Laserfiche WebLink
SECTION <br />CONTINUED <br />Y CANOPIES -- <br />PART 2 - EXECUTION <br />2.3 FASCIA: <br />2.3.1 VERTICAL SUPPORTS SHALL BE DESIGNED AND SPACED PER ENGINEERED (DESIGNED TO LOCAL <br />CODES) STRUCTURAL DRAWINGS SUPPLIED BY CANOPY MANUFACTURER. SCREWS FOR FASCIA <br />SHALL BE CARBON STEEL CADMIUM PLATED OR GALVANIZED - SIZE AS REQUIRED. <br />2.3.2 REFER TO PROJECT DRAWINGS FOR FASCIA MATERIAL AND INSTALLATION. <br />2.3.3 MATERIAL SHALL BE ONE OF THE FOLLOWING: <br />A. PRE FINISHED METAL FASCIA SYSTEM. <br />B. PRE FINISHED FASCIA MATERIAL AS SELECTED. <br />PART 3 - GENERAL <br />3.1 FABRICATION DRAWINGS: <br />3.1.1 <br />CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ENGINEERED AND STAMPED SHOP <br />DRAWINGS FOR OVERHEAD STRUCTURE AND FOUNDATION SYSTEMS. <br />3.1.2 <br />DRAWINGS SHALL SHOW PROJECT LOCATION AND ADDRESS. <br />3.1.3 <br />ORIGINAL ENGINEER'S STAMP FOR APPROPRIATE STATE SHALL BE AFFIXED TO EACH PAGE OF <br />DRAWINGS. <br />3.1.4 <br />SHOP DRAWINGS SHALL SPECIFICALLY CALL OUT SOILS REPORT NUMBER AND DATE FOR WHICH <br />CANOPY FOOTINGS WERE DESIGNED. <br />3.1.5 <br />SHOP DRAWINGS SHALL SPECIFICALLY CALL OUT SIZE, WEIGHT, TYPE AND NUMBER OF ALL <br />STRUCTURAL MEMBERS. <br />3.1.6 <br />ALL DESIGN LOADS SHALL COMPLY WITH CURRENT BUILDING CODES AND LOCAL BUILDING DEPARTMENT <br />REQUIRED LOADINGS, WHICHEVER IS MOST STRINGENT, MINIMUM DESIGN LOADS SHALL BE <br />CONSIDERED TO BE: WIND 100#, LIVE 35#, UPLIFT 35# AND DEAD LOAD 35# OR AS LOCAL <br />STRUCTURAL DESIGN DICTATES. IF APPLICATION IS SUBJECT TO HIGH ALTITUDE (SNOW) LOADING, <br />DESIGN SHALL BE ADJUSTED TO COMPLY ACCORDINGLY. <br />3.1.7 <br />DEFLECTION OF ALL STRUCTURAL MEMBERS SHALL BE LIMITED TO SPAN/180 FOR L.L. ONLY. <br />3.1.8 <br />ATTACH DECK STRUCTURAL SUPPORTS PER ENGINEERED DRAWINGS, <br />3.1.9 <br />ROOF DECK SHALL BE AN ICC-ES APPROVED DIAPHRAGM DECK AND ATTACHED IN A MANNER THAT <br />COULD BE CONSIDERED A DIAPHRAGM. AN ALTERNATE TO THIS IS 1/2" DIAMETER STEEL ROD <br />DIAGONAL X-BRACING WITH TURNBUCKLES. LAYOUT OF ROD BRACING AND CONNECTIONS TO <br />STRUCTURAL MEMBERS SHALL BE APPROVED BY STRUCTURAL ENGINEER. <br />3.1.10 <br />CONCRETE FOOTINGS SHALL BE MADE WITH STONE AGGREGATE AND SHALL HAVE A COMPRESSIVE <br />STRENGTH TO A MINIMUM 3000 LBS. PER SQUARE INCH WITHIN 28 DAYS AFTER POURING, <br />3.1.11 <br />ALL FOUNDATION METAL REINFORCEMENT SHALL BE OF FORMED TYPE BARS (EXCEPT #2 BARS) AND <br />SHALL CONFORM TO THE REQUIREMENTS OF THE "STANDARD SPECIFICATION A.S.T.M. 615 GRADE 4 <br />40". <br />3.1.12 <br />THE SHOP DRAWINGS SHALL EXPLICITLY SHOW LOCATION OF DOWN SPOUTS, INTERIOR PVC DRAINS <br />IN WARM WEATHER AREAS, ETC., AS RELATED TO ANY AND ALL UTILITIES AND/OR PIPING AT COLUMN <br />LOCATIONS. ROOF DRAINS AND LEADERS SHALL BE DIRECTED DOWN THE INTERIOR CANOPY <br />COLUMN EXITING SIDE OF ISLAND LEVEL OR ABOVE FINISH GRADE OF CONCRETE SIDE PAD ON <br />DOWNHILL SIDE OF ISLAND. <br />3.1.13 <br />INCLUDE IN DESIGN PROVISION FOR OVERFLOW DEVICE AT OPPOSITE CORNERS OF CANOPY. <br />3.1.14 <br />CONSTRUCTION NOT SPECIFICALLY INDICATED SHALL BE ACCOMPLISHED PER MINIMUM <br />REQUIREMENTS OF THE UNIFORM BUILDING CODE, LATEST EDITION. <br />3,1.15 <br />IF THERE ARE ANY CONFLICTS BETWEEN LINES ON DRAWINGS AND GENERAL NOTES OR WITH <br />SPECIFICATIONS, THE MOST STRINGENT REQUIREMENTS GOVERN, <br />3.1.16 <br />ANY DEVIATION FROM THE PLANS OR SPECIFICATIONS SHALL BE APPROVED BY 7-ELEVEN, INC.'S <br />CONSTRUCTION REPRESENTATIVE. <br />11.17 <br />FABRICATION DRAWINGS SHALL BE DELIVERED TO APPLICABLE CONSTRUCTION OFFICE A MINIMUM <br />OF 4 WEEKS PRIOR TO COMMENCEMENT OF CONSTRUCTION. NO WORK SHALL COMMENCE PRIOR TO <br />APPROVAL OF DRAWINGS BY 7-ELEVEN, INC.'S CONSTRUCTION REPRESENTATIVE. <br />CD <br />SECTION <br />a <br />£OS <br />CANOPIES - CONTINUED <br />a'F <br />3.2 EXECUTION: <br />3.2.1 <br />COORDINATE DELIVERY AND INSTALLATION WITH FUEL CONTRACTOR THROUGH LOCAL <br />CONSTRUCTION OFFICE. MATERIALS SHALL BE STORED AT POSITION AS INDICATED BY <br />FUEL CONTRACTOR. <br />3.2.2 <br />CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING FOOTING ANCHOR BOLTS AND <br />TEMPLATE FOR DELIVERY TO FUEL CONTRACTOR 2 WEEKS PRIOR TO <br />INSTALLATION. SIZE IN ACCORDANCE WITH SHOP DRAWINGS AND IN ACCORDANCE WITH FUEL <br />CONTRACTOR'S SCHEDULE OF CONSTRUCTION, <br />3.2,3 <br />FOOTINGS FOR CANOPY AND PLACEMENT OF ANCHOR BOLTS SHALL BE PERFORMED BY <br />FUEL CONTRACTOR AS PER APPROVED SHOP DRAWINGS. TYPE OF CONCRETE SHALL BE AS PER <br />SHOP DRAWINGS. TYPE, SIZE, AND PLACEMENT OF ALL REINFORCED STEEL SHALL BE AS PER SHOP <br />DRAWINGS. <br />3.2.4 <br />THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS BEFORE STARTING WORK AND NOTIFY 7-ELEVEN, <br />INC.'S CONSTRUCTION MANAGER IMMEDIATELY OF ANY DISCREPANCIES FOUND. REFER TO SITE <br />PLAN FOR SIZE, TYPE AND PLACEMENT