Laserfiche WebLink
An <br />—r <br />OFFICE ,a <br />ic C <br />OFFIC((' ''��E �� 9 <br />F }}^aa <br />ir-(r <br />LAYER OF Shr GW B. FINISH <br />ON THE INSIDE OF WALL <br />ON THE OUTSIDE <br />6"MTL STUD FRAMING <br />v <br />LAYER OF SIO GWB. FINISH <br />ON THE INSIDE OF WALL <br />LAYER OF METAL PANEL CLADDING <br />ON THE OUTSIDE <br />3 6/8" MTL. STUD FRAMING <br />@ 16" O.C. <br />SOUND INSUL. <br />248'-6s (-itJj'._'..'.' <br />CONDITIONED <br />LAYER OF 5/6°' GWB. FINISH <br />BOTH SIDES <br />3 616° MTL. STUD FRAMING <br />0 16. O.C. <br />MULLION <br />m <br />MAIN FLOOR PLAN - T1 -A <br />FLOORLEGEND <br />AREA OF WORK <br />EXISTING WALL <br />(� NEW METAL FRAMED WALL <br />W/ PLYWOOD FINISH <br />NEW METAL FRAMED WALL <br />WA GWB FINISH <br />NEW STOREFRONT WALL W1 <br />ROLYCARBO TE / GLASS GLAZING <br />IE <br />FN <br />rUTURE OFFICE <br />0ALUMINUM '.'��+ <br />® FIRE HOSE DD SET 311512021 <br />07) 10' x 12' SFCTIO L DOOR <br />0 <br />MCC <br />uj <br />UA <br />V- <br />®ravm <br />