|
PLUMBING SPECIFICATIONS
<br />INTRODUCTION
<br />1A THE CONTRACTING FOR INSTALLATION OF PLUMBING SYSTEMS WILL BE AC COI`AI P L! �_31 _1 E� D 1�11NI FHE
<br />IFIELD ATTF-iE DIVISION LEVEL (IN(DASE OF A CONFLIC-I BETIOJEEN TI-IIS SPECIFICA_f�ON AND -1-11 ii": CONTRACT
<br />DOCUMENTS AND/OR',.AJRHTEN OR VERBAL INSTRUCTIONS PROVIDED BY THE COW3__FR1JkC1I ION` NIANAGEER,
<br />T HIE:: DIVISION'S INSTRUCTIONS SHIALL PREVAIL). "FIEREAFTEER IN TI-11S SPECIFICATION, TFI`1,___ �v`V`ORD "iPLUIVIBlIliC,
<br />CONTRACTOR" SHALL REFER TO THE INSTALLING PLUMBING CONTRACTOR AND`0,,f'1NE__`F,` Q'i-IAII-L R'ERER J-0
<br />7-ELEVEN. REFER 'TO Sid EET'DOW'FOR RESPONSIBLE PROVIDERS.
<br />12 SCOPE OF WORK
<br />12.1 PLUMBING CONTRACTOR SHALL FURNISH AND INSTALL PLUMBING FIXTWRESS,
<br />A,NID) ATTENIDANT PIPING AS STATED HEREIN. REFER -f-OTI-iE PLUMBING FLANIS AND `Fi`�E "I"JIIA-f E,1,IA1,,,`
<br />PORTION OF THIS SP CIFICATION FOR EQUIPMENT TO BE IF-URMSFIED. E'XACT LOCAT!CIN 0`11'_^ ALL EOUIPN;rl�,ENT
<br />SHAU BE� DETERMINED BY REFERENCE TO THE PLANS AiNID MEASUREMENTS ATTHE Bi.j`IJDIN'1_3 `51-1-EAND
<br />COOPERATION WITH OT HER CONTRACTORS AND IN ALL CASES SHIALL BE SUBJEECT OWNIPRS
<br />APPROVAL.
<br />GENERAL
<br />13A ALI SAFETY PRECAUTIONS SHALL BE1_AKEN TO AND
<br />EQUIPMENT.
<br />M�
<br />1.3.2 N 0 C 0 M P E N S A T 10 N F 0 R VVO R K E R F 0 R M, 'E. I-) OV E'. R A N D A B 0" E P R E r", 1 8, i, 1',�,Al S, ALL B E
<br />Al LOVVED DUE 70 CONDITIONS WITH"kAll 11CI-1 1
<br />1,3�3 ANY DEVIATION BY PLUMB!M3� CONFFRACTOR IFROM 1'HE I"LANS ANE-) SP-'_ OR
<br />I 'J
<br />ANY SUBSTITUTION OF EQUIPMENT FROM THAT SPECIFIED, S;--IALL FIRST RECEIVE W11VAL.
<br />1.4 OPERATIONS AND INSTAILLA'TION
<br />ALL DELIVERIES TO COINCIDE WITH CONSTRt CTION SCHEDUI E. INlAIERI LS, HALI BE:
<br />J
<br />STORED'Od"FiERE AND/OR AS ID I R E(.,'T_E_ 1) BY THE GE--NERAL, CONTRA".'C'TOR. STORAGIE M!1JS,_F I' IF IN SUCI I A
<br />PLACE AS TO AVOID ACCIDENTAL MUT11 ATION BY EQUIPMEENT BY ANY CONTRACTC R Vv"HII I F-�FRFORNIING
<br />Vf[-iEI'_HER ON SITE OR OFF'.
<br />1A.2 ALI- UNDER FLOOR PIPING SHALL BE iNSTALLIFED
<br />CON'TRACTOR'S WORK SC11EDULE. NO UNDERG�ROUND`AIORK SHALL BE- COVERvE"I-i (A'ITHL, 11
<br />HAS BEEN INSPECTED AND TESTED.
