Laserfiche WebLink
PLUMBING SPECIFICATIONS <br />INTRODUCTION <br />1A THE CONTRACTING FOR INSTALLATION OF PLUMBING SYSTEMS WILL BE AC COI`AI P L! �_31 _1 E� D 1�11NI FHE <br />IFIELD ATTF-iE DIVISION LEVEL (IN(DASE OF A CONFLIC-I BETIOJEEN TI-IIS SPECIFICA_f�ON AND -1-11 ii": CONTRACT <br />DOCUMENTS AND/OR',.AJRH­TEN OR VERBAL INSTRUCTIONS PROVIDED BY THE COW3__FR1JkC­1I ION` NIANAGEER, <br />T HIE:: DIVISION'S INSTRUCTIONS SHIALL PREVAIL). "FIEREAFTEER IN TI-11S SPECIFICATION, TFI`1,___ �v`V`ORD "iPLUIVIBlIliC, <br />CONTRACTOR" SHALL REFER TO THE INSTALLING PLUMBING CONTRACTOR AND`0,,f'1NE__`F,` Q'i-IAII-L R'ERER J-0 <br />7-ELEVEN. REFER 'TO Sid EET'DOW'FOR RESPONSIBLE PROVIDERS. <br />12 SCOPE OF WORK <br />12.1 PLUMBING CONTRACTOR SHALL FURNISH AND INSTALL PLUMBING FIXTWRESS, <br />A,NID) ATTENIDANT PIPING AS STATED HEREIN. REFER -f-OTI-iE PLUMBING FLANIS AND `Fi`�E "I"JIIA-f E,1­,IA1,­,,` <br />PORTION OF THIS SP CIFICATION FOR EQUIPMENT TO BE IF-URMSFIED. E'XACT LOCAT!CIN 0`11'_^ ALL EOUIPN;rl�,ENT <br />SHAU BE� DETERMINED BY REFERENCE TO THE PLANS AiNID MEASUREMENTS ATTHE Bi.j`IJDIN'1_3 `51-1-EAND <br />COOPERATION WITH OT HER CONTRACTORS AND IN ALL CASES SHIALL BE SUBJEECT OWNIPRS <br />APPROVAL. <br />GENERAL <br />13A ALI SAFETY PRECAUTIONS SHALL BE1_AKEN TO AND <br />EQUIPMENT. <br />M� <br />1.3.2 N 0 C 0 M P E N S A T 10 N F 0 R VVO R K E R F 0 R M, 'E. I-) OV E'. R A N D A B 0" E P R E r", 1­ 8, i, 1',�,Al S, ALL B E <br />Al LOVVED DUE 70 CONDITIONS WITH"kAll 11CI-1 1 <br />1,3�3 ANY DEVIATION BY PLUMB!M3� CONFFRACTOR IFROM 1'HE I"LANS ANE-) SP-'_ OR <br />I 'J <br />ANY SUBSTITUTION OF EQUIPMENT FROM THAT SPECIFIED, S;--IALL FIRST RECEIVE W11VAL. <br />1.4 OPERATIONS AND INSTAILLA'TION <br />ALL DELIVERIES TO COINCIDE WITH CONSTRt CTION SCHEDUI E. INlAIERI LS, HALI BE: <br />J <br />STORED'Od"FiERE AND/OR AS ID I R E(.,'T_E_ 1) BY THE GE--NERAL, CONTRA".'C'TOR. STORAGIE M!1JS,_F I' IF IN SUCI I A <br />PLACE AS TO AVOID ACCIDENTAL MUT11 ATION BY EQUIPMEENT BY ANY CONTRACTC R Vv"HII I F-�FRFORNIING <br />Vf[-iE­I'_HER ON SITE OR OFF'. <br />1A.2 ALI- UNDER FLOOR PIPING SHALL BE iNSTALLIFED <br />CON'TRACTOR'S WORK SC11EDULE. NO UNDERG�ROUND`AIORK SHALL BE- COVERvE"I-i (A'ITHL, 11 <br />HAS BEEN INSPECTED AND TESTED. <br />7 <br />1.43 PLUIMBING CONTRACTOR SHALL DO THE 1',11ECESSARY TRE_NG�HING, SHORIINP--i !M D <br />BACKFI LLING REQUIREID TO f:ULFILL HIS CONTRACT. BOT-11 OMS OF TRIE -_ NCHES SHAI-1. 1FIE C'LIT 1"") GR,,6,D!E_,1 <br />1A.4 ALL OPENINGS AND STUB -UP FOR PLUMBING PIPING AND FIXTURES �.'