OF CANOPY <br />3.2.5 <br />CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR BEING PROPERLY LICENSED IN LOCAL <br />INSTALLATION AS WELL AS PROVIDING OWN PERMITS AS MAY BE REQUIRED. A COPY OF THE PERMIT <br />MUST BE ON FILE IN THE LOCAL CONSTRUCTION OFFICE PRIOR TO COMMENCING WORK. <br />3.2.6 <br />CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING CONSTRUCTION OFFICE WITH <br />ACCEPTABLE INSURANCE AS REQUIRED PER 7-ELEVEN, INC. INSURANCE SPECIFICATIONS AND <br />STANDARD CONTRACT FOR CONSTRUCTION. INSURANCE SHALL BE IN EFFECT FOR DURATION OF <br />WORK. <br />3.2.7 <br />CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL WORK OF OTHER <br />CONTRACTORS ALREADY IN PLACE, AS MAY BE REQUIRED. <br />3.2.8 <br />CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING AND OBTAINING APPROVAL OF <br />FUEL CONTRACTOR PRIOR TO PLACING OF ANY HEAVY EQUIPMENT ON TOP OF <br />CONCRETE WORK ALREADY IN PLACE. <br />3.2.9 <br />ALL FOOTINGS SHALL BE ON FIRM UNDISTURBED SOILS OR FILL COMPACTED TO 95% MAXIMUM <br />DENSITY BASED ON A.S.T.M. D 1557-70. IF ANY POOR SOIL CONDITION IS DISCOVERED DURING <br />EXCAVATION, THE DESIGN ENGINEER SHALL BE NOTIFIED IMMEDIATELY FOR SOIL BEARING <br />VERIFICATION. <br />3,2.10 <br />SUPPORTING COLUMNS SHALL BE PLACED AS PER 7-ELEVEN, INC. FUEL PLANS AND AS PER <br />APPLICABLE SITE PLAN. <br />3.2.11 <br />CANOPY SUPPORT COLUMNS SHALL BE CAPPED AT TOP. <br />3.2.12 <br />ALL MATERIALS SHALL BE ALIGNED TRUE AND FLAT AND ALL PLANES SHALL BE FLAT, TRUE TO <br />ESTABLISHED LINES WITH ALL SOFFITS BEING LEVEL AND VERTICAL WALLS CORRECT AND <br />ACCEPTABLE. PARAPET FASCIA SHALL BE VERTICAL AND PLUMB. ALL INTERSECTIONS SHALL BE <br />TRUE AND STRAIGHTEDGE LINES. MATERIALS SHALL BE LEFT IN ACCEPTABLE CONDITION TO BE <br />PAINTED BY OTHERS. ALL METAL SHALL BE FREE OF DEBRIS AS MAY BE REQUIRED FOR FINAL <br />PAINTING/FINISHING. <br />3.2.13 <br />FUEL CONTRACTOR SHALL BE RESPONSIBLE FOR NON -SHRINK GROUT BENEATH BASE PLATE <br />AND POURING OF CONCRETE AROUND CANOPY COLUMNS, COVERING ANCHOR BOLTS AS MAY BE <br />REQUIRED. <br />3.2.14 <br />CANOPY CONTRACTOR SHALL LEAVE ALL EXPOSED STRUCTURAL STEEL FREE OF DEBRIS, PRIMED <br />AND READY FOR FINAL PAINTING BY FUEL CONTRACTOR. <br />3.3 RESPONSIBILITIES OF FUEL CONTRACTOR: <br />3.3.1 <br />SHALL BE RESPONSIBLE FOR A MINIMUM OF 30 DAY NOTIFICATION OF DATE, WHEN SITE WILL BE <br />READY FOR INSTALLATION OF GASOLINE CANOPY. <br />3.3.2 <br />UPON AGREED DATE BETWEEN FUEL CONTRACTOR AND CANOPY CONTRACTOR, THE SITE <br />SHALL BE FREE OF MATERIAL, MOVABLE EQUIPMENT AND DEBRIS, LEVEL AND IN PROPER CONDITION <br />FOR CANOPY INSTALLATION. FUEL CONTRACTOR SHALL PERFORM SITE WORK AS <br />MAYBE REQUIRED TO COMPLY. <br />3.3.3 <br />FUEL CONTRACTOR SHALL NOT INSTALL GASOLINE DISPENSERS PRIOR TO CANOPY ERECTION, <br />UNLESS AGREED UPON IN WRITING BETWEEN THE CANOPY CONTRACTOR AND FUEL <br />CONTRACTOR. <br />3.3.4 <br />GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION OF CANOPY FOOTINGS AS <br />DESIGNED IN SHOP DRAWINGS PROVIDED BY CANOPY MANUFACTURER, PROVIDING ALL STEEL, ETC., <br />(WITH THE EXCEPTION OF ANCHOR BOLTS TO BE PROVIDED BY CANOPY CONTRACTOR). FOOTINGS <br />SHALL BE POURED IN A SUFFICIENT AMOUNT OF TIME, SO PROPER CURING TIME IS ALLOWED. <br />3.3.5 <br />FUEL CONTRACTOR SHALL BE RESPONSIBLE FOR PAINTING OF ALL METAL AND TRIM AS <br />RELATED TO THE GASOLINE CANOPY AS PER 7-ELEVEN STORE STANDARDS MANUAL, <br />3.3.6 <br />FUEL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WIRING AND INSTALLATION OF LIGHTS, <br />SIGNS, SECURITY LIGHTS, ETC., IN CONJUNCTION WITH NORMAL GASOLINE INSTALLATION. G.C. <br />SHALL CAULK SEAL ALL LIGHT FIXTURES TO CANOPY DECK. <br />3.3.7 <br />FUEL CONTRACTOR SHALL BE RESPONSIBLE FOR LEAVING BLOCK OUTS AS MAY BY REQUIRED <br />FOR INSTALLATION OF CANOPY IN ACCORDANCE WITH SHOP DRAWINGS. AND PLACEMENT OF <br />ANCHOR BOLTS IN ACCORDANCE WITH SHOP DRAWINGS AS RELATED THERETO. <br />3.4 WARRANTIES: CANOPY CONTRACTOR SHALL WARRANTY, IN WRITING, COMPLETE CANOPY INSTALLATION FOR A MINIMUM <br />PERIOD OF 2 YEARS. <br />A 5 YEAR WARRANTY GUARANTEEING INSTALLATION TO BE FREE OF DESIGN AND INSTALLATION <br />DEFECTS. EXCLUDING ACTS OF MAN, GOD AND NORMAL WEAR AND TEAR. <br />3.5 CLEAN-UP: CANOPY <br />CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANUP AND REMOVAL FROM SITE ALL TRASH AND <br />DEBRIS RESULTING <br />FROM WORK RELATING TO INSTALLATION OF CANOPY. <br />f 1m: a. _w .. <br />t ! e <br />1 111111111111110 <br />10B Iff" A i AV roffif IN <br />11malmoIll IMF '[IT 0- <br />WITNESSED <br />CONTRACTOR AND MUST BE USED TO PERFORM POST CONSTRUCTION TESTING TO ENSURE THAT 7-ELEVEN MAINTAINS <br />CONTINUITY WITH THE COMPANY'S REGULATORY COMPLIANCE TESTING PROGRAM. THE ONLY EXCEPTION APPLIES IF LOCAL <br />REGULATIONS REQUIRE THAT THE INSTALLATION CONTRACTOR PERFORM THE REQUIRED