<br />7
<br />1.43 PLUIMBING CONTRACTOR SHALL DO THE 1',11ECESSARY TRE_NG�HING, SHORIINP--i !M D
<br />BACKFI LLING REQUIREID TO f:ULFILL HIS CONTRACT. BOT-11 OMS OF TRIE -_ NCHES SHAI-1. 1FIE C'LIT 1"") GR,,6,D!E_,1
<br />1A.4 ALL OPENINGS AND STUB -UP FOR PLUMBING PIPING AND FIXTURES �.'__�AREFULLY
<br />LOCA-1 ED AND COORDINATED, OTHERWISE, PLUMBING CONTRACTOR SHALL CU"T NEW 0i E�_-NINGS Al HIS
<br />OWN EXPENSE, AND REHABURSEE OTHER SUBCONT RACTORS FOR ANY DAM�A"3"E DONE 11-0 T-1-PiR Vv',`DRK,
<br />t5 COD'E.AND PERMITREQUIRELEMENTIS
<br />1,51 ALLVVORK SHALL. BE PERFORMED IN ACCORDANCEWITH APPLICABLE LOC.""AL LANVS,
<br />REGULATIO'NS, ORDINANCES, STATUTIES, AND CODES, WHICH SHALL B31E DELINEATED. AND ALL
<br />, AODIFICAT IONS REQUIRED BY THE INSPECTION AUTHORITIES SHALL BE MADE BYPLI
<br />WITI-IOU'FADDITIONAL COST TO OWNER�
<br />1.5�2 PLUMBING CONTRACTOR SHALL. OBTAINI, PAY FOR AND FURNISH ALAL By
<br />LOCAL ORST TE ORDINANCES OR CODES. AND THESE COSTS SIFIALL BE STA1 ED SEP" RAT -PLY ON Tj_j�_
<br />,1A
<br />PLUMBING CONTRACTOR�S INVOICES.
<br />2,
<br />2A DOMESTIC 'WATER PIPING
<br />2. 1 � 1 A B 0 V E= A N D B E L 0 \A1 G R A D E WA"FE R P 1 P I N G S HI A L L IB E P E X, T U B I N G C-0 NIF" 0 Ir,,1 G - F 0 A S'T 1'
<br />F877 CROSS -LINKED POLYETHYLENE TUBING IHOT AND COLD WATER DISTRIBUTION SYS-1 EIAPVIS, A,�.-3T.fvll `_i'376
<br />1C,ROSS-LINKED POLYETHYLENE TUB;E-, ASTMI F11 807 FlIFTING AND ASTN1 F-2 15c) FTIFTINGE3, GOI�,JIPLY Vyl] NSF
<br />STANDARD 14 AND 61, AND COMPLY \1\11TH AS'TM �EE84 AND CAN./ULC S102.2.
<br />V,,jA,TERPEX CROSS -LINKED POLYETHYLENE OR EQUAL. ALL PEX _rUBING BELOW BE �'�'-dLEE'VED
<br />WITH PVC PIPE. 2. 1.1.1 FITTINGS: FIT] 1NGS SHALL BE ME:'C'FIANICAL CRIMP Fj'TTII\1GS IN W11
<br />ASTiNl E1807 AND F2159, PEX FITTINGS SHALL BE WATTS BRASS ("'RIN1PRING FITITINGS tJ,SiNK_�J E-, I _1 -H E_ VIJ/'�,_TlTci
<br />C'O P P E R C R I M P RI NG OR STAI N L ESS STE EL. C 1 N CI -iC LANil P 0 R EQUAL. I NS T'ALLEIC) 5 N Ar C OR IDANC E V1,0`1 I
<br />VvIIANUFACTURER'S RECOMMENDATIONS.
<br />11.2 ABOVE AND BELOWkr7_'RAEJE`1fVA_FE:R PIPING SHALL BE-1YIPE"L." AND11,11" 1-IA,'r_-',f_-,
<br />SEAMLESS-3 COPPER TUBiNG CONFORMING -TO AE31'M [388�
<br />2,11.2.1 COPPER UNIONS: %'.AST-COPPC-7R-.AL.LOY,'�-iEXAGONAL--STOCi,�,B,,-.'���.',-')'�-,-'� �,P.ATH Bf%1LL-AND-
<br />SOCKET, METAL -TO -METAL SEATING SURFACE AND MATERLAL S: �ALI_ ', E AsrM 1381,�
<br />'vVATER-FLUSHABLE, LECAD-FREE FLUX ALLOY SOLDER.
<br />2.2 FILTERED%A,1'AfER PIPING
<br />2.2.1 ABOVEAND BELOW GRADE FILTERED WATIER PIPING SHALL BE CPVC'� CONFORMING
<br />TO ASTIM D2846 AND CSA B137 CHLORINATED POLY (VINYL CI-ILORIDE) P11_ASTICI-:K)'1 A1`,,'E-)G0LD WAJi__J-,-,,,
<br />DISTRIBUTION SYSTEMS, ASTM D1784 RIGID AND CHLORINATED PVC COMP,_,)UNDs, A�s_TNfi F_419'3 SOLVI NT
<br />�j
<br />C" E: M EN TS, COM PLY'AfFI-Id NS F S TAN DARD 14 AN D 6 1, AN D COM P Ly WITH ASTM E84 /1 N CA INII. ULC S, 1 02 . 2
<br />CPVC TUBING SI-IALL BE FLOVJGUARD GOLD CPVC CTS OR EQUAL.