__�AREFULLY <br />LOCA-1 ED AND COORDINATED, OTHERWISE, PLUMBING CONTRACTOR SHALL CU"T NEW 0i E�_-NINGS Al HIS <br />OWN EXPENSE, AND REHABURSEE OTHER SUBCONT RACTORS FOR ANY DAM�A"3"E DONE 11-0 ­T-1-PiR Vv',`DRK, <br />t5 COD'E.AND PERMITREQUIRELEMENTIS <br />1,51 ALLVVORK SHALL. BE PERFORMED IN ACCORDANCEWITH APPLICABLE LOC.""AL LANVS, <br />REGULATIO'NS, ORDINANCES, STATUTIES, AND CODES, WHICH SHALL B31E DELINEATED. AND ALL <br />, AODIFICAT IONS REQUIRED BY THE INSPECTION AUTHORITIES SHALL BE MADE BYPLI <br />WITI-IOU'FADDITIONAL COST TO OWNER� <br />1.5�2 PLUMBING CONTRACTOR SHALL. OBTAINI, PAY FOR AND FURNISH ALAL By <br />LOCAL ORST TE ORDINANCES OR CODES. AND THESE COSTS SIFIALL BE STA1 ED SEP" RAT -PLY ON Tj_j�_ <br />,1A <br />PLUMBING CONTRACTOR�S INVOICES. <br />2, <br />2A DOMESTIC 'WATER PIPING <br />2. 1 � 1 A B 0 V E= A N D B E L 0 \A1 G R A D E WA"FE R P 1 P I N G S HI A L L IB E P E X, T U B I N G C-0 NIF" 0 Ir,,1 G - F 0 A S'T 1' <br />F877 CROSS -LINKED POLYETHYLENE TUBING IHOT AND COLD WATER DISTRIBUTION SYS-1 EIAPVIS, A,�.-3T.fvll `_i'376 <br />1C,ROSS-LINKED POLYETHYLENE TUB;E-, ASTMI F11 807 FlIFTING AND ASTN1 F-2 15c) FTIFTINGE3, GOI�,JIPLY Vyl] NSF <br />STANDARD 14 AND 61, AND COMPLY \1\11TH AS'TM �EE84 AND CAN./ULC S102.2. <br />V,,jA,TERPEX CROSS -LINKED POLYETHYLENE OR EQUAL. ALL PEX _rUBING BELOW BE �'�'-dLEE'VED <br />WITH PVC PIPE. 2. 1.1.1 FITTINGS: FIT] 1NGS SHALL BE ME:'C'FIANICAL CRIMP Fj'TTII\1GS IN W11 <br />ASTiNl E1807 AND F2159, PEX FITTINGS SHALL BE WATTS BRASS ("'RIN1PRING FITITINGS tJ,SiNK_�J E-, I _1 -H E_ VIJ/'�,_TlTci <br />C'O P P E R C R I M P RI NG OR STAI N L ESS STE EL. C 1 N CI -iC LANil P 0 R EQUAL. I NS T'ALLEIC) 5 N Ar C OR IDANC E V1,0`1 I <br />VvIIANUFACTURER'S RECOMMENDATIONS. <br />11.2 ABOVE AND BELOWkr7_'RAEJE`1fVA_FE:R PIPING SHALL BE-1YIPE"L." AND11,11" 1-IA,'r_-',f_-, <br />SEAMLESS-3 COPPER TUBiNG CONFORMING -TO AE31'M [388� <br />2,11.2.1 COPPER UNIONS: %'.AST-COPPC-7R-.AL.LOY,'�-iEXAGONAL--STOCi,�,B,,-.'���.',-')'�-,-'� �,P.ATH Bf%1LL-AND- <br />SOCKET, METAL -TO -METAL SEATING SURFACE AND MATERLAL S: �ALI_ ', E AsrM 1381,� <br />'vVATER-FLUSHABLE, LECAD-FREE FLUX ALLOY SOLDER. <br />2.2 FILTERED%A,1'A­fER PIPING <br />2.2.1 ABOVEAND BELOW GRADE FILTERED WATIER PIPING SHALL BE CPVC'� CONFORMING <br />TO ASTIM D2846 AND CSA B137 CHLORINATED POLY (VINYL CI-ILORIDE) P11_ASTICI­-:K)'1 A1`,,'E-)G0LD WAJi__J-,-,,, <br />DISTRIBUTION SYSTEMS, ASTM D1784 RIGID AND CHLORINATED PVC COMP,_,)UNDs, A�s_TNfi F_419'3 SOLVI­ NT <br />�j <br />C" E: M EN TS, COM PLY'AfFI-Id NS F S TAN DARD 14 AN D 6 1, AN D COM P Ly WITH ASTM E84 /1 N CA INII. ULC S, 1 02 . 