Laserfiche WebLink
r ' - <br />c ,:: t ., ... a :..$ ..- -:.� .: 7. r, x v�,g :. '•' ., w .w,.. w, y. 3x ?s ,. < ._ .., .., ...-, ,:.. vy <br />.. - ., �".. - :. ,- -.. , . ...+. n. } ✓ :�. S . ,:. 4 t . k � £ `� >. ... � c , .,. �`'".` is ,rw .q . <br />CITY OF EVE COUNTY, <br />WASHINGTON] <br />NOTES <br />1. STABILIZED CONSTRUCTION ENTRANCE SHILL <br />MEET THE REQUIREMENTS OF WSUQT STANDARD <br />SPECIFICATION 55CTION 8-01.3(7): <br />INSTALL DRIVEWAY CULVERT <br />IF THERE IS A ROADSIDE DITCH <br />PRESENT <br />mmimmumm <br />PERMEABLE BALLAST TYPICAL SEE <br />STANDARD SPECIFICATION <br />SECTION 9 03.9(2) <br />LENGTH AS REQUIRED TIRED 1001 t' <br />MAY BE REDUCED TO 50` MI <br />SITES WITH LESS THAN ONE;. <br />OF EXPOSED SOIL OR APPRE <br />2 <br />' MIN. <br />DIKE, N!`—, T E_ IAL <br />r'omp.-TEp 'ro <br />PROCTOR <br />IMIN. <br />VARIES <br />PLACE CONSTRUCTION GEOTEXTILE FOR SOIL <br />STABILIZATION FROM THE EDGE OF THE EXISTING d PROVIDE FULL WIDTH OF <br />ROADWAY TO THE CONSTRUCTION ENTRANCE, � � RAG; OIL ROCK <br />O9 � � <br />INGRESS/EGRESS ���ss/E��ESs AREA � <br />IL AS DIRECTED BY THE VA INFER OO�`� OM — � 1 ��� �c <br />15' IvldN LEVEL � "� � ,' � 2 L = THE DISTANCE SUCH THAT POINTS ARE OF AL L <br />{It�I. <br />j 1 A' B U ELEVATION <br />V <br />ISOMETRICa�Il,,r} .*q4 _ l€I 1i5,. J Eli; ` ' ROCK SIZE APPROPRIATE <br />WSDO�.T STD PLAN I-80.II-02 ACCEPTABLE SUBSTITUTE t 4laYAila 11 I , FOEEXPECTEDF LO1013 <br />CONSTRUCTION <br />a qdqENTRANCE <br />INTERCEPTOR SWLF ,3PAQINQ 50' - 3Q E, 31f <br />A ;0115 PUBLIC WORKS DEPARTMENT DEPENDING ON St - PE I-I.0 - SPACING BETWEEN <br />CHECK DAM <br />rndalt y <br />rnF�Y~u'�Sw55 h�'.vTHk3i C-R:frF/YJI ✓IFAili ,N1LHF€FA' E31{: 04/03/2017 <br />� C 9 y Al.�l Aor 14 4r �EPA ALAlslI401 <br />{� J <br />�p <br />s <br />CONSTRUCTION ACCESS <br />MIN. <br />CONSTRUCTION ENTRANCE AND EXIT 2 <br />E R�C �EP �TO�R �Sl I C�H �EC�K �DA <br />- - <br />NOT TO SCALE PER DOE BMP C105 COE STD DWG #201 NOT TO SCALE _ PER DOE BMP C200 (3 <br />ADAPTER SKIRT <br />RETRIEVAL STRAP <br />36"_ <br />J" <br />2` <br />_ <br />5" MAX <br />_ <br />OVERFLOW�b��u� <br />GE®TEXTILE, <br />; <br />e <br />(TO BYPASS <br />;_tlg[ <br />FABRIC <br />PEAK STORM, <br />� <br />VOLUMES ) <br />� <br />� � <br />�J ��� ��� ' �" � <br />� � INLET/OUT FALL PIPE <br />24 <br />=x <br />>_ , w. <br />''.,i r.:r 1 k"`! 3-J.9 <br />,q '+s:..3 ,a. S 9 .:�.J..... <br />r��� <br />.. <br />�a� <br />0 <br />�� 0 <br />.