<br />2 L: 's i L
<br />11-.2.1,11 FITTINGS'. FITTINGS SHALL BE SOCKET TYPE- 10INTS IN CID'M�F'LIA�dr V11H AS 11MI
<br />D28,11GAND CSA B137, CPVC FITTINGS SIAALL BEEFLO",A]GLIARD GOLD CPVC CTS FITTINGS OR EQUAL.
<br />JOINING MATERIAL. SHALL BE ASTIMIF493 SOLVE".NIF CEMENT. INSTALLED IN ACCOi_,1,I_'ANC`.E VM-1 H
<br />RECO'NIME�NDATiONS.
<br />,VAN U FACTU RiE - -
<br />2.3 SOIL, "AfASTEE AND VENT PIPES
<br />2.3.11 ABOVE AND BELOW Gf ADE SO!L, WAS-IfE AND VENT PIPIN(3 SI-1ALL BE P1 p
<br />SCF1EDULE- 40 DWV PIPE CONFORIVIIING TO ASTMI D2665 WITH PLAIN ENDS. CE_LLI_JI_j",R (i
<br />ALLOWED. INSTALL PER ASTM E)2665 AND ASTM f)232`1,
<br />E TYPE Dkillf", PiPEFIT-1 1J`\IG11:.'11_ P,,STfv1 D266E, `\4ADE
<br />M
<br />2
<br />�.3,1.1 FITTINGS SHALLBEPVC SOCKET-
<br />ASTIP01 D343111 DRAIN, WASTE AND VENT PAI
<br />�11 1 2,33. 2 ABOVE AND BELOW GRADE SOIL. V,.1ASTEE AND VENT PIPING SHIAL], E3E rA'--'-f
<br />CD
<br />!RON SOIL PIPE AND FITTINGS CONFORMING TO ASTM A74 WITH ASTIA C564 RUB,,"�'E'R GASXf___1 S, INE,,TFAILL
<br />0 C I S P I � S " CAS -1 - 1 RO N S 0 1 L P I P E A N D F I T1 1 N G S H A NJ I-) B Oi') I-,, C 1' IIA, F'T E R
<br />GAS' -IRON SOIL PIPING ACCORDING I
<br />IV, "INSTALLATION OF CAST !RON SOIL PIPE AND FI'TTINGS."
<br />L AND VENT PIPINIGS"HALL BE ALLOWED � 1) BE C'(113PP�:7R Ed AINAGE
<br />2.3.13ABOVE GRADE SOIi , VJAS'TI_ T,' El R
<br />TUBING CONFORMING T 0 ASTM B306 AT PLUMBING CONTRACTOR'S OPTION,
<br />2.4 FLASHING'. SNEET LEAD. 4 POUNDS PIER 'SQUARE FOOT, MINIMUM.
<br />2.5 INSULATION
<br />2,5.1 DOMESTIC COLD WATE'R ('VOT HiN BUILDING):
<br />COPPER PIPE: 1,7' WALL. ONE- PI ECE F1 BE RGLA&S, COVERING HAVING A C.C11NDIJ1C1TIVFI_Y NOT
<br />EXCEEDING 0.27'AlITH FIRE RESISTANT jACKET\AJITH SELF-SEALINGLAP TO' PROVIDE A CONTHINIJOUS
<br />VAPOR BARRIER BY CERTAiNTEED, ONAIENS-CORNING OR ARMSTRONG, f'SEj7__ B`FLO�J`,! FOR PLUMBING' f"I_'FPN1G'
<br />INSULATION REQUIREMENTS'
<br />PEX TUBING: IN C L! 11MIATES WFIERE TEMPERATURES CAN DROP BEL.C)W FREEZ'HNIG (0"C,
<br />2'F) INSTALL 1/2" \AIALL. ONE-PIE,CE F71BERGLASS COVERING HAVING A("'ONDUC-171VITY IN�01_ E_'1'-�CE__EJ_)ING C-).27
<br />'WITI-i FIRE_ RESISTANT JACKETVIJITH SLE117-SEALING LAP -1-0 PROVIDE A CONT11NeUOIYS VAP`1_31-__,� BY
<br />CERTAINTEEED, OW'ENS-CORNING OR ARMSTRONG. (SEE BELOW FOR PLUrVIBiNG:1 FFI`IHr41f_-' IGN
<br />REQUIRE. 1_-N'1
<br />EXCEPTION: FOR NON-R�7r'IRCUI - ATING HOT�AIATIP_R SYSTEIM!, PROVIDE '1�19"WAIA_ ('ANIE-PIECE
<br />e FIBERGLASS COVERING HIAVING A SON �ITIVITY NOT E/XCEE'DING 0.27 WITH FIRE'' I--, IS JAC""KEl- �Ajf
<br />_1 DUr,
<br />SEELF-SEALING LAP TO PROVIDE A CONTINUOUS VAPOR BARRIEER BY CERTAIWIFEP�D, OF),
<br />V1, R 0 N G 0 N T 11 E F R S T 8 F E E-T (DIF I N L E__ T P I P I N G �AIA,_ R HE ATE R.