2 <br />CPVC TUBING SI-IALL BE FLOVJGUARD GOLD CPVC CTS OR EQUAL. <br />2 L: 's i L <br />11-.2.1,11 FITTINGS'. FITTINGS SHALL BE SOCKET TYPE- 10INTS IN CID'M�F'LIA�dr­ V11H AS 11MI <br />D28,11GAND CSA B137, CPVC FITTINGS SIAALL BEEFLO",A]GLIARD GOLD CPVC CTS FITTINGS OR EQUAL. <br />JOINING MATERIAL. SHALL BE ASTIMIF493 SOLVE".NIF CEMENT. INSTALLED IN ACCOi_,1,I_'ANC`.E VM-1 H <br />RECO'NIME�NDATiONS. <br />,VAN U FACTU RiE - - <br />2.3 SOIL, "AfASTEE AND VENT PIPES <br />2.3.11 ABOVE AND BELOW Gf ADE SO!L, WAS-IfE AND VENT PIPIN(3 SI-1ALL BE P1 p <br />SCF1EDULE- 40 DWV PIPE CONFORIVIIING TO ASTMI D2665 WITH PLAIN ENDS. CE_LLI_JI_j",R (i <br />ALLOWED. INSTALL PER ASTM E)2665 AND ASTM f)232`1, <br />E TYPE Dkillf", PiPEFIT-1 1J`\IG11:.'11_ P,,STfv1 D266E, `\4ADE <br />M <br />2 <br />�.3,1.1 FITTINGS SHALLBEPVC SOCKET- <br />ASTIP01 D343111 DRAIN, WASTE AND VENT PAI <br />�11 1 2,33. 2 ABOVE AND BELOW GRADE SOIL. V,.1ASTEE AND VENT PIPING SHIAL], E3E rA'--'-f <br />CD <br />!RON SOIL PIPE AND FITTINGS CONFORMING TO ASTM A74 WITH ASTIA C564 RUB,,"�'E'R GASXf__­_1 S, INE,,TFAILL <br />0 C I S P I � S " CAS -1 - 1 RO N S 0 1 L P I P E A N D F I T1 1 N G S H A NJ I-) B Oi') I-,, C 1' IIA, F'T E R <br />GAS' -IRON SOIL PIPING ACCORDING I <br />IV, "INSTALLATION OF CAST !RON SOIL PIPE AND FI'TTINGS." <br />L AND VENT PIPINIGS"HALL BE ALLOWED � 1) BE C'(113PP�:7R Ed AINAGE <br />2.3.13ABOVE GRADE SOIi , VJAS'TI­_ T,' El R <br />TUBING CONFORMING T 0 ASTM B306 AT PLUMBING CONTRACTOR'S OPTION, <br />2.4 FLASHING'. SNEET LEAD. 4 POUNDS PIER 'SQUARE FOOT, MINIMUM. <br />2.5 INSULATION <br />2,5.1 DOMESTIC COLD WATE'R ('VOT HiN BUILDING): <br />COPPER PIPE: 1,7' WALL. ONE- PI ECE F1 BE RGLA&S, COVERING HAVING A C.C11NDIJ1C1TIVFI_Y NOT <br />EXCEEDING 0.27'AlITH FIRE RESISTANT jACKET\AJITH SELF-SEALINGLAP TO' PROVIDE A CONTHINIJOUS <br />VAPOR BARRIER BY CERTAiNTEED, ONAIENS-CORNING OR ARMSTRONG, f'SEj7__ B`FLO�J`,! FOR PLUMBING' f"I_'FPN1G' <br />INSULATION REQUIREMENTS' <br />PEX TUBING: IN C L! 11MIATES WFIERE TEMPERATURES CAN DROP BEL.C)W FREEZ'HNIG (0"C, <br />­2'F) INSTALL 1/2" \AIALL. ONE-PIE,CE F71BERGLASS COVERING HAVING A("'ONDUC-171VITY IN�01_ E_'1'-�CE__EJ_)ING C-).27 <br />'WITI-i FIRE_ RESISTANT JACKETVIJITH SLE117-SEALING LAP -1-0 PROVIDE A CONT11NeUOIYS VAP`1_31-__,� BY <br />CERTAINTEEED, OW'ENS-CORNING OR ARMSTRONG. (SEE BELOW FOR PLUrVIBiNG:1 FFI`­I­Hr41f_-' IGN <br />REQUIRE. 