Laserfiche WebLink
2X6 SP #2 OR SPF #2 <br />I. <br />OR BETTER (TYP'i <br />(2)'16D COMMON TO <br />EACH STUD <br />SECTION C <br />N A <br />PE-R PLA <br />tAJATER HEATER <br />REF PLUMBING <br />DETAILS <br />N TANK EXPANSIO <br />EYPANSION TANK <br />FOR WATER HEATER <br />314i, PLWD. <br />SHELF ON 2 x 6 ---------- <br />F RAM I N G VlVj T <br />WALL COVERING <br />li <br />DRIP PAN <br />C <br />-- --------- - <br />ATO <br />— — - --- --- -- - - ---- --- -- <br />.... ..... ............ ... <br />REFERENCE <br />to I <br />PLUMBINGSHEETS <br />FOR FILTER AND <br />PUMP PLUNIBING --- --- <br />DETAILS <br />II <br />7ff, <br />LO(',,A"I_E I'VIOP <br />FIANGER <br />FIAT 899-CC) ON <br />ADJACIFE.NTWALL li <br />OVER MOP SINK <br />50" AFF <br />VvIALL SERVICE t <br />FAU CET <br />30" FIOSE AND <br />BRACKET <br />-CC) (FIAT,339 <br />MOP SINK REF <br />PLUMBING SHEETS <br />BASE AS - - - ------- <br />t <br />S CH E 1) U L E 1) <br />- --- ------- <br />'AlL WATEF? <br />F, <br />HEATER frivrIOP INK <br />s <br />3/4%, -0ii <br />S HATC11, <br />'Ei AN D <br />LED BY <br />RODECK OR <br />OF <br />FLOOR/CEILING <br />ASSEMBLY <br />--------- ---- . . . ...... <br />- - ------- ------------ ---- <br />Al- <br />'I*RACK PEP <br />M A N I, J F A TU RE R <br />J, <br />4" DEEP LEG <br />CAPTURE TRACK. <br />1/2'' GYP BOARD <br />ATTACHITO SIP <br />P�.TTA(,",, !ED TO TOP <br />_I'R,4-,CK0lNL_Y <br />PANEL. DO NOT <br />ATTACH TO STUD <br />e <br />lAjAL.L <br />I. <br />FINISH AS <br />3CHED' !-ED <br />MIETAL STUD <br />SPACER BAR NOT <br />MORETHAN 12" <br />FROM TOP OF STUD, <br />TO BE INSTALLED <br />PER MANU. SPECS <br />117 DETAIL -STUD P"LIP JOINT <br />IIETA.L STUD <br />N F I I iSFJ AS <br />S C, I I D U I.- E D <br />METAL RUNNER <br />r* -'IT WI -I 1-1/2'k).14" <br />Si IOT PIN AT 16" 0, C. <br />TO CONCRETE SLAB <br />WITH MIN, <br />USE IHILTI XU SERIES <br />ESR--2269 PINS <br />14 DIETAIL - PASE STUD CONNECTION <br />3' = V-0" <br />N T <br />U "E D <br />3 <br />5,8" GYP. BID, <br />TYPEW <br />Sim, <br />No -r" FE <br />Ul <br />RUNGS TO BE <br />c. <br />CAPABLE OF <br />Viv'I'll- H S TA. N DING <br />A '00 AD <br />LB LO <br />SUSPENC E'D <br />Lu <br />> <br />3' -.0C[ <br />" EAR <br />CEILING <br />ry. <br />WRAP 2";/8' <br />CYP Bl�_ IYP�­ <br />W, A RO U N L') <br />BUI Kl iEAD <br />2X BLOCKING A <br />01 <br />SIUPPOR TS <br />F N E D <br />AS "' <br />0- <br />5/'IF)"x2" BOLTS <br />R 0 0 F A C CE �S­S <br />1-AG <br />LADDER SUPPLIED <br />BY LANDLOPD <br />lNSTALLED BY Gc <br />wi i <br />I /2'ix3" EX PANSION <br />T <br />C <br />BOLT EA` H LEG <br />C" <br />TOP OF FINISH <br />FLOOR <br />-- <br />--- ------------ --........... ------_--- <br />.............. <br />.......... <br />�c ION <br />r,(fb <br />R('-)(,) F <br />LAUL)" R <br />N 1, <br />E <br />D Z5 <br />5 <br />3/4" 0" <br />N.T, <br />Pi <br />11 c <br />_t: <br />Fi <br />CONTINUOUS <br />INTERIOR NON -LOAD BEARING PARTITION HEADER SCHEDULE <br />SEALANI EACH SIDE <br />DOOR FRAME JAMB <br />i HEADER <br />HEADER <br />MINIMUM EFFECTIVE <br />ANCHORS, MIN. 3 <br />PER JAMB <br />LENGTH <br />MEMBERS <br />PROPE <br />_RTIES PER STUD <br />METAL FRAME <br />2' TO 6' <br />() 3'' x 18GAUGE <br />"2 <br />Ix = 2.042 Sx = 0.670 <br />HOLLOW METAL <br />6' TO 8' <br />(2) 6" x 16GAUGE <br />Ix - 2-5118 Sx = 0,839 <br />DOOR AS <br />8' TO 101 <br />2) 6" x 14 GAUGE <br />Ix = 3,094 Sx = 1,031 <br />SCHEDULED <br />10' TO 12' <br />(2) 8" x 18 GAUGE <br />Ix = 4.134 Sx = 1.033 <br />REFERENCE A6.0 <br />i 12' TO 14 <br />(2) 81' x 16 GAUGE <br />Ix — 5.110 Sx = 1.277 <br />14` TO 161 <br />(2) 3" x 14 GAUGE <br />Ix 6.303 Sx = 1.576 <br />16' TO 18' <br />'2) 10" x 14 GAUGE <br />Ix 12,325 Sx = 2.456 <br />DETAIL INTERIOR <br />DOOR JAMB HEAD <br />18TO 26i <br />(2) 12" x 16 GAUGE <br />Ix 15.7"30 Sx = 2.334 <br />16 <br />3' = V-0" <br />MIN 1 <br />j REQUIRED GAP PER <br />MANUFACTURER <br />ILL FINISH <br />EXTEND WIN FI <br />AS SCHEDULED V <br />MIN. TYP. <br />COOLER W/\LL PER <br />. .. . ....... <br />MANUFACTURER <br />ADJACENT WALL <br />........... ................ --- -------- --------- ---- <br />SEALANT <br />S.S. SCREW @ Z <br />O.C. AND COUNTER <br />T_ <br />SUNK 3" <br />-16 GA Q.S. 2:'x3" <br />CONT. ANGI E VV/ <br />SEALANT, TYP. <br />-413 DETAIL - CLOSURE STRIP <br />8 NOT USED <br />N.I.S. <br />DX FOR SECURITY <br />,MERA & MONITOR <br />DATA CABLES. <br />IONITOR IN STORE <br />FROM UNISTRUT <br />BOTTOM CHORD IUI'q I U DL- Ur 1 LnMMMU D y <br />OF BAR JOIST CONSTRUCTION MANAGER- <br />QDA-VFT QV <br />A <br />DETAIL - HEADER <br />2 1 1/237 = T-0" <br />7 NOT USED <br />N.'-[-. S, <br />- - -- -------- ------ -- ------- ---- - <br />NOTE: 1 <br />QQ TO PROVIDE 3/4" CONDUIT FROM CAINIERA I <br />-ION OF CAMERA SUPPORT BY G.C. <br />OFFICE. INSTALI, -Al <br />..... ......................... ........... <br />STEEL BAR JOIST <br />PROVIDE P3300 UNISTRUT OR EQUAL <br />LENGTH AS REQUII-_El) TO'SPAN <br />JOISTS. SECURE TOBOTTOM CI IORD <br />OF BAR JOIST. LOCATE VOFF EXTERIOR WALL. <br />BOTTOM CHORD <br />INSET OF BAR JOIST <br />SECURITY CAMERA MOUNTING <br />2 <br />N.T,S. <br />METAL STUD <br />HEADER <br />PC 18 GA TRACK <br />WITH (3) #10 TEK <br />SCREWS EACH SIDE <br />TO HEADER AND (6) <br />#'I OTEK SCREWS TO <br />JAMB <br />-- METAL STUD JAMB <br />4"X4" J-BOX <br />FOR CAMERA. <br />. .. CAMERA IN STORE <br />MOUNTED TO UNISTRUT. <br />CENTER CAMERA ABOVE <br />DOOR <br />N.T.S, <br />JL <br />SECTION B <br />VARIES <br />SECTION A <br />BOX BEAM <br />. .......... <br />PC 18 GA TRACK <br />DOUBLE MTL STUD <br />ATJAM BS <br />METAL STUD <br />A . ..... BOTTOM TRACK <br />TOP TRACK <br />2 STUD HEADERS <br />FINISH AS <br />INDICATED <br />. ... ... BATT INSULATION <br />BOTTOM TRACK <br />CEILING TEES <br />--CAMERA IN STORE <br />MOUNTED TO <br />CEILING TEE. <br />SECURITY. CAMERA MOUNTING <br />N.T.S. <br />SECTION B <br />VARIES <br />SECTION A <br />BOX BEAM <br />. .......... <br />PC 18 GA TRACK <br />DOUBLE MTL STUD <br />ATJAM BS <br />METAL STUD <br />A . ..... BOTTOM TRACK <br />TOP TRACK <br />2 STUD HEADERS <br />FINISH AS <br />INDICATED <br />. ... ... BATT INSULATION <br />BOTTOM TRACK <br />CEILING TEES <br />--CAMERA IN STORE <br />MOUNTED TO <br />CEILING TEE. <br />SECURITY. CAMERA MOUNTING <br />N.T.S. <br />