<br />A Rf�,./iS I
<br />C-D
<br />U-1
<br />CPVC -_RJBING: INI CLIMATES \A,1HERF TEMPEDATURES CAN DROP BELOW FREEZING (O'C
<br />32-F) INSTALL 1/2v`vALL. ONE-PiECE FIBERGLASS COVERING HAVING A CONDUCTIVITY NOT EXCE[EDING 0.27
<br />r
<br />VATH FIRE RESISTANT jACIKET WITH SELF-SEALING LAP TO PROVIDE A CONTINUOUS VAPOR BARRIER BY
<br />CERTAiNJEED, OWIENS-CORNING OR ARMSTRONG. `SEE BELOW FOR PLUMBING FITTING INSULATION
<br />R E Q U I R E I VIE N -1 S).
<br />2�5.2 ID 0 M E ST I C I 10 T WAl R
<br />COPPER PIPE. 1/2."'vNIALL ONE-PIECE FIBERGLASS COVERING HAVING A CONDUC-FIVITY NOT
<br />EXCEEDING 0.27VYITH FIRE RE___SISTANTJA11_1'KET WITH SELF-SEALING LAP TO PROVIDE A CONTINUOUS
<br />VAPOR BARRIER BY CERIFAIN-FEED, O'kAjENS-CORNING OR ARMSTRONG, (SEE BELOW FOR PLUMBING FITTING
<br />INSULATION RIE QUIREMENTS)
<br />PPXTUBING: 1/2"\AIALL ONE-PIECE FIBERGLASS COVERING HAVING ACONDUCTIVITY NOT -
<br />EXCEEDING 0.27,,f,j1jTH RESISTANTJACKET WITH SELF -SEA' INGIAP TO PROVIDE A CONTINUOUS
<br />LI L
<br />VAPOR BARRIER BY CE.RTAINTEED, OWENS-'C'ORNING (DR ARMSTRONG, (SEE BELOW FOR PLUMBING FITTING
<br />INSULATION REQUIREMENTS)
<br />FOR HOTIAIATER PIPING BEING SERVED BY SYSTEM VVITF-I RECIRCULATING PUMP, PROVIDE: I"
<br />LL (DNE-PIECE FIBERGLASS COVERING HAVINGACONDUCTIVITY NOT EXCEEDING 0.27 VVITH FIRE
<br />LAP 10 PROVII.AE..'A CONTINUOUS VAPOR BARRIER BY
<br />CERTAI NTEEED, C)'v'v'F_NS-COR11N ING OR ARMSTRONG. (SEE BELOW FOR PLUMBING FITTING INSULATION
<br />RIEE.QUIREMENTS)
<br />2.5.3 INDIRECT AND CONDENSATE DRAIN PIP!NG OUVITHiN BUILDING):
<br />0 P P El
<br />R PIPE: PROVIDE 1" FLEXIBLE UMCFLLULAR INSULATION BY ARMACELL.
<br />PVC"' PIPING� NO iNSUI ATION REQUIRED.
<br />FOR PIPING Al HANGERS, PROVID)E 8" LONG SECTIONS OF HIGH DENSITY, HIGH TEMPERATURE CALCIUM
<br />SILICATE BY JOI-INS-MANVILLE, FIBERGLASS BY KNAUF, OR 8" LONG STYROFOAM BILLETS BY DOW.
<br />INSULATION SHALL BEC'ONTINUIOUS ALONG THE PIPE SURFACE, EXCEPT AT VALVES, UNIONS, AND WHERE
<br />PIPING IS E-I^XPO�'SED AT FIXTUME_�_S.