TESTS AND THE TESTS ARE <br />ON SITE BY A REGULATORYTHESE CASES <br />- CONTRACTOR <br />oO. MUST SUBMIT <br />DOCUMENTATION OF THE REGULATORY WITNESSED TESTS, AS WELL AS THE RESULT OF ANY SUCH TEST, DIRECTLY TO <br />COMPLIANCE DEPARTMENT. <br />T WILL NOT BE NECESSARY FOR TANKNOLOGY TO RETEST A COMPONENT WHICH WAS TESTED BY THE CONTRACTOR, IF THAT <br />! - • �_ _ ` - !lt" 1 • = I Im 4 la III A ! I1 <br />THE REQUIRED TESTS ARE DIVIDED INTO TWO CATEGORIES, PRE -FUEL TEST AND POST FUEL TEST. <br />THE TESTS PERFORMED DURING EACH PHASE ARE LISTED BELOW. <br />PRE -FUEL TEST - TEST PERFORMED BEFORE FUEL IS INTRODUCED OR DELIVERED INTO THE UST SYSTEM. <br />THE FOLLOWING TESTS ARE RECOMMENDED TO BE PERFORMED BEFORE FUEL IS INTRODUCED INTO THE UST SYSTEM: <br />PRE -FUEL TEST <br />ESTIMATED TEST DURATION <br />STP SUMPS <br />MINIMUM 4 HOURS <br />DISPENSER SUMPS/CONTAINMENT <br />MINIMUM 4 HOURS <br />SPILL CONTAINMENT BUCKETS <br />MINIMUM 1 HOUR <br />TANKNOLOGY MAY USE ONE OF THE FOLLOWING TEST METHODS: HYDROSTATIC, PRESSURE OR VACUUM, <br />WATER USED TO PERFORM THESE PRE -FUEL TESTS MAY BE DISCHARGED ON SITE AS LONG AS THE WATER WAS NOT IN <br />CONTACT WITH ANY FUEL, <br />CONTRACTOR PREPARATION FOR PRE -FUEL (BEFORE DELIVERY) TESTING <br />- THE TANKS, PIPING AND DISPENSERS MUST BE ACCESSIBLE TO INCLUDE ASPHALT AND CONCRETE THAT CAN BE DRIVEN <br />UPON. <br />- 110 VOLT AC CURRENT MUST BE AVAILABLE <br />- ALL PRODUCT PIPING, TANK SUMP, SPILL BUCKET AND DISPENSER SUMP/LINER WORK MUST BE COMPLETE AND <br />COMPONENTS ACCESSIBLE. <br />- TEST VALVES MUST BE INSTALLED FOR THE SECONDARY PRODUCT PIPING. <br />- DISPENSERS DO NOT NEED TO BE IN PLACE AND PRODUCT PIPING DOES NOT NEED TO BE PURGED. <br />- AS AN OPTION TO SIGNIFICANTLY REDUCE TIME ON SITE, THE CONTRACTOR SHOULD FLOOD ALL TANK SUMPS AND <br />DISPENSER SUMPS WITH CLEAN WATER THE NIGHT BEFORE THE SCHEDULED TESTING. WATER MUST BE ADDED TO A <br />MINIMUM OF 3 INCHES ABOVE THE HIGHEST PENETRATION OR SEAM IN THE SUMP OR PAN. <br />- THE CONTRACTOR SHOULD ALLOW SEVERAL HOURS TO ALLOW THE WATER LEVEL TO STABILIZE AND MARK THE LEVEL OF <br />THE WATER WITH A PERMANENT MARKER. <br />POST FUEL TEST - TEST PERFORMED AFTER FUEL IS INTRODUCED OR DELIVERED INTO THE UST SYSTEM. <br />POST -FUEL TEST <br />ESTIM=> D TEST DURATION <br />TANK INTERSTICE <br />MINIMUM 1 HOUR PER TANK <br />A. Pr A�(TIGHTNESS) <br />MINIMUM 2 1/2 HOURS <br />LINE/PIPE- <br />HOUR