1_-N'1 <br />EXCEPTION: FOR NON-R�7r'IRCUI - ATING HOT�AIATIP_R SYSTEIM!, PROVIDE '1�19"WAIA_ ('ANIE-PIECE <br />e FIBERGLASS COVERING HIAVING A SON �ITIVITY NOT E/XCEE'DING 0.27 WITH FIRE'' I--, IS JAC""KEl- �Aj­f­ <br />_1 DUr, <br />SEELF-SEALING LAP TO PROVIDE A CONTINUOUS VAPOR BARRIEER BY CERTAIWIFEP�D, OF), <br />V1, R 0 N G 0 N T 11 E F R S T 8 F E E-T (DIF I N L E__ T P I P I N G �AIA,_ R HE ATE R. <br />A Rf�,./iS I <br />C-D <br />U-1 <br />CPVC -_RJBING: INI CLIMATES \A,1HERF TEMPEDATURES CAN DROP BELOW FREEZING (O'C <br />32-F) INSTALL 1/2­v`vALL. ONE-PiECE FIBERGLASS COVERING HAVING A CONDUCTIVITY NOT EXCE[EDING 0.27 <br />r <br />VATH FIRE RESISTANT jACIKET WITH SELF-SEALING LAP TO PROVIDE A CONTINUOUS VAPOR BARRIER BY <br />CERTAiNJEED, OWIENS-CORNING OR ARMSTRONG. `SEE BELOW FOR PLUMBING FITTING INSULATION <br />R E Q U I R E I VIE N -1 S). <br />2�5.2 ID 0 M E ST I C I 10 T WAl R <br />COPPER PIPE. 1/2."'vNIALL ONE-PIECE FIBERGLASS COVERING HAVING A CONDUC-FIVITY NOT <br />EXCEEDING 0.27VYITH FIRE RE___SISTANTJA11_1'KET WITH SELF-SEALING LAP TO PROVIDE A CONTINUOUS <br />VAPOR BARRIER BY CERIFAIN-FEED, O'kAjENS-CORNING OR ARMSTRONG, (SEE BELOW FOR PLUMBING FITTING <br />INSULATION RIE QUIREMENTS) <br />PPXTUBING: 1/2"\AIALL ONE-PIECE FIBERGLASS COVERING HAVING ACONDUCTIVITY NOT - <br />EXCEEDING 0.27,,f,j1jTH RESISTANTJACKET WITH SELF -SEA' INGIAP TO PROVIDE A CONTINUOUS <br />LI L <br />VAPOR BARRIER BY CE.RTAINTEED, OWENS-'C'ORNING (DR ARMSTRONG, (SEE BELOW FOR PLUMBING FITTING <br />INSULATION REQUIREMENTS) <br />FOR HOTIAIATER PIPING BEING SERVED BY SYSTEM VVITF-I RECIRCULATING PUMP, PROVIDE: I" <br />LL (DNE-PIECE FIBERGLASS COVERING HAVINGACONDUCTIVITY NOT EXCEEDING 0.27 VVITH FIRE <br />LAP 10 PROVII.AE..'A CONTINUOUS VAPOR BARRIER BY <br />CERTAI NTEEED, C)'v'v'F_NS-COR11N ING OR ARMSTRONG. (SEE BELOW FOR PLUMBING FITTING INSULATION <br />RIEE.QUIREMENTS) <br />2.5.3 INDIRECT AND CONDENSATE DRAIN PIP!NG OUVITHiN BUILDING): <br />­0 P P El <br />R PIPE: PROVIDE 1" FLEXIBLE UMCFLLULAR INSULATION BY ARMACELL. <br />PVC"' PIPING� NO iNSUI ATION REQUIRED. <br />FOR PIPING Al HANGERS, PROVID)E 8" LONG SECTIONS OF HIGH DENSITY, HIGH TEMPERATURE CALCIUM <br />SILICATE BY JOI-INS-MANVILLE, FIBERGLASS BY KNAUF, OR 8" LONG STYROFOAM BILLETS BY DOW. <br />INSULATION SHALL BEC'ONTINUIOUS ALONG THE PIPE SURFACE, EXCEPT AT VALVES, UNIONS, AND WHERE <br />PIPING IS E-I^XPO�'SED AT FIXTUME_�_S. <br />FOR HOT ANDC'OLA) WATER PIPING EXPO'SED, CONCEALE:D IWVVALLS, AND/OR IN87ALLED INSIDE MASONRY <br />UNITS OF',A;f',,LLS. COVE_-R FITTINGS WITH ZESTON, KNAUF, OR EQUAL ONE-PIECE PVC PREMOLDED <br />INSIULAIFING COVERS. FITTING COVERS, JACKETS AND ADHE-SIVES