<br />FOR HOT ANDC'OLA) WATER PIPING EXPO'SED, CONCEALE:D IWVVALLS, AND/OR IN87ALLED INSIDE MASONRY
<br />UNITS OF',A;f',,LLS. COVE_-R FITTINGS WITH ZESTON, KNAUF, OR EQUAL ONE-PIECE PVC PREMOLDED
<br />INSIULAIFING COVERS. FITTING COVERS, JACKETS AND ADHE-SIVES SHALL NOT EXCEED FLAME SPREAD
<br />RATING OF 25 AND SMOKE DEEVELOPMENT RATING OF11 50 PER ASTM E84. AT ALL ELBOWS AND TEES, FILL
<br />VOIDS BETWEEN COV1. RS AND PIPING WITH FIBERGLASS INSULATION AND TAPEJOINTS. INSTALL PIPE
<br />INSULATION IN COfAIIPLIANCEII WITH MANUFACTURER�S REECOMMENDATIONS, WI-IERE PREMOLDED
<br />INSULATING FITTINICSS ARE NOT APPROVED BY LOCAL AUTHORITIES, MITER INSULATION ATFITTINGS.
<br />2,6 INDIRECT MND CONDENSATE DRAIN LINE&
<br />PROVIDE HARD DRAWN, TYPIE"M" OR "L` COPPER PIPE FOR ALL CONDENSATE DRAIN PIPING FROM COOLER
<br />ANDFREEZER EVAPORATORS. PROVIDE IlEAT FRACE FOR ALL CONDENSATE DRAIN PIPING LOCATED IN
<br />FREEZER,��'i, AND ROUTE I-OFLOOR DRAIN IN BUILD DING.
<br />PROVIDE PVC PIPE FOR Al L OTHER INDIRIE'C'T AND 'CONDENSA-FE DRAIN PIPING FROM HVAC, PLUMBING, AND
<br />BEVERAGIE, E'QUIPM';`NT. AND) ROUTETO IFI-C)OR DRAIN IN BUILDING.
<br />3, TESTING AND INSPECTIONi
<br />THEENTIRE PLUMBING SYSTEM SHALL. BE TESTED BEFORE COVERING13 OR ENCLOSING.
<br />3.2 INSPECTION: TIONS ANt ADHERENCE
<br />W
<br />\ ORKSPIALL BE INSPE__,.CI"ED FOR ('OM`iL.IANCEWITH CODES, ORDINANCE I S, REGULA D
<br />TO CONTRAr'T DOCUMENTS. PLUMBING CONTRACTOR SHALL SUPPLY OWNERWiTH SIGNED FORMS OR
<br />PROOF OF ACC EPTANCE BY THHE LOCAL AUTHORITY BEFORE CONTINUING FROiM ONE STAGETO ANOTHER,
<br />FINAL A." PROVAL S11ALL BE OBTAINED BEFORE- FINAL. PAYMEN-1- IS MADE C )N THE CONTRACT.\
<br />33 PERFORMANCE RE'QUIRED:
<br />PLUMBING CONTRACTOR SHALL INSTAI L ALL PLUMBING SYSTEMS LEAK FREE AND AS
<br />3. 3. `1
<br />PER PLANS AND SPECIFICATIONS.
<br />-3.2 ALL EXPOSED EQUIPMENT SHALL BE INSTALLELE) IN A WORKMANLIKE MANNER AND
<br />'T TC1 ARCF _URAJ INSPECTION FOR AESTHETIC APPEARANCE.
<br />001 BE SUBJ" 'ITECI
<br />4. CUTTINIG) AND CLE-ANING:
<br />4. PLUMBING C"ON"FRACTOR SHALL CLEAN ENTIRE SITE OF DE,BRIS, TOOLS AND EQUIPMIENT
<br />-I
<br />RELATED TO THIS WORK.
<br />4, 2 PLUMBING CONTRACT OR SHAI L BE RESPONSIBLE FOR ALI11 CUTTING AND PATCHING OF H's
<br />V,,jORK'V`,,!I_1 I C H MAY BE R EQU I R E D TO RELI EVE TH E WORK OF OTHER CON RACTORS.
<br />5. G U AiR A N _11E: E7_.. S � 1
<br />5.1 PLUMBING CONTRACTOR SHAL.L GUARANTEE ALL OF THE WORK AND THE COMPLETE
<br />OPERATION WILL BE FREE FROM DEFECTS IN WORKMANSHIP AND MATERiALS, PLUMBING CONTRACTOR
<br />AGREES TO REPLACE, WITHOUT EXPENSE _1_0 THE OVVNER; ANY PART OF HIS WORK ON THIS INSTALLATION
<br />WH 1CH, 'DROVES -10 BE DEFEDC'TIVE `v`,jITI--i I N ON E (1) YEAR AIFJ ER ACCEPTANCE OF TH E WORK.