>: <br />CATCH BASIN <br />NZIMMENEORCALE PER DOE <br />rO SCALE <br />Know ,=cbelow. <br />Call before u dig. <br />I01mora •; <br />PLASTIC .,€ ;.Ir.,G NOTES <br />`I. PLASTIC SHEETING SHALL HAVE A MINIMUM THICKNESS OF 6 MILS AND SHALL MEET THE <br />REQUIREMENTS OF THE STATE STANDARD SPECIFICATIONS SECTION 9-14.5, <br />2. COVERING SHALL BE INSTALLED AND MAINTAINED TIGHTLY IN PLACE BY USING SANDBAGS OR <br />TIRES ON ROPES WITH A MAXIMUM 10-FOOT GRID SPACING IN ALL DIRECTIONS. ALL SEAMS <br />SHALL BE TAPED OR WEIGHTED DOWN FULL LENGTH AND THERE SHALL BE AT LEAST A 12 INCH <br />OVERLAP OF ALL SEAMS. <br />3. CLEAR PLASTIC COVERING SHALL BE INSTALLED IMMEDIATELY ON AREAS SEEDED BETWEEN <br />NOVEMBER 1 AND MARCH 31 AND REMAIN UNTIL VEGETATION IS FIRMLY ESTABLISHED. <br />4. WHEN THE COVERING IS USED ON UN -SEEDED SLOPES, IT SHALL BE KEPT IN PLACE UNTIL THE <br />NEXT SEEDING PERIOD. <br />5. PLASTIC COVERING SHEET SHALL BE BURIED TWO FEET AT THE TOP OF SLOPES IN ORDER TO <br />PREVENT SURFACE WATER FLOW BENEATH SHEETS. <br />6. PROPER MAINTENANCE INCLUDES REGULAR CHECKS FOR RIPS AND DISLODGED ENDS. <br />SOIL STOCKPILE NOTES <br />1. STOCKPILES SHALL BE STABILIZED (WITH PLASTIC COVERING OR OTHER APPROVED DEVICE) <br />DAILY BETWEEN NOVEMBER 1 AND MARCH 31. <br />2. IN ANY SEASON, SEDIMENT LEACHING FROM STOCK PILES MUST BE PREVENTED. <br />3. TOPSOIL SHALL NOT BE PLACED WHILE IN A FROZEN OR MUDDY CONDITION, WHEN THE <br />SUBGRADE IS EXCESSIVELY WET, OR WHEN CONDITIONS EXIST THAT MAY OTHERWISE BE <br />DETRIMENTAL TO PROPER GRADING OR PROPOSED SODDING OR SEEDING. <br />4. PREVIOUSLY ESTABLISHED GRADES ON THE AREAS TO BE TOPSOILED SHALL BE MAINTAINED <br />ACCORDING TO THE APPROVED PLAN, <br />MULCHING TES PER DOE BMP C121 <br />1, MULCH MATERIALS USED SHALL BE HAY OR STRAW, AND SHALL <br />BE APPLIED AT THE RATE OF 2 TONS/ACRE. (MIN. 2" THICK) <br />2. MULCHES SHALL BE APPLIED IN ALL AREAS WITH EXPOSED <br />L P <br />� ® ES GREATER THAN 2 �.1. <br />3. MULCHING SHALL BE USED IMMEDIATELY AFTER SEEDING OR IN <br />AREAS WHICH CANNOT BE SEEDED BECAUSE OF THE SEASON. <br />4. ALL AREAS NEEDING MULCH SHALL BE COVERED BY <br />NOVEMBER 1, <br />T <br />THE LATEST CITY OF EVERETT DESIGN AND CONSTRUCTION <br />STANDARDS AND SPECIFICATIONS (DCSS) CAN BE FOUND ONLINE AT <br />HTTP://EVERETTWA.GOV/1531/DESIGN-CONSTRUCTION-STANDARDS <br />TACOMA ° SEATTLE ° SP® NE ° TRI-CITIES <br />14241 NE WOODINVILLE-DUVALL ROAD, SUITE 135 <br />WOODINVILLE, WA 96072 <br />Sheet Tidy: <br />TESC NOTES AND <br />DETAILS <br />D� Checkgg by- <br />TDW/RKJ TDW/TDS BBB <br />Sheet No. <br />DATE: July 24, 2020 FILENAME: Q:\2018\2130309\10oCIV\CAD\2130309-SH-TESC-DETL.dwg <br />