SHALL NOT EXCEED FLAME SPREAD <br />RATING OF 25 AND SMOKE DEEVELOPMENT RATING OF11 50 PER ASTM E84. AT ALL ELBOWS AND TEES, FILL <br />VOIDS BETWEEN COV1. RS AND PIPING WITH FIBERGLASS INSULATION AND TAPEJOINTS. INSTALL PIPE <br />INSULATION IN COfAIIPLIANCEII WITH MANUFACTURER�S REECOMMENDATIONS, WI-IERE PREMOLDED <br />INSULATING FITTINICSS ARE NOT APPROVED BY LOCAL AUTHORITIES, MITER INSULATION ATFITTINGS. <br />2,6 INDIRECT MND CONDENSATE DRAIN LINE& <br />PROVIDE HARD DRAWN, TYPIE"M" OR "L` COPPER PIPE FOR ALL CONDENSATE DRAIN PIPING FROM COOLER <br />ANDFREEZER EVAPORATORS. PROVIDE IlEAT FRACE FOR ALL CONDENSATE DRAIN PIPING LOCATED IN <br />FREEZER,��'i, AND ROUTE I-OFLOOR DRAIN IN BUILD DING. <br />PROVIDE PVC PIPE FOR Al L OTHER INDIRIE'C'T AND 'CONDENSA-FE DRAIN PIPING FROM HVAC, PLUMBING, AND <br />BEVERAGIE­, E'QUIPM';`NT. AND) ROUTETO IFI-C)OR DRAIN IN BUILDING. <br />3, TESTING AND INSPECTIONi <br />THEENTIRE PLUMBING SYSTEM SHALL. BE TESTED BEFORE COVERING13 OR ENCLOSING. <br />3.2 INSPECTION: TIONS ANt ADHERENCE <br />W <br />\ ORKSPIALL BE INSPE__,.CI"ED FOR ('OM`iL.IANCEWITH CODES, ORDINANCE I S, REGULA D <br />TO CONTRAr'T DOCUMENTS. PLUMBING CONTRACTOR SHALL SUPPLY OWNERWiTH SIGNED FORMS OR <br />PROOF OF ACC EPTANCE BY THHE LOCAL AUTHORITY BEFORE CONTINUING FROiM ONE STAGETO ANOTHER, <br />FINAL A." PROVAL S11ALL BE OBTAINED BEFORE- FINAL. PAYMEN-1- IS MADE C )N THE CONTRACT.\ <br />33 PERFORMANCE RE'QUIRED: <br />PLUMBING CONTRACTOR SHALL INSTAI L ALL PLUMBING SYSTEMS LEAK FREE AND AS <br />3. 3. `1 <br />PER PLANS AND SPECIFICATIONS. <br />-3.2 ALL EXPOSED EQUIPMENT SHALL BE INSTALLELE) IN A WORKMANLIKE MANNER AND <br />'T TC1 ARCF _URAJ INSPECTION FOR AESTHETIC APPEARANCE. <br />001 BE SUBJ" 'ITECI <br />4. CUTTINIG) AND CLE-ANING: <br />4. PLUMBING C"ON"FRACTOR SHALL CLEAN ENTIRE SITE OF DE,BRIS, TOOLS AND EQUIPMIENT <br />-I <br />RELATED TO THIS WORK. <br />4, 2 PLUMBING CONTRACT OR SHAI L BE RESPONSIBLE FOR ALI11 CUTTING AND PATCHING OF H's <br />V,,jORK'V`,,!I_1 I C H MAY BE R EQU I R E D TO RELI EVE TH E WORK OF OTHER CON RACTORS. <br />5. G U AiR A N _11E: E7_.. S � 1 <br />5.1 PLUMBING CONTRACTOR SHAL.L GUARANTEE ALL OF THE WORK AND THE COMPLETE <br />OPERATION WILL BE FREE FROM DEFECTS IN WORKMANSHIP AND MATERiALS, PLUMBING CONTRACTOR <br />AGREES TO REPLACE, WITHOUT EXPENSE _1_0 THE OVVNER; ANY PART OF HIS WORK ON THIS INSTALLATION <br />WH 1CH, 'DROVES -10 BE DEFEDC'TIVE `v`,jITI--i I N ON E (1) YEAR AIFJ ER ACCEPTANCE OF TH E WORK. <br />11 <br />R E V 0 3 / 0 3 ""1 t: <br />CONTF <br />IVIODU <br />LAV .13HR"DUn <br />`I-) L's <br />j <br />ASSE 1013 COMPLIANT <br />CASH ACME RP200 RPZ <br />BACKFLOW PREVENTER, <br />DO NOT MOUNT HIGHER <br />THAN 6-0" <br />Xc� <br />V SUPPLY <br />13'Y-STRAINER <br />Z�C� <br />ROUTE DISCHARGE <br />TO AN APPROVED <br />RECEPTOR <br />LL <br />Q0 <br />,31/4" FLEXIBLE <br />TUBING 10 FT <br />REQUIRED <br />3/4" BALLVALVE <br />SETSURGE <br />TANK ON <br />SHEI F <br />3/41�' <br />BY-PASS <br />----- ------- - ---- ­­1 ------- ------------ <br />­U <br />I � - r*H vvrz <br />i --�. F1:1 <br />COARSE <br />FILTER <br />3.4 <br />PLUG <br />SS -IMF <br />PRESSURE <br />REDUCING SS -IMF <br />VALVE. <br />U, <br />0 <br />0 <br />0 <br />1� REF NOTE <br />#8 BELOW <br />0 <br />'LL <br />01 <br />0 <br />0 <br />SPRING -LOADED <br />I <br />`T <br />LL <br />`IF <br />LL <br />-11 <br />U. <br />15t <br />CHECKVALVE <br />1:1 <br />REF. I/P1.1 <br />FOR ROUTING <br />DIAGRAM <br />ROUTE OVER FLOW TO AN <br />APPROVED RECEPTOR <br />CPVC BEVERAGE TUBING <br />TAG SLURPEE <br />314" REINFORCED PLASTIC LINE TO <br />SLURPEE/LEMCNADE ABOVE CEILING. PROVIDE <br />CHEC" E. 9,Ri��_.I�-A BE 1022 <br />C <br />_SLURPEE/LEMONADE REQUIRE <br />5155 PSI =\NATER PRESSURE- C <br />Ap_ <br />3/4" REINFORCED PLASTIC LINE TO <br />POST MIX ABOVE CEILING. PROVIDE BACKFLOW <br />PREVENTER RPZ-3. <br />TAG POST MIX <br />1/2" LINETO ICE MAKER ABOVE CEILING. PROVIDE <br />CHECK VALVE CONFORMING TO ASSE 1022 <br />TAG ICE MAKER <br />-REGULATOR @ ICE MAKER <br />TO < 60 PSI - <br />TAG COFFEE <br />3/4" LINE TO COFFEE, TEA, CAPPUCCINO <br />MACHINES. PROVIDE CHECK VALVE <br />CONFORMING TO ASSE 1022 <br />SHUT OFF VALVE (TYP..) <br />314` LINE SPLITS INTO 1/2" LINES WITH <br />SHUT OFF VALVES AT EACH COFFEE AND <br />TEA BREWER AND CAPPUCCINO MACHINE. <br />ZL <br />I CONTRACTOR SHALL VERIFY WATER <br />PRESSURE AT BEVERAGE EQUIPMENT IS <br />SUFFICIENT FOR OPTIMAL. OPERATION <br />AND NOTIFY ARCHITECT IMMEDIATELY <br />WITH ANY INADEQUACIES. <br />w <br />(n <br />W <br />U) <br />W <br />w <br />Uj <br />Uj <br />— <br />> <br />w <br />— <br />> <br />w <br />�; <br />w <br />w <br />(n <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />m <br />m <br />m <br />m <br />m <br />C) <br />0 <br />0 <br />cr) <br />CD <br />0 <br />w <br />0 <br />w <br />0 <br />Lo 10-23-2019 <br />� OT <br />6050 - <br />RIGHT <br />< <br />i: <br />Cf) <br />_j <br />0) <br />z <br />Z <br />L0 <br />C) <br />0 <br />4) <br />LLJ <br />C) <br />z <br />0 <br />> <br />(D <br />w <br />IT— <br />w <br />z <br />..0 <br />-6 <br />c) <br />w <br />LLJ <br />0 <br />:D <br />w <br />_j <br />LO <br />1�_ <br />C: <br />Cu"'FFEE RELATED EQUIPMENT ON 3/4" FILTER LINE: <br />FILTER SYS-11TEM MC)"DEL REQUIREMENTS FOR COFFEE RELATED EQUIPMENT: <br />F-E.