<br />11
<br />R E V 0 3 / 0 3 ""1 t:
<br />CONTF
<br />IVIODU
<br />LAV .13HR"DUn
<br />`I-) L's
<br />j
<br />ASSE 1013 COMPLIANT
<br />CASH ACME RP200 RPZ
<br />BACKFLOW PREVENTER,
<br />DO NOT MOUNT HIGHER
<br />THAN 6-0"
<br />Xc�
<br />V SUPPLY
<br />13'Y-STRAINER
<br />Z�C�
<br />ROUTE DISCHARGE
<br />TO AN APPROVED
<br />RECEPTOR
<br />LL
<br />Q0
<br />,31/4" FLEXIBLE
<br />TUBING 10 FT
<br />REQUIRED
<br />3/4" BALLVALVE
<br />SETSURGE
<br />TANK ON
<br />SHEI F
<br />3/41�'
<br />BY-PASS
<br />----- ------- - ---- 1 ------- ------------
<br />U
<br />I � - r*H vvrz
<br />i --�. F1:1
<br />COARSE
<br />FILTER
<br />3.4
<br />PLUG
<br />SS -IMF
<br />PRESSURE
<br />REDUCING SS -IMF
<br />VALVE.
<br />U,
<br />0
<br />0
<br />0
<br />1� REF NOTE
<br />#8 BELOW
<br />0
<br />'LL
<br />01
<br />0
<br />0
<br />SPRING -LOADED
<br />I
<br />`T
<br />LL
<br />`IF
<br />LL
<br />-11
<br />U.
<br />15t
<br />CHECKVALVE
<br />1:1
<br />REF. I/P1.1
<br />FOR ROUTING
<br />DIAGRAM
<br />ROUTE OVER FLOW TO AN
<br />APPROVED RECEPTOR
<br />CPVC BEVERAGE TUBING
<br />TAG SLURPEE
<br />314" REINFORCED PLASTIC LINE TO
<br />SLURPEE/LEMCNADE ABOVE CEILING. PROVIDE
<br />CHEC" E. 9,Ri��_.I�-A BE 1022
<br />C
<br />_SLURPEE/LEMONADE REQUIRE
<br />5155 PSI =\NATER PRESSURE- C
<br />Ap_
<br />3/4" REINFORCED PLASTIC LINE TO
<br />POST MIX ABOVE CEILING. PROVIDE BACKFLOW
<br />PREVENTER RPZ-3.
<br />TAG POST MIX
<br />1/2" LINETO ICE MAKER ABOVE CEILING. PROVIDE
<br />CHECK VALVE CONFORMING TO ASSE 1022
<br />TAG ICE MAKER
<br />-REGULATOR @ ICE MAKER
<br />TO < 60 PSI -
<br />TAG COFFEE
<br />3/4" LINE TO COFFEE, TEA, CAPPUCCINO
<br />MACHINES. PROVIDE CHECK VALVE
<br />CONFORMING TO ASSE 1022
<br />SHUT OFF VALVE (TYP..)
<br />314` LINE SPLITS INTO 1/2" LINES WITH
<br />SHUT OFF VALVES AT EACH COFFEE AND
<br />TEA BREWER AND CAPPUCCINO MACHINE.
<br />ZL
<br />I CONTRACTOR SHALL VERIFY WATER
<br />PRESSURE AT BEVERAGE EQUIPMENT IS
<br />SUFFICIENT FOR OPTIMAL. OPERATION
<br />AND NOTIFY ARCHITECT IMMEDIATELY
<br />WITH ANY INADEQUACIES.
