Laserfiche WebLink
0 <br />O N <br />AR p OP 71. <br />N � <br />N i <br />S:ECTION TO <br />4 <br />0 <br />13, '1 �.% o \ W <br />I_ o a Ld <br />r r, �, }- U Q <br />WXI rtN .. <br />0:. <br />to <br />is <br />33 W Z W <br />j z . QLj <br />fim __ v . _ ._....., _ .:._ m, U W <br />�. _. .. _ _ _ .,. .... y W W W <br />— — — . -�- BASIC SOIL AMENDMENT NOTES fl U <br />N <br />011 <br />} , <br />SOIL RETENTION. RETAIN IN AN UNDISTURBED STATE THE DUFF LAYER AND NATIVE TOPSOIL TO THE MAXIMUM `EXTENT PRACTICABLE. IN t <br />`i q <br />W N �- O <br />�: k "ENCE 0.6. W. ANY AREAS REQUIRING GRADING REMOVE AND STOCKPILE THE DUFF LAYER AND TOPSOIL ON SITE IN A DESIGNATED, CONTROLLED AREA, 4 � N <br />k r > O� T A 'JAC NT TO PUBLi IC AREA TO B'E REAPPLIED TO OTHER PORTIONS OF THE SITE WHERE FEASIBLE: N r i <br />NO D E C RESOURCES AND CRlT AL S, <br />.�.� S. FROM � PROPERTY Y _ <br />CORM:, <br />' SOIL QUALITY: ALL AREAS SUBJECT TO CLEARING AND •GRADING THAT HAVE NOT BEEN .COVERED BY IMPERVIOUS SURFACE, INCORPORATED L < <br />N <br />INTO A DRAINAGE FACILITY OR ENGINEERED AS STRUCTURAL FILL OR SLOPE SHALL, AT PROJECT COMPLETION, DEMONSTRATE THE <br />FOLLOWING; �N <br />mow- ;n <br />i LOT 3 LOT ¢ ( 1. A TOPSOIL LAYER WITH A MINIMUM ORGANIC MATTER CONTENT OF 10% DRY WEIGHT IN PLANTING BEDS, AND. 5% ORGANIC MATTER . <br />4,781 SF <br />4,365 SF CONTENT IN TURF AREAS, AND A PH FROM 6.0 TO 8.0 OR MATCHING THE 'PH OF THE UNDISTURBED SOIL. THE TOPSOIL LAYER SHALL �� <br />LOT 2 *�;143 SF NET <br />HAVE A MINIMUM DEPTH OF EIGHT INCHES IGH I C EXCEPT WHERE TREE ROOTS LIMIT THE DEPTH OF INCORPORATIONOF AMENDMENTS NEEDED <br />• <br />4,365 SF ( TO MEET THE CRITERIA. SUBSOILS BELOW THE TOPSOIL LAYER SHOULD BE SCARIFIED AT LEAST 4 INCHES' WITH SOME INCORPORATION ' <br />1 <br />OF THE UPPER MATERIAL TO AVOID STRATIFIED LAYERS, WHERE FEASIBLE. <br />I 2. MULCH PLANTING BEDS WITH 2 INCHES OF ORGANIC MATERIAL �� •••...::• '. <br />3. USE COMPOST AND OTHER MATERIALS THAT MEET THESE ORGANIC CONTENT REQUIREMENTS: S0r `f <br />a. THE ORGANIC CONTENT FOR 'PRE-APPROVED"AMENDMENT RATES CAN BE MET ONLY USING COMPOST MEETING THE COMPOST <br />j SPECIFICATION FOR BMP T7.30: BIORETENTION CELLS, SWALES, AND PLANTER BOXES (P.959), WITH THE EXCEPTION THAT THE <br />f <br />I COMPOST MAY HAVE UP TO 35% BIOSOLIDS OR MANURE. THE COMPOST MUST ALSO HAVE AN ORGANIC MATTER CONTENT OF 40% TO <br />657., AND A CARBON TO NITROGEN RATIO BELOW 25:1. THE CARBON TO NITROGEN RATIO MAY BE AS HIGH AS 35:1 FOR PLANTINGS <br />COMPOSED ENTIRELY OF PLANTS NATIVE TO THE PUGET SOUND LOWLANDS REGION, <br />a ` b. CALCULATED AMENDMENT RATES MAY BE MET THROUGH USE OF COMPOSTED MATERIAL MEETING A. ABOVE;• OR OTHER ORGANIC <br />E F I <br />€�F { ILRSEC ION- MATERIALS AMENDED TO MEET THE CARBON TO NITROGEN RATIO REQUIREMENTS AND NOT EXCEEDING THE CONTAMINANT LIMITS <br />N PROPERTY LINEQ .. a IDENTIFIED IN TABLE 220 B, TESTING PARAMETERS, IN WAC 173-350-220. <br />A. <br />as THE RESULTING SOIL