-N-TA-IF EY-ER P.0 �RE -------- - ------ --- -- --- .......... ---------- ­ Im II <br />1. THE PLUMBING LINE AFTER THE PENTAIR HIGH FLOW QUAD FILTER SYSTEM SHOULD BE INCREASED TO <br />1. WATER SUPPLY MUST BE 3/4" INCH. Ys"FROM SYSTEM TO THE POINT OF THE WATER EQUIPMENT, Lm <br />2, PLACE THE MELITTA BEAN TO CUP MACHINE AT THE FIRST POINT OF USAGE ON THE PLUMBING LINE FEEDING <br />2. WATER SHUT-OFF VALVE SHALL BE "BALL LOCK" TYPE. POSITIVE ON -OFF. THE EQUIPMENT TO INSURE ADEQUATE FLOWS RATES, <br />1 FILTERED WATER LINE TO COFFEE iiELATED EQUIPMENT IS IN THE FOLLOWING ORDER OF CONNECTION: <br />3. DRAIN MUST BE PROVIDED TO PERMIT FL.USHING OF NEW FILTERS. 1. MELITTA BEAN TO CUP <br />4. WATER FOR ICE MAKERS, COFFEE MAKERS, AND CAPPUCCINO MACF-IINES Sj__j A J.'L BE ROUTED TT11ROU`­H TI iE SS -IMF UNITS. 2� FRANKE BEAN TO CUP <br />3. CURTIS CAPPUCCINO <br />5. WATER FOR FSD AND FCB EQUIPMENT SHOULD NOT BE ROUTED THROUGI-1 THE SS. -IMF UNITS (WILL REDUCE CARBONATION). 4� BUNN NITRO <br />5. BUNN COFFEE BREWERS <br />6, 4FC OR 7FC (CARBON' FILTERS MUST BE REPLACED IN SETS AS REQUIRED BASED ON GALLONAGE. <br />6. LANCER ICED TEA <br />4, AT THE TIME OF YEARLY PM FILTER CHANGES THAT THE SYSTEM SURGE TANK BE DRAINED AND THE "AIR <br />7. COARSE FILTER AND SS -IMF UNITS MAY BE CHANGED INDIVIDUALLY. <br />PRE -CHARGE" ARE CHECKEDTO INSURE A 15 TO 20 PSI CHARGE IN THE BLADDER OFTHE SURGE TANK. <br />5� IF TANK PRE -CHARGE IS ZERO OR WATER IS PRESENT FROM THE AIR VALVE, TANK SHOULD BE REPLACED. <br />8. HONEYWELL PRESSURE REDUCING VALVE MODEL DS05CIO30 (SET AT 55 PSI) INSTALLED AFTER TEE TO SURGE TANK AND NOMME 1111RMO�\ a�Mftl\ a 101%,4\1 <br />'s <br />6. SYSTEM BOTH FILTER MANIFOLD AND SURGE TANK SHOULD BE SANITIZED AT TIME OF PM FILTER <br />\\N\" <br />w <br />BEFORE FIRST TEE TO BIEVERAGE EQUIPMENT. 11111, \1i <br />REPLACEMENT. z1h, G\\\�\\\, \1 I <br />"IL11.4,111ml Nm\,Nmmm\m, <br />EVERPURE WATER PURIFICATIONO"YSTEM <br />ECOL ' AB SYSTEM <br />ON SIDE WALL. <br />COORDINATE WITH <br />SINK GRID SYSTEM <br />DISCHARGE <br />TUBES <br />FINISH9 FLOOR <br />..... . ..................... . ........ <br />----- - - ------------- - ------ <br />FS <br />P-TRAP <br />3-COWPARTMENT SINK DETAIL, <br />N.T.S, <br />`REASE TRAP NOTES: <br />-- - -------- - <br />LISTED B IAPhAO TO ASI'VIIIE GREASE <br />INTIE:R'C'EPTOR STANDARD #A1 12,14,3 <br />AN D C , SA B48 1. 