<br />w
<br />(n
<br />W
<br />U)
<br />W
<br />w
<br />Uj
<br />Uj
<br />—
<br />>
<br />w
<br />—
<br />>
<br />w
<br />�;
<br />w
<br />w
<br />(n
<br />w
<br />w
<br />w
<br />w
<br />w
<br />w
<br />w
<br />w
<br />m
<br />m
<br />m
<br />m
<br />m
<br />C)
<br />0
<br />0
<br />cr)
<br />CD
<br />0
<br />w
<br />0
<br />w
<br />0
<br />Lo 10-23-2019
<br />� OT
<br />6050 -
<br />RIGHT
<br /><
<br />i:
<br />Cf)
<br />_j
<br />0)
<br />z
<br />Z
<br />L0
<br />C)
<br />0
<br />4)
<br />LLJ
<br />C)
<br />z
<br />0
<br />>
<br />(D
<br />w
<br />IT—
<br />w
<br />z
<br />..0
<br />-6
<br />c)
<br />w
<br />LLJ
<br />0
<br />:D
<br />w
<br />_j
<br />LO
<br />1�_
<br />C:
<br />Cu"'FFEE RELATED EQUIPMENT ON 3/4" FILTER LINE:
<br />FILTER SYS-11TEM MC)"DEL REQUIREMENTS FOR COFFEE RELATED EQUIPMENT:
<br />F-E.-N-TA-IF EY-ER P.0 �RE -------- - ------ --- -- --- .......... ---------- Im II
<br />1. THE PLUMBING LINE AFTER THE PENTAIR HIGH FLOW QUAD FILTER SYSTEM SHOULD BE INCREASED TO
<br />1. WATER SUPPLY MUST BE 3/4" INCH. Ys"FROM SYSTEM TO THE POINT OF THE WATER EQUIPMENT, Lm
<br />2, PLACE THE MELITTA BEAN TO CUP MACHINE AT THE FIRST POINT OF USAGE ON THE PLUMBING LINE FEEDING
<br />2. WATER SHUT-OFF VALVE SHALL BE "BALL LOCK" TYPE. POSITIVE ON -OFF. THE EQUIPMENT TO INSURE ADEQUATE FLOWS RATES,
<br />1 FILTERED WATER LINE TO COFFEE iiELATED EQUIPMENT IS IN THE FOLLOWING ORDER OF CONNECTION:
<br />3. DRAIN MUST BE PROVIDED TO PERMIT FL.USHING OF NEW FILTERS. 1. MELITTA BEAN TO CUP
<br />4. WATER FOR ICE MAKERS, COFFEE MAKERS, AND CAPPUCCINO MACF-IINES Sj__j A J.'L BE ROUTED TT11ROU`H TI iE SS -IMF UNITS. 2� FRANKE BEAN TO CUP
<br />3. CURTIS CAPPUCCINO
<br />5. WATER FOR FSD AND FCB EQUIPMENT SHOULD NOT BE ROUTED THROUGI-1 THE SS. -IMF UNITS (WILL REDUCE CARBONATION). 4� BUNN NITRO
<br />5. BUNN COFFEE BREWERS
<br />6, 4FC OR 7FC (CARBON' FILTERS MUST BE REPLACED IN SETS AS REQUIRED BASED ON GALLONAGE.
<br />6. LANCER ICED TEA
<br />4, AT THE TIME OF YEARLY PM FILTER CHANGES THAT THE SYSTEM SURGE TANK BE DRAINED AND THE "AIR
<br />7. COARSE FILTER AND SS -IMF UNITS MAY BE CHANGED INDIVIDUALLY.
<br />PRE -CHARGE" ARE CHECKEDTO INSURE A 15 TO 20 PSI CHARGE IN THE BLADDER OFTHE SURGE TANK.
<br />5� IF TANK PRE -CHARGE IS ZERO OR WATER IS PRESENT FROM THE AIR VALVE, TANK SHOULD BE REPLACED.
<br />8. HONEYWELL PRESSURE REDUCING VALVE MODEL DS05CIO30 (SET AT 55 PSI) INSTALLED AFTER TEE TO SURGE TANK AND NOMME 1111RMO�\ a�Mftl\ a 101%,4\1
<br />'s
<br />6. SYSTEM BOTH FILTER MANIFOLD AND SURGE TANK SHOULD BE SANITIZED AT TIME OF PM FILTER
<br />\\N\"
<br />w
<br />BEFORE FIRST TEE TO BIEVERAGE EQUIPMENT. 11111, \1i
<br />REPLACEMENT. z1h, G\\\�\\\, \1 I
<br />"IL11.4,111ml Nm\,Nmmm\m,
<br />EVERPURE WATER PURIFICATIONO"YSTEM
<br />ECOL ' AB SYSTEM
<br />ON SIDE WALL.
<br />COORDINATE WITH
<br />SINK GRID SYSTEM
<br />DISCHARGE
<br />TUBES
<br />FINISH9 FLOOR
<br />..... . ..................... . ........
<br />----- - - ------------- - ------
<br />FS
<br />P-TRAP
<br />3-COWPARTMENT SINK DETAIL,
<br />N.T.S,
<br />`REASE TRAP NOTES:
<br />-- - -------- -
<br />LISTED B IAPhAO TO ASI'VIIIE GREASE
<br />INTIE:R'C'EPTOR STANDARD #A1 12,14,3
<br />AN D C , SA B48 1. 1.