SHOULD BE CONDUCIVE TO THE TYPE OF VEGETATION TO BE ESTABLISHED. <br />"-'w71 z t rye ,» a <br />o� ° i IMPLEMENTATION OPTIONS: THE SOIL QUALITY DESIGN GUIDELINES LISTED ABOVE CAN BE MET BY USING ONE OF THE METHODS LISTED �j <br />d : 'a ARE 'A' G <br />a' E a 11,210 SF BELOW: �... <br />1. LEAVE UNDISTURBED NATIVE VEGETATION AND SOIL, AND PROTECT FROM COMPACTION DURING CONSTRUCTION. <br />µ 2 AMEND EXISTING SITE TOPSOIL OR SUBSOIL EITHER AT DEFAULT 'PRE —APPROVED" RATES, OR AT CUSTOM CALCULATED RATES BASED <br />V <br />xF <br />ON TESTS OF THE SOIL AND AMENDMENT. <br />3. STOCKPILE EXISTING TOPSOIL DURING GRADING, AND REPLACE IT PRIOR TO PLANTING. STOCKPILED TOPSOIL MUST ALSO BE AMENDED <br />t <br />xr IF NEEDED TO MEET THE ORGANIC MATTER OR DEPTH REQUIREMENTS, EITHER AT A DEFAULT `PRE —APPROVED„ RATE OR AT A CUSTOM <br />4 R y CALCULATED RATE. <br />�fe 4. IMPORT TOPSOIL MIX OF SUFFICIENT ORGANIC CONTENT AND DEPTH TO - MEET THE REQUIREMENTS. <br />o EX. HOUSE <br />MORE THAN ONE METHOD MAY BE USED ON DIFFERENT PORTIONS OF THE SAME SITE. SOIL THAT ALREADY MEETS THE DEPTH AND <br />ORGANIC MATTER QUALITY STANDARDS, AND IS NOT COMPACTED, DOES NOT NEED TO BE AMENDED. <br />AREA A AREA B <br />_ STOCKPILE AND UNCOMPACTED, UNGRADED, <br />a e _. AMEND SOIL IF UNDISTURBED �-- N <br />f„ <br />'4 Epfi tY - <br />00 <br />WLO � m LOT 5 > cv 000 rn <br />NECESSARY "OPTION 3" <br />fEa# ro 5,850 SF <br />LOT i N <br />\ a 4, 450 SF NET <C o to <br />EX. HOUSE c� rn <br />O c) <br />5,850 SF <br />4,449 SF NET; <br />l- NOTE; <br />a Z � <br />ACCORDING TO THE GEOTECHNICAL STUDY <br />' PROVIDED BY COBALT GEOSCIENCES THE <br />f <br />3 <br />L <br />R TABLE WILL BE MORE THAN Z <br />-' .GROUND WATER <br />.: w 12 INCHES BELOW THE BASE OF THE <br />4 . w: <br />SD <br />---=--- -�- PROPOSED SYSTEM ELEVATIONS, THEREFOR W <br />CONTRACTOR SHALL VERIFY SOIL <br />W. <br />BENCHMARK <br />CONDITIONS DURING CONSTRUCTION. <br />3 EL=573.705ro <br />_ CITY OF EVERETT" Z <br />d0 STA# 678-28-04 W <br />1OOTH S7 SW N8'07'10"E 663:04f ?23+00-NAND 88 _ <br />20+75 21 +00 --}------ 9— —� --- --I-- - <br />;,� ::;� ._...... ....., � ,w <br />E.sS.< S iyi l"I " > _ 01 I NZ....t� £'`3 ..3 <br />IE 567.INTERSECTION f : 0 <br />100TH ST SW (STA 22+00.00) 8,_)9 (} Z <br />ACCESS TRACT STA 1 +00.00 _._._.. _ _ ._ .. <br />2 ;, t <br />, T <br />i 7 ' s ' <br />_ .._ i = _ g. ....�1 Ocri <br />F" <br />"'.,....""_......,.,_.................. "ems __- >rh."'•`k <br />M <br />Ir <br />® (�/ o <br />E=575.4.0(W 2"ADS' ING <br />iRE <br />jam(/ <br />Know what's below. Wvj <br />0 20 40 Call two business 0w o <br />/®�! _ ,z <br />HORIZONTAL SCALE da sbefore you diJ• t)Q zW r � <br />0 <br />N <br />i..i <br />0 <br />_ <br />U <br />d <br />- <br />- <br />PROJ. NO. <br />DSN. BY: <br />19-1109 <br />JMS <br />DATE: <br />12/2/20 <br />II��..e' , <br />WF <br />FOR S5f <br />s s <br />SCALE: <br />1 tt + 20' <br />DRAWING NO. <br />1010 <br />SS19-010 <br />�F <br />