My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
859 LOCUST ST 2017 Plans 2022-12-27
>
Address Records
>
LOCUST ST
>
859
>
Plans
>
859 LOCUST ST 2017 Plans 2022-12-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2022 10:41:34 AM
Creation date
4/18/2022 11:14:05 AM
Metadata
Fields
Template:
Address Document
Street Name
LOCUST ST
Street Number
859
Permit
PW1707-006
Year
2017
Notes
GRANDVIEW APARTMENTS CLUBHOUSE & PARKING
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S88° 41' 02"E <br />9. FINE GRADE PARKING LOT AND INSTALL PAVEMENT. SWEEP OR <br />WASH ROADWAYS EACH WORK DAY OF SEDIMENT THAT IS <br />TRACKED ON PAVEMENT. <br />10. INSTALL POWER, TELEPHONE, CABLE TELEVISION AND GAS <br />LINES. <br />11. CONSTRUCT SIDEWALKS. <br />12. GRADE TO FINISHED GRADE (FG) PER GRADING PLAN. MULCH <br />AND PERMANENT SEED AS GRADING IS COMPLETED. <br />13. REMOVE TEMPORARY EROSION CONTROL FACILITIES ONLY AFTER <br />ENTIRE SITE IS STABILIZED AND THE POTENTIAL FOR EROSION <br />HAS PASSED. <br />14. CLEAN AND FLUSH STORM DRAIN SYSTEM OF ALL SILT. <br />On <br />0 <br />v <br />Q Q <br />m m <br />s <br />0 10 20 40 <br />6m?=6=mm� <br />STANDARD PRACTICE <br />CONTRACTOR TO INSTALL AND MAINTAIN ALL EROSION CONTROL BMPS AS SHOWN ON THIS PLAN <br />BE SAWCUT <br />IN ACCORDANCE WITH DEPARTMENT OF ECOLOGY STORMWATER POLLUTION PREVENTION <br />REQUIREMENTS SUMMARIZED ON SHEET C4. IF BMP INSTALLATION AND MAINTENANCE IS <br />INADEQUATE TO MEET THESE REQUIREMENTS CONTRACTOR TO PROVIDE ADD111ONAL BMPS AT NO <br />ADD11IONAL COST TO OWNER: <br />1ES, INCLUDING <br />LINES. <br />CODE <br />)RS. <br />STABILIZED CONSTRUCTION ENTRANCE/EXIT <br />ES. <br />CE (D.O.E. BMP C105) <br />CL CLEARING LIMITS & HIGH VISIBILITY FENCE (D.O.E. BMP C103) <br />CLF CHAIN LINK CONSTRUCTION FENCE <br />SDUST CONTROL (D.O.E. BMP C140) <br />IDS INTERCEPTOR SWALE W/ ROCK CHECK DAM (D.O.E. BMP C200) <br />CATCH BASIN/INLET SEDIMENT PROTECTION <br />IP <br />(WSDOT STD PLAN 1-40.20-00 & D.O.E. BMP C220) <br />MU MULCH (D.O.E. BMP C121) <br />PC PLASTIC COVERING (D.O.E. BMP C123) <br />PS TEMPORARY & PERMANENT SEEDING (D.O.E. BMP C120) <br />SB SEDIMENT BASIN / TRAP (D.O.E. BMP C241) <br />SF TEMPORARY SILT FENCE (D.O.E. BMP C233) <br />1. OBSERVE EROSION CONTROL MEASURES AT THE BEGINNING AND END OF EACH DAY. <br />REPAIR AND OR REPLACE AS NECESSARY TO ASSURE PROPER FUNCTION. <br />2. OBSERVE COLLECTION FACILITIES DURING PERIODS OF HEAVY RAINFALL AND WET <br />WEATHER CONDITIONS. <br />3. OBSERVE AND MONITOR STABILIZATION TECHNIQUES UNTIL CLUBHOUSE <br />CONSTRUCTION IS STARTED. MAKE REPAIRS AND/OR ALTERATION AS NECESSARY TO <br />PREVENT EROSION. <br />1. SCHEDULE TO ATTEND PRECONSTRUCTION CONFERENCE. <br />CONFERENCE TO INCLUDE A CERTIFIED EROSION CONTROL <br />SPECIALIST. <br />2. FIELD STAKE AND FLAG CLEARING LIMITS PRIOR TO <br />COMMENCEMENT OF CONSTRUCTION. <br />3. INSTALL ORANGE FILTER FABRIC SILT FENCE PRIOR TO <br />COMMENCEMENT OF CONSTRUCTION. <br />4. INSTALL TEMPORARY GRAVEL CONSTRUCTION ENTRANCE. <br />5. CLEAR WITHIN FLAGGED LIMITS. <br />6. ROUGH GRADE ROADS AND LOTS TO STRUCTURAL SUBGRADE <br />ELEVATION (SG). SEE TYPICAL LOT GRADING SECTION ON <br />SHEET C4.1. <br />7. CONSTRUCT RAIN GARDENS <br />8. INSTALL SANITARY SEWER, STORM DRAINAGE AND WATER <br />SYSTEMS. INSTALL STORM DRAIN INLET PROTECTION ON CATCH <br />BASINS AS CONSTRUCTED TO CONTROL SEDIMENT FROM <br />ENTERING SYSTEM. <br />. • <br />a •. <br />a <br />• <br />• <br />�. •: <br />) <br />4 <br />ROJECT NUMBER: <br />DRAWING FILE <br />Ec—IM-002—RMCA0009.dwg <br />89.32 <br />Q <br />�[ 2 olo . <br />9 E'T NO. <br />r0) <br />cti <br />aN <br />Na <br />Z254 <br />
The URL can be used to link to this page
Your browser does not support the video tag.