<br />FACTORY INSTALLED, BIJILT-IN FLOW
<br />CONTROL.
<br />1N_TFEGRAL AIR REI HEFYIANTI-61PHON.
<br />S3 THREE 01UTLET OPTIONS FOR EACF1
<br />ROUGH -IN_ UNIT SHIPPED WITH
<br />05FIFLE'T DIFFUSER IN CUTLET "B",
<br />TVVISTHANDL.E WASTE
<br />DRAIN VALVE SIMILAR -1-0
<br />T&S B-3940, 1 YP. OF 3
<br />DRAIN 2---COMP SINK
<br />INDIRECTLY TO F1 C "1 '13 R
<br />SINK WITH AIR GAP
<br />3" TO RECESSED GREASE
<br />INTERCEPTOR (GFI, REF. 1.1"P1.0
<br />FOR UNIT LOCATION
<br />I- U K LU U/A I I U IN 3 VV 1 1 H LU VV r- r� 3 1 i_� I I �_ U r� U Y I q A Ivi I �_ v rk r �)�) U r, r �), K r- �_kU I r% r- IVI r- IV I I �, I N L U 3 L U I-- I r, 4r �_ r I L I t h
<br />CARTRIDGE ORTHE T�C FILTER CARTRIDGE IN PLACE OFTHE XC FILTER CAR7RIDGES BASED ON THE GALLONAGE
<br />RATE AS STATED BELOW. BOTH FILTERS HAVE EQUAL MICRON RATING WITH MORE GALLONAGE CAPACITIES
<br />Architectural
<br />THIAN THE PRESENTXC CARTRIDGES USED IN THE SYSTEM.
<br />Solutliioniis
<br />Group
<br />8. THE 4FC AND 7FC FILTER CARTRIDGES HAVE A HIGHER RATED FLOW RATE THAN THE PRESENT XC FILTER
<br />CARTRIDGES WHICH WOULD ALLOW FOR LESSER FILTER PRESSURE DROPS DURINGTHESERVICE CYCLE.
<br />A. 4FC FILTER CARTRIDGE RATING IS 0.5 MICRON, 15,000 GALLONS AT 2,5 GPW
<br />B. 7FC FILTER CARTRIDGE RATING IS 0.5 MICRON, 2S,000 GALLONS AT 2.5 GPM
<br />PER WSEC 2045 SECTION C404.8, P"I RECIRCULATING
<br />0
<br />m
<br />U) Q
<br />PUMP CONTROLS SHALL ACTIV/-,,T-F- UPON SENSING
<br />`C_
<br />w
<br />N
<br />jy
<br />HOT'AIA'TER DEMAND FROM THE FLOW SENSOR,
<br />0
<br />(0
<br />AND SFIALI LIMIT THE TEMPERATURE OF THE WATER
<br />00
<br />0
<br />0
<br />ENTERING THE COLDANATER PIPING TO 164-F.
<br />L
<br />z
<br />80
<br />EXPANSION TANK. RE:
<br />w
<br />T_
<br />FLOW
<br />SENSOR
<br />i-Tv V 0 Ij I- �, I-- y
<br />TO SYSTEM
<br />BALL VALVE, T)
<br />SE'
<br />DISCH/
<br />TEMPER,
<br />TO 12
<br />I IM
<br />ID I 1-UNLifo F
<br />1-0 SUPPORT
<br />WEIGHT OF 650
<br />LBS.
<br />WATER HEATER
<br />N.T. S,
<br />WATER HEATER SCHEDULE
<br />RETURN
<br />�Uum
<br />__LIEF
<br />RECIRCULATING
<br />ALVE
<br />PUMP (Pi)
<br />--- --- ----------- -- --- --------
<br />TEMPILRATURE
<br />SENSOR
<br />CW SUPPLY TO
<br />WATER FIEATER
<br />CHECK
<br />--------------------
<br />VALVEJYIP
<br />FLEXIBLE CONNECTOR TYP
<br />T & P RELIEF
<br />GALVANIZED SHEET NPIETAL
<br />DRAIN PAN 4�'DEEP
<br />----------------- PIPE FULL SIZE DN
<br />TO MOP SINK (�LS)
<br />WITH AIR GAP
<br />(1) 0
<br /><
<br />M,
<br />z
<br />g
<br />Lu
<br />Z
<br />w
<br />"j,
<br />SHEET:
<br />P2.0
<br />
|