ENCLOSURE DETAILS
<br />S601
<br />STRUCTURAL WOOD DETAILS
<br />S602
<br />STRUCTURAL WOOD DETAILS
<br />S603
<br />STRUCTURAL WOOD DETAILS
<br />Engineer's Stamp
<br />Project Title
<br />Z
<br />0
<br />re
<br />LJJ
<br />I_
<br />Ln
<br />or'
<br />LU
<br />Project Information
<br />Project No.
<br />19-027-01
<br />Checked By OB
<br />Issue
<br />BID SET 03/13/2020
<br />Department Approval
<br />Sheet Title
<br />STRUCTUML
<br />Sheet Number
<br />
|