1. <br />FACTORY INSTALLED, BIJILT-IN FLOW <br />CONTROL. <br />1N_TFEGRAL AIR REI HEFYIANTI-61PHON. <br />S3 THREE 01UTLET OPTIONS FOR EACF1 <br />ROUGH -IN_ UNIT SHIPPED WITH <br />05FIFLE'T DIFFUSER IN CUTLET "B", <br />TVVISTHANDL.E WASTE <br />DRAIN VALVE SIMILAR -1-0 <br />T&S B-3940, 1 YP. OF 3 <br />DRAIN 2---COMP SINK <br />INDIRECTLY TO F1 C "1 '13 R <br />SINK WITH AIR GAP <br />3" TO RECESSED GREASE <br />INTERCEPTOR (GFI, REF. 1.1"P1.0 <br />FOR UNIT LOCATION <br />I- U K LU U/A I I U IN 3 VV 1 1 H LU VV r- r� 3 1 i_� I I �_ U r� U Y I q A Ivi I �_ v rk r �)�) U r, r �), K r- �_kU I r% r- IVI r- IV I I �, I N L U 3 L U I-- I r, 4r �_ r I L I t h <br />CARTRIDGE ORTHE T�C FILTER CARTRIDGE IN PLACE OFTHE XC FILTER CAR7RIDGES BASED ON THE GALLONAGE <br />RATE AS STATED BELOW. BOTH FILTERS HAVE EQUAL MICRON RATING WITH MORE GALLONAGE CAPACITIES <br />Architectural <br />THIAN THE PRESENTXC CARTRIDGES USED IN THE SYSTEM. <br />Solutliioniis <br />Group <br />8. THE 4FC AND 7FC FILTER CARTRIDGES HAVE A HIGHER RATED FLOW RATE THAN THE PRESENT XC FILTER <br />CARTRIDGES WHICH WOULD ALLOW FOR LESSER FILTER PRESSURE DROPS DURINGTHESERVICE CYCLE. <br />A. 4FC FILTER CARTRIDGE RATING IS 0.5 MICRON, 15,000 GALLONS AT 2,5 GPW <br />B. 7FC FILTER CARTRIDGE RATING IS 0.5 MICRON, 2S,000 GALLONS AT 2.5 GPM <br />PER WSEC 2045 SECTION C404.8, P"I RECIRCULATING <br />0 <br />m <br />U) Q <br />PUMP CONTROLS SHALL ACTIV/-,,T-F- UPON SENSING <br />`C_ <br />w <br />N <br />jy <br />HOT'AIA'TER DEMAND FROM THE FLOW SENSOR, <br />0 <br />(0 <br />AND SFIALI LIMIT THE TEMPERATURE OF THE WATER <br />00 <br />0 <br />0 <br />ENTERING THE COLDANATER PIPING TO 164-F. <br />L <br />z <br />80 <br />EXPANSION TANK. RE: <br />w <br />T_ <br />FLOW <br />SENSOR <br />i-Tv V 0 Ij I- �, I-- y <br />TO SYSTEM <br />BALL VALVE, T) <br />SE' <br />DISCH/ <br />TEMPER, <br />TO 12 <br />I IM <br />ID I 1-UNLifo F <br />1-0 SUPPORT <br />WEIGHT OF 650 <br />LBS. <br />WATER HEATER <br />N.T. S, <br />WATER HEATER SCHEDULE <br />RETURN <br />�Uum <br />__LIEF <br />RECIRCULATING <br />ALVE <br />PUMP (Pi) <br />--- --- ----------- -- --- -------- <br />TEMPILRATURE <br />SENSOR <br />CW SUPPLY TO <br />WATER FIEATER <br />CHECK <br />-------------------- <br />VALVEJYIP <br />FLEXIBLE CONNECTOR TYP <br />T & P RELIEF <br />GALVANIZED SHEET NPIETAL <br />DRAIN PAN 4�'DEEP <br />----------------- PIPE FULL SIZE DN <br />TO MOP SINK (�LS) <br />WITH AIR GAP <br />(1) 0 <br />< <br />M, <br />z <br />g <br />Lu <br />Z <br />w <br />"j, <br />SHEET: <br />P2.0 <br />