PER LINE/PIPE <br />LINE PRIMARY (TIGHTNESS) <br />COMPLETED DURING TANK TEST <br />LINE LEAK DETECTOR <br />COMPLETED ! - A -_ <br />STAGE 11 (WHERE APPLICABLE) <br />MINIMUM 3 HOURS <br />*AUTOMATICST <br />,. - <br />K GAUGE <br />*DOES NOT INCLUDE NEW AUTOMATIC TANK GAUGE (ATG) INSTALLATION. CERTIFICATION OF NEW ATG IS THE RESPONSIBILITY--f--i <br />OF THE INSTALLING CA:r <br />NOTE: WATER USED TO PERFORM DISPENSER SUMPSAND/OR SPILL BUCKETS, AFTER FUEL IS <br />INTRODUCED/DELIVEREDINTO THE T CANNOTBEAr E SITE. <br />WATER THAT IS OR WAS IN CONTACT WITH FUEL MUST BE PROPERLY DISCHARGED IN ACCORDANCE WITH APPLICABLE FEDE <br />STATE ANII LOCAL REGULATIONS. <br />CONTRACTOR PREPARATION FOR POST -FUEL (AFTER DELIVERY) TESTING <br />- THE FUEL LEVEL MUST BE BETWEEN 70-80 PERCENT OF TANK CAPACITY <br />- COMPARTMENTALIZED TANKS MUST HAVE FUEL LEVELS WITHIN 10" OF EACH OTHER. <br />ALL FUELING INCLUSIVE OF STAGE I AND STAGE II VAPOR RECOVERY AREAS THE FOLLOWING CONDITIONS MUST APPLY. <br />- ALL PRODUCT PIPING MUST BE THOROUGHLY PURGED OF AIR AND VAPORS. <br />- THE DISPENSERS MUST BE SET AND OPERATIONAL TO INCLUDE ALL VAPOR VACUUM PUMPS AND OTHER STAGE II <br />EQUIPMENT FULLY FUNCTIONAL. REPLACE FILTER AFTER PURGING. <br />- ALL HANGING HARDWARE MUST BE INSTALLED AND OPERATIONAL <br />- THE TANKS, PIPING AND DISPENSERS MUST BE ACCESSIBLE TO INCLUDE ASPHALT AND CONCRETE THAT CAN BE DRIVEN <br />UPON. <br />-110 VOLT AC CURRENT MUST BE AVAILABLE <br />- TEST VALVES MUST BE INSTALLED FOR THE SECONDARY PRODUCT PIPING. <br />CONTRACTOR NOTIFICATION TO TESTING COMPANY (TANKNOLOGY): <br />IT IS RECOMMENDED THAT THE CONTRACTOR PROVIDE NOTIFICATION TO TANKNOLOGY OF THE NEED TO PERFORM TESTS AT <br />LEASE 14 DAYS PRIOR TO THE ANTICIPATION TEST DATE. HOWEVER, TO ENSURE TESTS ARE CONDUCTED IN A TIMELY MANNER A <br />MINIMUM OF FIVE (5) DAYS IS REQUIRED. TANKNOLOGY UNDERSTANDS THAT ACTUAL DATE MAY CHANGE, BY PROVIDING THEM <br />WITH AS MUCH TIME AS POSSIBLE ALLOWING THEM TO MAINTAIN A TIME SLOT IN THEIR SCHEDULE TO SHIFT AS NECESSARY. THE <br />CONTRACTOR MUST KEEP TANKNOLOGY APPRISED OF THE ANTICIPATED DATE AND TIME THAT THE TESTING WILL BE NEEDED AS <br />PROJECTED DATES CHANGE. <br />C <br />0 <br />r` <br />In <br />(y) <br />c0 <br />fl— <br />a <br />In <® <br />® c", <br />®� <br />w <br />0CL <br />I <br />i <br />LH <br />W LOW <br />_I <br />UJI <br />LL <br />b..e: <br />•4'd't''.t. ''t.�ftf.�li.os <br />i <br />